Use of an executable model to represent the behavior of an object is called
A. Simulation
B. Software item
C. Software feature
D. None of the above

1 Answer

Answer :

A. Simulation

Related questions

Description : Verification performed without any executable code is referred to as A. Review B. Static testing C. Validation D. Sanity testing

Last Answer : B. Static testing

Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing ... after system testing. A. Water Fall Model B.V-Model C. Spiral Model D. RAD Model

Last Answer : B.V-Model

Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing after component testing, and

Last Answer : B.V-Model

Description : The primary goal of comparing a user manual with the actual behavior of the running program during system testing is to A. Find bugs in the program B. Check the technical accuracy of the document

Last Answer : B. Check the technical accuracy of the document

Description : Item transmittal report is also known as A. Incident report B. Release note C. Review report D. Audit report

Last Answer : B. Release note

Description : Features to be tested, approach, item pass/fail criteria and test deliverables should be specified in which document? a) Test case specification b) Test procedure specification c) Test plan d) Test design specification

Last Answer : c) Test plan

Description : This life cycle model is basically driven by schedule and budget risks This statement is best suited for A. Water fall model B. Spiral model C. Incremental model D. V-Model Q33. The bug tracking ... these phases for each bug. I. Phase injected II. Phase detected III. Phase fixed IV. Phase removed

Last Answer : B. I, II and IV

Description : Test data planning essentially includes A. Network B. Operational Model C. Boundary value analysis D. Test Procedure Planning

Last Answer : C. Boundary value analysis

Description : The structure of an incident report is covered in the Standard for Software Test Documentation IEEE 829 and is called as : - a) Anomaly Report b) Defect Report c) Test Defect Report d) Test Incident Report

Last Answer : a) Anomaly Report

Description : Testing of software used to convert data from existing systems for use in replacement systems A. Data driven testing B. Migration testing C. Configuration testing D. Back to back testing

Last Answer : B. Migration testing

Description : Which of the following is a requirement of an effective software environment? I. Ease of use II. Capacity for incremental implementation III. Capability of evolving with the needs of a project IV. Inclusion of advanced tools A.I, II &III B.I, II &IV C.II, III&IV D.I, III&IV

Last Answer : A.I, II &III

Description : Which testing methods are used by end-users who actually test software before they use it? A. Alpha & Beta Testing B. White Box Testing C. Black Box Testing D. Trial & Error Testing

Last Answer : A. Alpha & Beta Testing

Description : Which of the following will be the best definition for Testing :- a) The goal / purpose of testing is to demonstrate that the program works. b) The purpose of testing is to demonstrate that the ... does what it is supposed to do. d) Testing is executing Software for the purpose of finding defects.

Last Answer : d) Testing is executing Software for the purpose of finding defects.

Description : Regression testing should be performed: i. every week ii. after the software has changed iii. as often as possible iv. when the environment has changed v. when the project manager says a) i & ii are true, iii, iv & v are ... iv are true, i, iii & v are false d) ii is true, i, iii, iv & v are false

Last Answer : c) ii & iv are true, i, iii & v are false

Description : Match every stage of the software Development Life cycle with the Testing Life cycle: i. Hi-level design a Unit tests ii. Code b Acceptance tests iii. Low-level design c System tests iv. Business requirements d Integration tests a) i-d , ii ... i-b , ii-a , iii-d , iv-c d) i-c , ii-a , iii-d , iv-b

Last Answer : d) i-c , ii-a , iii-d , iv-b

Description : Repeated Testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or ... software component: a) Re Testing b) Confirmation Testing c) Regression Testing d) Negative Testing

Last Answer : c) Regression Testing

Description : Which of the following has highest level of independence in which test cases are : a) Designed by persons who write the software under test b) Designed by a person from a different sectionc) Designed by a person from a different organization d) Designed by another person

Last Answer : c) Designed by a person from a different organization

Description : System test can begin when? I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting II. The development team provides software to the test team 3 business days prior ... . I and II only B. II and III only C. I and III only D. I, II and III

Last Answer : D. I, II and III

Description : A type of integration testing in which software elements, hardware elements, or both are combined all at once into a component or an overall system, rather than in stages. A. System Testing B. Big-Bang Testing C. Integration Testing D. Unit Testing

Last Answer : B. Big-Bang Testing

Description : A type of integration testing in which software elements, hardware elements, or both are combined all at once into a component or an overall system, rather than in stages. A. System Testing B. Big-Bang Testing C. Integration Testing D. Unit Testing

Last Answer : B. Check the technical accuracy of the document

Description : A type of integration testing in which software elements, hardware elements, or both are combined all at once into a component or an overall system, rather than in stages. A. System Testing B. Big-Bang Testing C. Integration Testing D. Unit Testing

Last Answer : B. Big-Bang Testing

Description : Which of the following functions is typically supported by a software quality information system? I. Record keeping II. System design III. Evaluation scheduling IV. Error reporting A.I, II&III B.II, III &IV C.I, III &IV D.I, II & IV

Last Answer : C.I, III &IV

Description : A project manager has been transferred to a major software development project that is in the implementation phase. The highest priority for this projectmanager should be to A. Establish a relationship with ... the manager' s management style D. Ensure that the project proceeds at its current pace

Last Answer : B. Learn the project objectives and the existing project plan

Description : Which of the following characteristics is primarily associated with software reusability? A. The extent to which the software can be used in other applications B. The extent to which the software can ... moved to a different platform D. The capability of one system to be coupled with another system

Last Answer : B. The extent to which the software can be used by many different users

Description : Which of the following statements is true about a software verification and validation program? I. It strives to ensure that quality is built into software. II. It provides management with insights into the state ... software development activities. A. I, II&III B.II, III&IV C.I, II&IV D.I, III&IV

Last Answer : C.I, II&IV

Description : Which of the following software change management activities is most vital to assessing the impact of proposed software modifications? A. Baseline identification B. Configuration auditing C. Change control D. Version control

Last Answer : C. Change control

Description : COTS is known as A. Commercial off the shelf software B. Compliance of the software C. Change control of the software D. Capable off the shelf software

Last Answer : A. Commercial off the shelf software

Description : For final software acceptance testing, the system should include A. Delivered software B. All user documents C. Final version of oth

Last Answer : D. All of the above

Description : In preparation for developing the acceptance criteria, the user should A. Know the defects in the application B. Acquire the basic knowledge of the application for which the system is ... D. Know new enhancement and basic understanding of how the application is implemented in users organization

Last Answer : Understand the risks and benefits of the development methodology that is to be used in correcting the software system

Description : Which is not the responsibility of customer/ user of the software A. Plan how and by whom each acceptance activity will be performed B. Prepare the acceptance plan C. Prepare resource plan D. Plan resources for providing information on which to base acceptance decisions

Last Answer : C. Prepare resource plan

Description : Which of the following is not decided in the test-planning phase? A. Schedules and deliverables B. Hardware and software C. Entry and exit criteria D. Types of test cases

Last Answer : D. Types of test cases

Description : Software testing activities should start A. As soon as the code is written B. During the design stage C. When the requirements have been formally documented D. As soon as possible in the development lifecycle

Last Answer : C. When the requirements have been formally documented

Description : The purpose of software testing is to A. Demonstrate that the application works properly B. Detect the defects C. Validate the logical design

Last Answer : A. Demonstrate that the application works properly

Description : What is COTS? A. Commercial On-the-shelf software B. Commercial off-the-shelf software C. Common Offshore testing Software

Last Answer : B. Commercial off-the-shelf software

Description : Preparedstatement Object in JDBC is used to execute ........................... queries. A) executable B) simple C) high level D) parameterized

Last Answer : D) parameterized

Description : Prepared Statement object in JDBC used to execute........... queries. A) Executable B) Simple C) High level D) Parameterized

Last Answer : D) Parameterized

Description : The Provision and Management of a controlled library containing all the configurations items is called as a) Configuration Control b) Status Accounting c) Configuration Identification d) Configuration Identification

Last Answer : The provision and management of a controlled library containing all the configuration items is called Configuration Management. Configuration Management is the process of identifying, organizing, and ... Verification and Audit (ensuring that the configuration items are complete and accurate).

Description : Peer Reviews are also called as :- a) Inspection b) Walkthroughc) Technical Review d) Formal Review

Last Answer : Technical Review

Description : . Consider the above state transition diagram of a switch.Which of the following represents an invalid state transition? a) OFF to ON b) ON to OFF c) FAULT to ON Q15. Peer Reviews are also called as :- a) Inspection b) Walkthrough

Last Answer : c) FAULT to ON

Description : ……………….. level is where the model becomes compatible executable code A) Abstract level B) Application level C) Implementation level D) All of the above

Last Answer : C) Implementation level

Description : Which of the following is true about White and Black Box Testing Technique:- a) Equivalance partitioning, Decision Table and Control flow are White box Testing Techniques. b) Equivalence partitioning ... , State Transition , Use Case Testing and Decision Table are White Box Testing Techniques.

Last Answer : c) Equivalence partitioning , State Transition , Use Case Testing are black box Testing Techniques.

Description : We use the output of the requirement analysis, the requirement specification as the input for writing :- a) User Acceptance Test Cases b) Integration Level Test Cases c) Unit Level Test Cases d) Program specifications

Last Answer : a) User Acceptance Test Cases

Description : There is one application, which runs on a single terminal. There is another application that works on multiple terminals. What are the test techniques you will use on the second application that ... B. Concurrency test, Scalability C. Update & Rollback, Response time D. Concurrency test, Integrity

Last Answer : C. Update & Rollback, Response time

Description : A test manager wants to use the resources available for the automated testing of a web application. The best choice is A. Test automater, web specialist, DBA, test lead B. Tester, test automater, web ... C. Tester, test lead, test automater, DBA D. Tester, web specialist, test lead, test automater

Last Answer : B. Tester, test automater, web specialist, DBA

Description : Decision to stop testing should be based upon A. Successful use of specific test case design methodologies B. A percentage of coverage for each coverage category C. Rate of error detection falls below a specified threshold D. All of the above

Last Answer : D. All of the above

Description : Range of accelerating factor is a) 50 to 100 b) 1.3 to 1.7 c) 1 to 10 d) 10.8 to 11.2

Last Answer : b) 1.3 to 1.7

Description : In case of Large Systems :- a) Only few tests should be run b) Testing should be on the basis of Risk c) Only Good Test Cases should be executed. d) Test Cases written by good test engineers should be executed.

Last Answer : b) Testing should be on the basis of Risk

Description : Which of the following helps in monitoring the Test Progress:- i. Percentage of Test Case Execution ii. Percentage of work done in test environment preparation. iii. Defect Information e.g. defect density, ... ii,iii are correct and iv is incorrect c) i,ii are correct and iii,iv are incorrect

Last Answer : b) i,ii,iii are correct and iv is incorrect

Description : Exit Criteria may consist of :- i. Thoroughness measures , such as coverage of code, functionality or risk ii. Estimates of Defect density or reliability measures. iii. Residual risk such as defects not fixed or ... correct and i,ii,iii are incorrect d) iii and iv are correct and i,ii are incorrect

Last Answer : b) i,ii,iii is correct and iv is incorrect