a) Physical inspection of bus for any spark or overheating or discoloration.

b) Physical inspection of copper braided flexibles for discoloration.

c) Physical inspection of inspection window gaskets, seal off bushings, supporting insulators, CT’s, painting of IPBD.

d) Torque tightness of flexibles.

e) Connection tightness of CT’s, SPPT cubicle, NGT cubicle, CT’s master JB, and

Generator terminal bushing connection.

f) Tightness of supporting insulator, seal off bushing, inspection windows

g) Inspection of rubber bellows

h) Electrical checks on SPPT, NGT, CT, mVDT of copper flexible connection.

i) Capacitance measurement of surge capacitor.

j) Healthiness checks of lightning arrestor.

k) HV test of IPBD

l) Tan-delta test of IPBD

m) IR value measurement

n) Cleanliness checks entire IPBD. 

Related questions

Description : What are the tests to be carried out during DC high voltage test on power cables? 

Last Answer : DC high voltage testing. During DC high voltage testing flow of following currents will take place. a. Capacitance charging current. b. Dielectric absorption current. c. Surface leakage current. d. Partial discharge current (corona). e. Volumetric leakage current. 

Description : What are the torque settings used in IPBD connection?

Last Answer : M12 (Nut bolt) 4506 100 kg-cm or 55 NM M16 (Nut bolt) 9006 250 kg-cm or 80 NM M20 (Nut bolt) 18006300 kg-cm or 100 NM 

Description : What are the isolations required for working on IPBD/ Generator?

Last Answer : a. Generator field breaker open and tagged. b. GT breaker open and earth switch closed.  c. Barring gear motor stopped and tagged. d. Generator PT's isolated and tagged. e. CB 472 and CB 474 open ... 's are isolated and tagged. f. Before doing any work on brush gear 64F1 relay to be taken out. 

Description : What is the protection for IPBD? 

Last Answer : Generator – GT overall differential protection.  

Description : What is use of hot air blower in IPBD?

Last Answer : To remove moisture and to prevent moisture condensation inside the duct at commissioning time or in long shutdown periods. 

Description : Why seal-off bushings are used in IPBD?  

Last Answer : To prevent interchange of air at different temperature and leakage of hydrogen or infiltration of dust into the bus duct. 

Description : Why aluminium bus bars are silver-plated in IPBD?

Last Answer : Aluminium bus bars are silver-plated at flexible connection to prevent the galvanic corrosion ant also for low contact resistance. 

Description : Why neoprene rubber bellows are used in IPBD?

Last Answer : Neoprene rubber bellows are used near the terminals of the equipment and also at building wall from indoor to outdoor area to allow thermal expansion and to minimise vibrations. 

Description : What are the salient features of IPBD?  

Last Answer : a. This for a vital link between generator, GT, UAT, SPPT, SET and neutral grounding transformer. b. The continuous enclosure operating at ground potential limits the leakage flux outside the enclosure ... maintenance is nil. j. Separate parts erected IPBD. Hence changing parts makes it easy. 

Description : Why flexible expansion joints are used in IPBD?

Last Answer : To cater thermal expansion and contraction due to heating and to eliminate mechanical vibrations to the equipment. 

Description : What is type of nut and bolts are used in IPBD?  

Last Answer : Non-magnetic stainless steel nut and bolts are used in IPBD to restrict magnetic effect at joints.  

Description : Why neoprene rubber bellows in generator IPBD?

Last Answer : Prevent vibrations transmitted from generator to IPBD.  

Description : Mention the various tests carried out in a circuit breaker at HV labs.

Last Answer : Short circuit tests, Synthetic tests& direct tests.

Description : What are the checks on the motor during the preventive maintenance?

Last Answer : IR Value Resistance and Inductance measurement PI value (should > 1.0) 

Description : What Type of tests that are carried out before providing an eyelash and eyebrow treatment?

Last Answer : What is the answer ?

Description : Pick up the incorrect statement from the following for allowing workers to enter sewers A. The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 ... entering the manhole should be advised to smoke in the sewer D. Warning signals should be erected

Last Answer : ANS: C

Description : What pressure tests are carried out on valves?

Last Answer : Answer: Shell-hydrostatic, seat-hydrostatic, seat-pneumatic

Description : What pressure tests are carried out on valves?

Last Answer : Answer: Shell-hydrostatic, seat-hydrostatic, seat-pneumatic

Description : The Manufacturer of aeration devices reports the oxygen transfer rate of the device obtained through laboratory tests carried under standard conditions. Such standard condition are : (a) Wastewater at zero DO, 25°C and 760 mm ... DO, 20°C and 760 mm Hg (d) Wastewater at zero DO, 0°C and 700 mm Hg

Last Answer : (c) Tapwater at zero DO, 20°C and 760 mm Hg

Description : Complete maintenance of electrical motors should include periodic checks for machine _____________. A. vibration B. watertight integrity C. speed droop D. reactive power

Last Answer : Answer: A

Description : What are the checks on CT & PT?

Last Answer : a) Polarity checks b) Insulation checks c) Ratio checks d) Knee point voltage (only for PS class CT)- magnetising characteristic test. 

Description : What are the routines checks on slip rings?

Last Answer : a. Correct mV drops brush to be used. b. Brush tension adjustment. c. Air cleaning to reduce leakage current. d. Brush bedding before use. e. Field polarity change every 6 months. 

Description : What maintenance checks you will do for an MCC cells and MCC panel?

Last Answer : Maintenance checks on MCC cells a. Ensure that the load is tripped from control room and switch is in off position. Switch off the isolator at MCC cell. b. Open the door and rack ... See for proper earthing connection and tightness of the earthing connections. l. See for proper house keeping. 

Description : Mention the initial commissioning checks on CT’s, PT’s and relays.

Last Answer : Commissioning checks on CT a) Terminal marking correctness. b) Polarity of terminals. c) Insulation resistance between primary and secondary. d) Insulation resistance between primary to earth and secondary ... h) Burden check of relay. i) Primary injection test. j) Secondary injection test. 

Description : Which of the listed procedures should be carried out to prevent moisture damage to electrical apparatus during extended periods of idleness? A. Fill the motor housing with CO2 to inert the space. B. Strap ... C. Place heat lamps in the motor housings. D. Cover the equipment with a canvas tarpaulin.

Last Answer : Answer: C

Description : Action carried out by the relay and circuit breaker during fault condition?

Last Answer : Answer: After the relay sensing the fault condition, relay operates and close the trip coils. The effect of this will be circuit breaker operate to open the contacts.

Description : What are the tests done to minimize internal faults?

Last Answer : 1.Dissolved Gas Analysis (DGA): Faults due to arcing, high current breakdown of oil, localized sparking, partial discharge of oil, localized overheating or hot spots, etc. causes ... Over current relays with under voltage blocking 6.Zero sequence protection. 7.Negative phase sequence protection

Description : Explain about the open and short circuit tests on transformer?

Last Answer : A. Open circuit test (No load test) and short circuit test (full load test) are performed on a transformer to determine (i) Equivalent circuit of transformer (ii) Voltage ... determine copper loss in transformer at full load and parameters of approximate equivalent circuit of transformer.

Description : What are the necessary tests to determine the efficiency, voltage regulation, and temperature rise of winding & insulation of transformer?

Last Answer : 1.Direct loading test 2.Open circuit test 3. Short circuit test 4. Sumpner's or back to back test

Description : Name the tests to be conducted for predetermining the performance of 3-phase induction machine.

Last Answer : (a) No load test (b) Blocked rotor test

Description : How direct tests are conducted in circuit breakers?

Last Answer : Using a short circuit generator as the source. Using the power utility system or network as the source.

Description : State the disadvantages of field tests.

Last Answer : The circuit breaker can be tested at only a given rated voltage and network capacity. The necessity to interrupt the normal services and to test only at light load conditions. Extra inconvenience and expenses in installation of controlling and measuring equipment in the field.

Description : Mention the advantages of field tests.

Last Answer : The circuit breaker is tested under actual conditions like those that occur in the network. Special occasions like breaking of charging currents of long lines ,very short line faults ,interruption of small inductive currents etc… can be tested by direct testing only.

Description : What are the tests for battery? 

Last Answer : Conduct test – to check the capacity batteries Impedance test – to check the utilization of active materials. 

Description : What are the tests pressures used in lyra contact testing? 

Last Answer : 125 A - 3 kg 250 A - 5 kg. 

Description : What are the various tests on transformers? 

Last Answer : a) Tan delta and capacitance dissipation factor b) Tests on cooling fans c) Tests on OLTC d) Vector group test e) Short circuit test f) Open circuit test g) Insulation resistance test h) Turns ratio test i) Winding resistance test.

Description : What are the chemical tests on hydrogen and DM water?

Last Answer : Hydrogen a) Hydrogen purity in % (volume/volume). b) Relative humidity in % (30% is nominal). DM water a) PH of DM water (less than 6.5 is acidic and more than 7 is alkaline where oxygen is ... ). b) Conductivity. c) Copper traces. d) Dissolved oxygen (to trace corrosion and 1.2% is more). 

Description : In a power plant, coal is carried from storage place to boilers generally by means of (A) bucket (B) V-belts (C) trolleys (D) manually.

Last Answer : Ans: B

Description : Before any work on electrical or electronic equipment is performed, which of the following precautions should be carried out? A. De-energize the applicable switchboard bus. B. Bypass the interlocks. C. ... supply circuit breaker in the open position. D. Station a man at the circuit supply switch.

Last Answer : Answer: C

Description : Which of the following actions must be carried out prior to closing the alternator circuit breaker according to the graph shown in the illustration? EL-0002 A. Increase the alternator voltage. B. Decrease the line voltage. C. Increase the line voltage. D. Decrease the line frequency.

Last Answer : Answer: A

Description : In replacing a defective transformer with a new one, which of the following actions must be carried out to insure proper operation of the equipment it serves? A. The secondary leads must be grounded ... magnetize it. D. The iron core must be grounded for 10 minutes to remove any residual magnetism.

Last Answer : Answer: B

Description : Which of the following actions must be carried out before a voltage tester can be used to test the three line fuses to a three-phase motor? A. The fuses must be removed from the circuit. B. The ... disconnected and tagged. D. Nothing need be done as long as the motor is running under a light load.

Last Answer : Answer: B

Description : Which of the following actions can be carried out in order to prevent thermal runaway in a transistor? A. Increase the current through the collector-base junction. B. Install a heat sink. ... point to increase collector current. D. Increase the potential difference between the emitter and the base.

Last Answer : Answer: B

Description : Operation carried out in Thermal power station?

Last Answer : The water is obtained in the boiler and the coal is burnt so that steam is obtained this steam is allowed to hit the turbine; the turbine which is coupled with the generator generates the electricity

Description : What are the operation carried out in Thermal power station?

Last Answer : A: The water is obtained in the boiler and the coal is burnt so that steam is obtained this steam is allowed to hit the turbine, the turbine which is coupled with the generator generates the electricity

Description : Operation Carried Out In Thermal Power Stations?

Last Answer : The water is obtained in the boiler and the coal is burnt so that steam is obtained this steam is allowed to hit the turbine , the turbine which is coupled with the generator generates the electricity.

Description : Describe the operation carried out in Thermal power stations?

Last Answer : A:The water is boiled in the boiler with the help of coal. This generates steam. This steam is allowed to hit the turbine hence the turbine rotates. The turbine is coupled with generator. So the mechanical energy of turbine is converted to electrical energy by Generator.

Description : Discuss how the ventilation and cooling of large high speed alternator is carried out.

Last Answer : For high speed alternator two cooling methods are available and they are conventional cooling and direct cooling. In conventional cooling methods, radial and axial ventilating ducts are provided in the ... oil or hydrogen are circulated in the ducts to remove the heat directly from the conductors.

Description : Why Sumpner's test is carried out?

Last Answer : Loading a transformer is a very difficult thing to test. Say the transformer is rated at 300 MVA, now how to find a 300MVA load to test your transformer? Also the load will waste ... back to back means,primaries of two transformers connected in parallel and secondaries side connected in series.

Description : The size of a conductor used in power cables depends on the (A) operating voltage. (B) power factor. (C) current to be carried. (D) type of insulation used.

Last Answer : (C) current to be carried.