A can build up a wall in 8 days while B can break it in 3 days. A has worked for 4 days and then B joined to work with A for another 2 days only. In how many days will A alone build up the remaining part of the wall?
a) 13/3 days
b) 22/3 days
c) 7/4 days
d) 7 days
e) None of these

1 Answer

Answer :

Amount of work done by A in one day = 1/8th of the total work
B can break 1/3rd of the work in one day
Therefore, if both of them are working together then the work done in one day = 1/8 –
1/3 = -5/24
Negative sign indicates that, work is more broken than built in one day
Amount of work done by A in four days = 1/2 of the total work
Work done by both A and B for two days = -10/24 = -5/12
Total work done by the end of 6 days = 1/2 - 5/12 = 1/12
Remaining work = 1 – 1/12 = 11/12
Time taken by A to finish 11/12th of the work = 11/12 × 8 = 22/3 days
Answer: b)

Related questions

Description : Three pipes A, B and C can fill a tank in 6 hours. After working at it together for 2 hours, C is closed and A and B can fill the remaining part in 7 hours. The number of hours taken by C alone to fill the tank is: a) 10 b) 14 c) 12 d) 13 e) 15

Last Answer : (A+B+C) - (A+B) (A+B+C) =1/6 and (A+B+C) in 2hrs=2/6 and remaining part 1-2/6=2/3. So (A+B) in 7 hrs is 2/ (3*7) =2/21. 1/6-2/21=1/14 so answer is 14. Answer: b)

Description : A task was assigned to P, Q and R to be completed by not more than seven days. P alone can complete the task in ten days. Q alone can complete the task in twelve days and R alone can complete the task in fifteen days. ... will remain after four days? a) 3/10 b) 1/15 c) 1/9 d) 5/16 e) None of these

Last Answer : 1day's work of (P + Q+ R) = 1/10 + 1/12 +1/15 = 15/60 2 day's work of (P + Q+ R) = 15/60 × 2 = 1/2 1 day's work of (P+Q) = 1/10 +1/12 = 11/60 2 day's work of (P+Q) = 11/60 × 2 = 11/30 Rem. work of 4 days = 1- 1/2 + 11/30 = 2/15 Answer: e)

Description : 8 men and 4 women-together can complete a piece of work in 6 days. Work done by a man in one day is double the work done by a woman in one day. If 8 men and 4 women started working and after 2 days, 4 men ... more days will the work be completed? a) 7 days b) 6 days c) 5 days d) 8 days e) 4 days 

Last Answer : 1 man = 2 women 8 men + 4 women = 20 women 2 day's work of 20 women = 20 × 6/1 = 20 × 2/x x =1/3 Remaining work = 1 – 1/3 = 2/3 Total number of females = 16 20 × 6/1 = 16 × x ÷2/ 3 x = 5 days Short Cut M1D1=M2D2+M3D3 10x6 =10x2 + 8 x 60-20= 8x x= 5 days Answer: c)

Description : M & N do a certain work in 40 days and 24 days respectively. M started the work alone and then after 8 days N joined him till the completion of the work. How long did the work last? a) 16days b) 18days c) 20 days d) 22 days

Last Answer : C Work done by M in 8 days = 1/40*8 =1/5 Remaining work = 1-1/5 = 4/5 (M+N)’s 1 day work = 1/40 + 1/24 =(3+5)/120 =8/120 =1/15 Now 1/15 work is done by M & N in 1 day. So 4/5 work will be done by X and Y is, =15 / 1 * 4/5 =12 days Hence total time taken = 12+8 = 20 days

Description : In 165 litres of mixtures of milk and water, water is only 28%. The milkman sold 40 litres of this mixture and then he added 30 litres of pure milk and 13 litres of pure water in the remaining mixture. What is the percentage ... mixture? 1) 29.35% 2) 28. 57% 3) 24. 57% 4) 27. 75% 5) 26. 57%

Last Answer : 2) 28. 57%

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : 13.5 × 14 + 22.5 × 18 – 4.7 × 30 = ? a) 405 b) 423 c) 435 d) 453 e) 481

Last Answer : ?=189+405-141 = 453 Answer: d)

Description : A and B working alone can finish a job in 5 days and 7 days respectively. They work at it alternately for a day. If A starts the work, find in how many days the job will be finished? a) 29/5 b) 11/5 c) 24/5 d) 21/5 e) None of these

Last Answer : Work done by A in one day = 1/5 and work done by B in one day = 1/7 They are working alternately. Therefore, Work done in first two day = (1/5 + 1/7) = 12/35 Work done in first four day = 24/35 Work done in ... = 4/35/1/7 = 4/5 of the day. Therefore Total days taken = 5 + 4/5 = 29/5 days Answer: b)

Description : The average age of 30 students in a class is 12 years. The average age of a group of 5 of the students is 10 years and that of another group of 5 of them is 14 years. The average of the remaining students is : a) 8 years b) 10 years c) 12 years d) 14 years e) 15 years

Last Answer : Let it be x . Then : 5×10+5×14+20×x=30×12 20x=360-120 or 20x=240 or x = 12 Answer: c)

Description : The average price of 10 books is Rs. 12 while the average price of 8 of these books is Rs. 11.75. Of the remaining two books, if the price of one book is 60% more than the price of the other, what is the price of ... and Rs 16 B.Rs 12 and Rs 24 C.Rs 24 and Rs 18 D.Rs 28 and Rs 12 E.None of these

Last Answer : Answer - A (Rs 10 and Rs 16) Explanation - Total price of the two books = Rs. [(12 x 10) - (11.75 x 8)] = Rs. (120 - 94) = Rs. 26 Let the price of one book be Rs.x Then, the price of other book = Rs. (x ... /5)x= (8/5)x so, x +(8/5)x=26 , x=10 The prices of the two books are Rs. 10 and Rs. 16

Description : What least number would be subtracted from 427398 so that the remaining number is divisible by 15? 1. 13 2. 3 3. 16 4. 11 5. 14

Last Answer : Answer- 2 ( 3) Explanation:- On dividing 427398 by 15 we get the remainder 3, so 3 should be subtracted 

Description : P, Q and R can do a piece of work in 18,24 and 36 days on the second day and P on the third day, again R on the fourth day and so on. Then in how, many days will the work be completed? 1. 25 2. 24 3. 22 4. 20 5. 26

Last Answer : 2;

Description : A started a business with Rs. 21,000 and is joined afterwars by B with Rs. 36,000. After how many months did B join if the profits at the end of the year are divided equally? A.8 months B.2 months C.5 months D.7 months

Last Answer : Answer – C (5 months) Explanation – let B joined after x months Then, 21000 x 12 = 36000 x (12 – x)36 = 180x = 5Hence, B joined after 5 months

Description : Hemant sold 10 sarees for a total profit of Rs. 460 and 12 sarees for a total profit of Rs. 144. At what profit per saree should he sell the remaining 20 sarees so that he gets an average profit of Rs. 18 per sarees? A. Rs 7.10 B. Rs 7.60 C. Rs 7.99 D. Rs 8

Last Answer : Answer – B (Rs 7.60) Explanation – Total profit required = Rs.(42 x 18) = Rs.756 Profit on 22 sarees = Rs. (460 + 144) = Rs. 604 Profit on 20 sarees = Rs. (756 – 604) = Rs. 152 Average profit on these sarees = Rs.(152/20) = Rs. 7.60

Description : 13, 15, 22, 50, 113, ? a) 239 b) 272 c) 287 d) 296 e) 306

Last Answer : Answer: a)

Description : Ram, Suresh and Shilpa, working together, can do a piece of work in 1 day. Ram is thrice as efficient as Suresh, and Suresh takes twice the number of days as Shilpa takes to do it alone. What is the difference between ... and Shilpa, each working alone, to complete the work? a) 1 b) 2 c) 3 d) 4 e) 5

Last Answer : Let the time taken by Ram, Suresh and Shilpa to finish the work alone be A, B and C respectively Therefore, 1/A + 1/B + 1/C = 1 Also it is given that, A = B/3 and C =B/2 3/B + 1/B + ... between the number of days taken by Ram and Shilpa, each working alone, to complete the work = 3-2 = 1 Answer: a)

Description : 8 male can finish a work in 6 days.12 female can complete the same work in 9 days. 6 male and 4 female started working and after 4 days 3 more female joined them. How many days will they now take to complete the remaining work? a) 76/41 days b) 25/62days c) 3/31days d) 4/77days

Last Answer : A 1 male's 1 day work = 1/48 1 female's 1 day work = 1/108 Work done in 4 days = 4 (6/48 +4/108) =4(1/8+1/27) =1/2+4/27 =(27+8)/54 =35/54 Remaining work = (1 - 35/54) = 19/ ... (27+14)/216 =41/216 Now 41/216 work is done by them in 1 day Therefore time taken = 216/41 * 19/54 = 76/41 days

Description : The sum of 5 natural numbers A, B, C, D, E is 126. It is known that A:B = 7:8, B:C = 2:3, C:D = 4:5, D:E = 5:7.What is the difference between A and E? a) 14 b) 22 c) 24 d) 28 e) 32

Last Answer : A:B = 7:8 B:C = 2:3 = 8:12 SO, A:B:C = 7:8:12 C:D = 4:5 = 12:15 A:B:C:D = 7:8:12:15 D:E = 5:7 = 15:21 SO, A:B:C:D:E = 7:8:12:15:21 given x(7+8+12+15+21) = 126 or 63x = 126 or x =2 E – A = 21X – 7X = 14X = 28 Answer: d)

Description : The average age of a family of 6 members is 22 years. If the age of the youngest member be 7 years, then what was the average age of the family at the birth of the youngest member? A.15 B.18 C.28 D.24 E.None of these

Last Answer : Answer – B (18) Explanation – Total age of all members = 6 x 22 = 132 years 7 years ago, total sum of ages = 132 – (6 x 7) = 90 years But at that time there were 5 members in the family Average at that time = 90 /5 = 18 years

Description : 2/3 part of the sum is lent out at 3%, 1/6 part is lent out at 6% and remaining part at 12%. All the three parts are lent out at simple interest. If the annual income is Rs. 35, what is the sum? (a) Rs.500 (b) Rs.600 (c) Rs.700 (d) Rs.850 (e) Rs.950

Last Answer : (c) Rs.700

Description : Francis and George started a business with investments of Rs.7000 and Rs.10000. After x months, Francis left. After two more months David joined the business with an investment of Rs.10000. If the annual profit is shared among David, ... which they stayed that year. a)5:5:12 b)1:1:3 c)1:1:4 d)1:1:2

Last Answer : a)5:5:12

Description : 48 boys complete a work in 36 days. After they have worked for 24 days, 24 more boys join them. How many days will they take to complete the remaining work? a) 8 days b) 6 days c) 4 days d) 3 days

Last Answer : A 1 boy’s 1 day’s work = 1/(36*48) =1/1728 48 boy’s 24 day’s work=48*24/1728=2/3 Remaining work = 1-2/3=1/3 72 boy’s 1 day’s work =72/1728=1/24 1/24 work is done by them in 1 day. So, 1/3 work is done by them in 24/3= 8 days

Description : P and Q started a partnership business investing some amount in the ratio of 3:5. R joined them after six months with an amount equal to that of Q. In what proportion should the profit at the end of one year be distributed among P, Qand R? A.5 : 8 : 10 B.6 : 10 : 5 C.6 : 4 : 10 D.10 : 6 : 3

Last Answer : Answer – B (6 : 10 : 5) Explanation – Let the initial investments of P and Q be 3a amd 5a. P : Q : R = (3a x 12) : (5a x 12) : (5a x 6) = 36 : 60 : 30 = 6 : 10 : 5.

Description : Reshma purchased 120 chairs at price of Rs. 110 per chair. He sold 30 chairsat a profit of Rs. 12 per chair and 75 chairs at profit of Rs. 14 per chairs. The remaining chairs were sold at a loss of Rs. 7 per chairs ... the average profit per table? A. Rs 10.56 B. Rs 10.87 C. Rs 12.123 D. Rs 12.67 

Last Answer : Answer – B (Rs 10.875) Explanation – Total C.P = Rs. (120 x 110) =Rs. 13200. Total S.P = Rs.[(30 x 110 + 30 x 12) + (75 x 110 + 75 x 14) + (15 x 110 – 15 x 7) =Rs..14505 Average profit = Rs. (14505 – 13200) /120 = Rs. 1305/120= 10.875

Description : The average speed of a train is 1 3/7 times the average speed of a car. The car covers a distance of 616 km in 8 hours. How much distance will the train cover in 13 hours? a) 1340 km b) 1423 km c) 1430 km d) 1936 km e) None of these

Last Answer : speed of the car = 616/8 = 77km/hr speed of the train = 10/7 × 77 = 110 km/hr Distance covered by train = 110 × 13 = 1430 km. Answer: c)

Description : Three pipes P, Q and R can fill a tank from empty to full in 40 minutes, 15 minutes, and 30 minutes respectively. When the tank is empty, all the three pipes are opened. P, Q and R discharge chemical solutions X, Y and Z respectively. ... 5 minutes? a) 8 / 15 b) 7 / 15 c) 8 / 17 d) 6 / 13 e) 8 / 13

Last Answer : a Part of the tank filled by pipe P in 1 minute = 1 / 40 Part of the tank filled by pipe Q in 1 minute = 1 / 15 Part of the tank filled by pipe R in 1 minute = 1/ 30 Here we have to find the proportion of ... together in 5 minute = 5 1/8 = 5/ 8 Required proportion = (1/3) / ( 5/8) = 8 / 15

Description : Mr. Sachin spent 20% of his monthly income on food and 15% on children's education. 40% of the remaining he spent on entertainment and transport together and 30% on the medical. He is left with an amount of Rs.8, 775/- after ... 000/- b) Rs.46,000/- c) Rs.36, 000/- d) Rs.29,000/- e) None of these

Last Answer : Let the total income of Mr.Sachin be 100 According to question, 100 – 20 –15 = 65 × 60/100 × 70/100 = 27.3. 27.3 = 100 8775 = 100/27.3 × 8775 = Rs. 32142. Answer: e)

Description : Sanki purchased 20 dozen notebook at Rs. 48 per dozen. He sold 8 dozen at 10% profit and remaining 12 dozen with 20% profit. What is his profit percentage in the transaction? A. 8% B. 15% C. 16% D. 19% 

Last Answer : Answer – C (16%) Explanation – C.P of 20 dozen = Rs.(48 x 20) = Rs.960 C.P of 8 dozen = Rs. (48 x8) = Rs. 384. C.P of 12 dozen =Rs. (960 – 384) = Rs. 576 Total S.P = Rs. (110/100 x 384 +120/100 x 576) = Rs.1113.60 ∴ Profit % = (153.60/960 x 100)% =16%

Description : Some amount out of Rs. 10000 was lent at 6 % p.a. and the remaining at 4% p.a. If the total simple interest from both the fractions in 5 years was Rs. 1500, then the ratio of the 2 different amount is A)1:3 B)3:1 C)1:4 D)3:2

Last Answer : A)1:3

Description : In a class of 24 students, each student shakes hand with everyone els. In another class of 32 students, each student shakes hand with all other students. What is the difference between total number of hand shakes in the 2 classes? a) 180 b) 200 c) 22 d) 240 e) 260

Last Answer : 1 st class : Total Hand shakes = 24 × 23 /2 = 12 × 23 =276 2nd class :Total Hand shakes =32 × 31 / 2 = 16 × 31 = 496 Difference =220 Answer : c

Description : In a class of 24 students, each student shakes hand with everyone els. In another class of 32 students, each student shakes hand with all other students. What is the difference between total number of hand shakes in the 2 classes? a) 180 b) 200 c) 22 d) 240 e) 260

Last Answer : 1 st class : Total Hand shakes = 24 × 23 /2 = 12 × 23 =276 2nd class :Total Hand shakes =32 × 31 / 2 = 16 × 31 = 496 Difference =220 Answer : c

Description : A contract is to be completed in 46 days and 117 men were set to work, each working 8 hours a day. After 33 days, 4/7 of the work completed. How many additional men may be employed so that the work may be completed in time, each man now working 9 hours a day? a) 79 b) 80 c) 81 d) 82 e) 83

Last Answer : work finished by 33 days = 33 117 8 = 30888 man hours 4/7th of the job is finished. remaining work = 1-(4/7) = 3/7 if 4/7th of the work is 30888 hours, then 3/7th of the work = [30888 ... 9 number of men = 198 since, 117 men are already working, additional men required = 198 - 117 = 81 Answer: c)

Description : 6 men and 8 women can complete a work in 10 days. 26 men and 48 women can finish the same work in 2 days. 15 men and 20 women can do the same work in - days. a) 4 days b) 6 days c) 2 days d) 8 days e) 7 days

Last Answer : Let work done by 1 man in 1 day = m and work done by 1 woman in 1 day = b Work done by 6 men and 8 women in 1 day = 1/10 => 6m + 8b = 1/10 => 60m + 80b = 1 --- (1) Work done by 26 men and 48 ... 1 day = 15/100 + 20/200 =1/4 => Time taken by 15 men and 20 women in doing the work = 4 days Answer: a)

Description : 90 persons can complete a job in 32 days. 12 days after they started working, 60 more persons joined them. How many days will they now take to complete the remaining work? a) 10 days b) 12 days c) 14 days d) 16 days

Last Answer : B (90 * 32) persons can complete the work in 1 day. 1 person 1 day's work = 1/(90 *32) i.e., 1/2880 90 person's 12 day's work = 1/32 * 12 = 3/8 Remaining work =(1- 3/8) = 5/8 150 persons 1 ... 5/96 work is done by them in 1 day . Therefore 5/8 work is done by them, = (96/5*5/8) =12 days.

Description : Arun started a business with Rs. 40,000 and is joined afterwards by Arul with Rs.60, 000. After how many months did Arul join if the profits at the end of the year are divided equally? a) 3 b) 4 c) 5 d) 6 e) 2

Last Answer : b Suppose, Arul joined after x months.  Then, 40000 * 12 = 60000 * (12 – x) => 48 = 72 - 6x => 6x = 24 → x = 4

Description : Is it more profitable for Company M to produce Q? I. Product R sells at a price four times that of Q II. One unit of Q requires 2 units of labour, while one unit of R requires 5 ... both the statements. If the data in either statement I or statement II alone is sufficient to answer the question

Last Answer : from statement I : Let the price of product Q be P' Then the price of product R is 4P From Statement II: Cost of product Q =2 Cost of product R=5 Therefore, Profit percentage of product ... )=80P-100 Hence, product R is more profitable. Both statements are required to answer the question Answer :c

Description : Is it more profitable for Company M to produce Q? I. Product R sells at a price four times that of Q II. One unit of Q requires 2 units of labour, while one unit of R requires 5 ... both the statements. If the data in either statement I or statement II alone is sufficient to answer the question

Last Answer : from statement I : Let the price of product Q be P' Then the price of product R is 4P From Statement II: Cost of product Q =2 Cost of product R=5 Therefore, Profit percentage of product ... )=80P-100 Hence, product R is more profitable. Both statements are required to answer the question Answer :c

Description : Pranesh can do a piece of job in 60 days. He works at it for 4 days and then sarvesh alone finishes the remaining work in28 days. In how much time will pranesh and sarvesh working together, finish the work? a) 35 days b) 30 days c) 25 days d) 20 days

Last Answer : D Work done by pranesh in 4 days = 1/60 *4 =1/15 Remaining work = 1-1/15 =(15 - 1)/15 =14/15 Now 14/15 work done by sarvesh in 28 days Whole work will be done by sarvesh in(28*15 /14) = 2* 15 =30 ... 's work = 1/60 + 1/30 = (1+2) /60 = 3/60 =1/20 Hence both will finish the work in 20 days

Description : Two pipes A and B can fill a tank in 5 and 6hrs.Pipe C can empty it in 12hrs.If all the 3 pipes are opened together,then the tank will be filled in 1)1(13/17)hrs 2)2(8/11)hours. 3)3(9/17)hrs 4)4(1/2)hrs

Last Answer : 3)3(9/17)hrs Exp:Net part filled in 1hr=>(1/5+1/6-1/12)=17/60 Tank filled in=60/17=3(9/17).

Description : Two trains starting at the same time from two stations 200 km apart and going in opposite directions cross each other at a distance of 110 km from one of the stations. What is the ratio of their speeds? A.9 : 28 B.11 : 9 C.11 : 8 D.9 : 22 E.None of these

Last Answer : Answer – B (11 : 9) Explanation – In the same time, they cover 110 km and 90 km respectively.Ratio of their speeds = 110 : 90 = 11 : 9 

Description : The L.C.M. of two numbers is 48. The numbers are in the ratio 2 : 3. Then sum of the number is: A.30 B.22 C.40 D.60 E.None of these

Last Answer : Answer – C (40) Explanation – Let the numbers be 2x and 3x. Then, their L.C.M. = 6x. So, 6x = 48 or x = 8. The numbers are 16 and 24. Hence, required sum = (16 + 24) = 40.

Description : A man can do a piece of work in 10 days. With the help of a boy he can do the same piece of work in 8 days. If they get Rs. 11115 for the work then what will be the share of boys? a) Rs.2223 b) Rs.2784 c) Rs.3163 d) Rs.3312 e) None of these

Last Answer : In one day boys can do = (1/8) – (1/10) = (5-4)/10 = 1/40 part so, boys can finish the work in 40 days. Now, Men’s share : Boy’s share = 40 : 10 = 4 : 1 Boys share = (11115 / 5) × 1 = Rs. 2223 Answer is: a)

Description : Rubesh generally takes 80 minutes to reach home from office. Due to rain, he travelled at 2/3rd of his usual speed for the 1st half of the distance. At what speed should rubesh travel the remaining distance ... c) 2.5 times the original speed d) 3 times the original speed e) Cannot reach on time

Last Answer : Under the normal speed, 40 minutes for half the distance Due to rain, time taken will be 40 / (2/3) = 40 × (3/2) = 60 minutes So, in 20 minutes he has to cover the distance he usually covers in 40 minutes. So, he has to travel at twice the original speed. Answer: b)

Description : Saina spent Rs. 44,668/- on her air tickets, Rs.56,732 on buying gifts to the family members and the remaining 22% of the total amount she had as cash with her. What was the total amount ? a) Rs. 1,25,800/- b) Rs. 1,30,000/- c) Rs. 1,10,500/- d) Rs. 1,68,300/- e) Rs. 1,50,000/- 

Last Answer : Saving = 22% Spent = a00 - 22) = 78% Spending money = 44668 + 56732 = 101400 78%- 101400 100% = 101400 100/78 = 130000 Answer: b)

Description : The average age of the students in a class is 14. The average age of half of the students in that class and the class teacher is 16. The average age of the remaining half of the students is 15. What is the number of students in that class? a) 20 b) 70 c) 80 d) Cannot be determined e) None of these

Last Answer : Because total no. of students is not known we cannot find the answer. Answer: d)

Description : What is the radius of the circle/ I.Ratio of its area to circumference is >7. II.Diameter of the circle is ≤ 32. If the question can be answered with the help of statement I alone, If ... the statements. If the data in either statement I or statement II alone is sufficient to answer the question.

Last Answer : Let the radius of the circle be r units From statement 1: [πr^2]/ [ 2 πr ] > 7 or r > 14 From statement II: 2r≤32 R ≤ 16 Hence, r can be 15 or 16 units Hence, Answer : d

Description : The average of 12 numbers is 7.9. The average of 5 of them is 6.8, while the average of other five is 7.7. what is the average of the remaining 2 numbers? A) 10.25 B) 11.15 C) 12.65 D) 13.25

Last Answer : B) Sum of the remaining 2 numbers = [(12 * 7.9) – (586.8) – (5*7.7)]  = 94.8 – 34 – 38.5  = 22.3  Required average = 22.3 / 2  = 11.15

Description : A tank can be filled by a tap in 6 hours and emptied by an outlet pipe in 8 hours. How long will it take to fill the cistern if both the taps are opened together? 1. 24 hours 2. 22 hours 3. 21 hours 4. 18 hours 5. 20 hours

Last Answer : 1;

Description : Two concentric circles have radii of 23 cm and 9 cm. A rectangle has an area equal to the annular space between the above two circles. If the breadth of the rectangle is 22 cm then find its length. 1 : 32 cm 2 : 48 cm 3 : 76 cm 4 : 64 cm 5 : None of these

Last Answer : 4 : 64 cm