Maintenance checks on MCC cells

a. Ensure that the load is tripped from control room and switch is in off position.

Switch off the isolator at MCC cell.

b. Open the door and rack out the cell into isolation position.

c. Check the tightness of terminal of contactor, 3C, control transformer, control

fuses, wipe in contacts, power cables, etc.

d. Check the tightness of component mounted.

e. Look for any charred components or terminals.

f. Check the IR value of 3C, contactor, control transformer, isolator etc.

g. Check the isolator double switch feature.

h. Check the OLR and calibrate the OLR.

i. Check the pick and drop out value of contactor, 3C.

j. Check the fuses for healthiness and fuse carriers for proper contacts.

k. Clean the arc-chutes of the contactor and clean all the components of the MCC

cell properly.

l. Check the resistances of control transformer, contactor, 3C etc.

m. Check the tightness of control cable at main TB compartment. 

Maintenance on MCC panel.

a. Ensure the permit and all isolations.

b. Open the bus bar chamber and discharge the bus bar.

c. Disconnect the cables connected to bus bar and take the IR value of bus bar and

cable individually. Connect it properly and tight it to proper torque.

d. Check the tightness of nut and bolts and cables connected to buses.

e. Open the main TB compartment and check the tightness of all cables and clean it.

f. See the tightness of power terminal compartment and clean it.

g. Check that cables are supported properly.

h. Do checks on CT, PT used for indication purposes.

i. Clean the entire MCC panel properly and take the IR value.

j. Carry the checks on relays, which are used in the MCC panel.

k. See for proper earthing connection and tightness of the earthing connections.

l. See for proper house keeping. 

Related questions

Description : Complete maintenance of electrical motors should include periodic checks for machine _____________. A. vibration B. watertight integrity C. speed droop D. reactive power

Last Answer : Answer: A

Description : What are the checks on the motor during the preventive maintenance?

Last Answer : IR Value Resistance and Inductance measurement PI value (should > 1.0) 

Description : What is the safety reason to keep the contactor / MCC remote from motor?  

Last Answer : Contactor = sparking equipment. Not suiting for hazardous location.  

Description : What are the in-built protections provided in MCC cell? 

Last Answer : Fuses for short circuit protection. OLR for over load and single phasing protection. Electrical and Mechanical interlock in valve cell against short circuit. 

Description : Why 110V has been chosen in MCC cell? 

Last Answer : To isolate control circuit from power circuit for Human safety at control circuit side.  

Description : What is the safety interlock provided in MCC cell? 

Last Answer : The MCC cell door can't open if the cell is in on condition.  

Description : What is interlocks provided for the valve MCC 

Last Answer : a) Mechanical interlock, which will not allow the other contactor to close if one contactor, is closed. b) 42 auxiliary contacts are wired in the control ckt. 42-1 contact in 42-2 and 42-2 contact in 42-1. 

Description : What is the maximum load on MCC?

Last Answer : 3 Phase load upto 90 kW are fed by MCC. 

Description : Write details MCC construction. 

Last Answer : a) MCC are made up of sheet steel enclosure, indoor floor mounting and free standing, Dust and vermin proof, modular type and of double front and single front (X1, Y1). b) Degree of protection is IP 50 ... SRPH MCC are safety related and SB, TB, RAB, CWPH, DM Plant MCC's are non safety related. 

Description : What type of motor starting adopted in MCC?

Last Answer : DOL (direct on line) starter.  

Description : What are the advantages of MCC? 

Last Answer : a. Starters and contactors all will be a standard size. b. Spares inventory will be less. c. Cost of cables will be less because same size of cable is used for all capacity and gland holes can be provided before hand. d. Maintenance and trouble shooting is easier in MCC. 

Description : How Much will Solar Panel Maintenance Cost?

Last Answer : These are some good solar panel services in California Window And Solar Panel Cleaning by Vin Ruiz. SPD Solar Cleaning & Services. Aikyum Solar LA Elite Window Cleaning. LA Solar Cleaners. Solar Panel ... a range of $150 to $350. Annual inspections are typically $150 before the cost of cleaning.

Description : Nickel-cadmium storage batteries are superior to lead-acid batteries because they __________. A. put out higher voltages and require no maintenance B. can remain idle and keep a full charge for a long time C. need fewer cells in series and use less mounting space D. all of the above

Last Answer : Answer: B

Description : Nickel-cadmium batteries are superior to lead-acid batteries at high discharge rates because they _______________. A. deliver a large amount of power and can be recharged in a shorter time B. need ... less mounting space C. have higher output voltages and require no maintenance D. all of the above

Last Answer : Answer: A

Description : What is the full form of 'MCC' ? -How To ?

Last Answer : The full form of 'MCC' is Maoist Communist Centre

Description : What is the full form of MCC ?

Last Answer : The full version of MCC is Marylebone Cricket Club (London).

Last Answer : MCC - Melbourne Cricket Club

Description : MCC is investigating the improvement of the relationship between people and computers through a technology called ___________ a) computer-aided design b) human factors c) parallel processing d) all of the mentioned

Last Answer : b) human factors

Description : The new organization established to implement the Fifth Generation Project is called _____________ a) ICOT (Institute for New Generation Computer Technology) b) MITI (Ministry of International ... c) MCC (Microelectronics and Computer Technology Corporation) d) SCP (Strategic Computing Program)

Last Answer : a) ICOT (Institute for New Generation Computer Technology)

Description : MCC includes ______ types of cloud resources A. 2 B. 3 C. 4 D. 5

Last Answer : 4

Description : According to U. S. Coast Guard Regulations (46 CFR), the motor controller for a submersible electric motor driven bilge pump should be installed _____________. A. in the shaft alley B. at the submersible bilge pump C. above the uppermost continuous deck D. at the engine room emergency control panel

Last Answer : Answer: C

Description : Which of the following is/are true concerning electric power operated watertight door systems? A. Each motor driven door must use the main bus as its source of power. B. Each distribution panel for ... to permit quick activation of the system. D. Each system must have a separate branch circuit.

Last Answer : Answer: D

Description : The purpose of the automatic bus transfer shown in the illustration is to ___________. EL-0014 A. stepdown voltage to the lighting distribution panel B. provide emergency power to ... emergency switchboard from the main switchboard D. provide overcurrent protection to the lighting distribution panel

Last Answer : Answer: B

Description : According to Coast Guard Regulations (46 CFR), which of the following systems must be arranged so as to be energized by the final emergency power source? A. at least one light in the ... operated watertight door system C. each charging panel for temporary emergency batteries D. all of the above

Last Answer : Answer: D

Description : An overload in which of the listed motors will result in the illumination of an indicating light at the propulsion control station alarm panel? A. Fuel pump motor B. Steering motor C. Condensate pump motor D. Forced draft blower motor

Last Answer : Answer: B

Description : A voltmeter located on a control panel has been operating correctly for six months, suddenly burns out. After removing it, it is found that neither side of the meter has been grounded. When ... side and the ground C. installed exactly as the old installation D. grounded to the positive side

Last Answer : Answer: C

Description : A ground is indicated by the ground-detecting system on the main electrical switchboard. The FIRST step in locating the actual ground is to _____________. A. close all circuit breakers in ... ground detection system indicates normal C. change over generators D. check each circuit with a megohmmeter

Last Answer : Answer: B

Description : An AC generator panel is fitted with both synchronizing lamps and a synchroscope. When the synchroscope pointer reaches the noon position, one synchronizing light is bright and the other is dark. This ... sequence is incorrect C. the phase sequence is correct D. the generator breaker may be closed

Last Answer : Answer: B

Description : The purpose of the reverse power relay, provided on a ship's service alternator panel, is to trip the circuit in the event of ______________. A. main circuit overload B. high power transfer C. generator overspeeding D. alternator motorization

Last Answer : Answer: D

Description : A reverse-current relay will prevent AC generator motorization by ____________. A. automatically redirecting the load B. automatically speeding up the prime mover C. tripping the panel board main switch D. tripping the generator circuit breaker

Last Answer : Answer: D

Description : The purpose of the 'heater resistors' for the winch circuit shown in the illustration is to _______________. EL-0102 A. limit the current in the heater circuit B. dispel moisture in the ' ... panel C. keep the winch brake housing below the dew point D. maintain winch motor operating temperature

Last Answer : Answer: B

Description : When a battery-charging panel is being used, the batteries will discharge if _____________. A. DC voltage is supplied B. the polarity is reversed C. the voltage fluctuates D. too little current is supplied

Last Answer : Answer: B

Description : A ground in an electrical circuit outside the engine room _____________. A. cannot be detected under normal conditions B. is of no consequence to engineering personnel C. is indicated at the branch circuit breaker panel D. is indicated by the ground detecting lamps on the main switchboard

Last Answer : Answer: D

Description : The part of the shipboard electrical system used to control the distribution of power to the branch circuits, is the _____________. A. bridge control panel B. disconnect links C. governor relay box D. main switchboard

Last Answer : Answer: D

Description : Which of the listed precautions should be taken when cleaning the internals of a motor with compressed air? A. Open the machine on both ends so as to allow the air and dust to escape. B. Be certain that the ... panel. C. Be certain that the air is clean and as dry as possible. D. All of the above.

Last Answer : Answer: D

Description : Motor controllers are seldom troubled with grounds because _____________. A. the auxiliary contacts have a high resistance connection B. the contactors and relays are mounted on a nonconducting panel ... individual series-connected units D. there are separate switches for the motor and the control

Last Answer : Answer: B

Description : A tubular fuse should always be removed from a fuse panel with _____________. A. a screwdriver B. a pair of insulated metal pliers C. any insulated object D. fuse pullers

Last Answer : Answer: D

Description : What are the checks on CT & PT?

Last Answer : a) Polarity checks b) Insulation checks c) Ratio checks d) Knee point voltage (only for PS class CT)- magnetising characteristic test. 

Description : What are the tests to be carried during PM checks of IPBD?  

Last Answer : a) Physical inspection of bus for any spark or overheating or discoloration. b) Physical inspection of copper braided flexibles for discoloration. c) Physical inspection of inspection window gaskets, seal off ... Tan-delta test of IPBD m) IR value measurement n) Cleanliness checks entire IPBD. 

Description : What are the routines checks on slip rings?

Last Answer : a. Correct mV drops brush to be used. b. Brush tension adjustment. c. Air cleaning to reduce leakage current. d. Brush bedding before use. e. Field polarity change every 6 months. 

Description : Mention the initial commissioning checks on CT’s, PT’s and relays.

Last Answer : Commissioning checks on CT a) Terminal marking correctness. b) Polarity of terminals. c) Insulation resistance between primary and secondary. d) Insulation resistance between primary to earth and secondary ... h) Burden check of relay. i) Primary injection test. j) Secondary injection test. 

Description : The group of solar cells joined together in a definite pattern is called a – (1) Battery (2) Solar heater (3) Solar cooker (4) Solar cell panel

Last Answer : (4) Solar cell panel Explanation: A single solar cell can produce only a small amount of electricity. In those cases where more electrical power is needed, a large number of solar cells are joined ... a solar cell panel consists of a large number of solar cells joined together in a definite pattern.

Description : The group of solar cells joined together in a definite pattern is called a (1) Battery (2) Solar heater (3) Solar cooker (4) Solar cell panel

Last Answer : Solar cell panel

Description : When maintenance personnel are working on electrical equipment, all supply switches should be secured in the open position and tagged specifically by the _____________. A. watch engineer B. chief engineer or first assistant C. chief electrician D. person performing the repair

Last Answer : Answer: D

Description : An advantage of DC motors over AC motors is that they _____________. A. are less expensive B. require less maintenance C. offer infinite speed variation D. all of the above

Last Answer : Answer: C

Description : Which of the following statements, concerning the general maintenance of a brushless generator, is correct? A. Paint should be applied to insulating surfaces on an annual basis. B. Alcohol should be used to ... . D. Accessible generator parts should be wiped with a clean dry rag on a periodic basis.

Last Answer : Answer: D

Description : To protect the rotor of a motor disassembled for maintenance or overhaul, it should be ___________________. A. suspended by wire slings in one corner of the shop B. stowed upright on its shaft C. supported by two 'V' notched wood blocks D. returned to the frame as soon as the bearings are removed

Last Answer : Answer: C

Description : As part of a routine maintenance program for deck machinery, you should ___________. A. inspect electrical wiring and pushbutton switches for evidence of corrosion or burned insulation B. disassemble ... covers and ventilate as weather permits D. Check drum switch contact pressure every three months

Last Answer : Answer: A