The basic nature of a project is a/an _____ one.

(A) permanent

(B) temporary

(C) (A) or (B)

(D) Both (A) and (B)

1 Answer

Answer :

(B) temporary

Related questions

Description : The basic nature of a project is a/an _____ one. (A) permanent (B) temporary (C) (A) or (B) (D) Both (A) and (B)

Last Answer : (B) temporary

Description : The amount of current assets that varies with seasonal requirements is referred to as  working capital. A. permanent B. net C. temporary D. gross

Last Answer : C. temporary

Description : The amount of current assets required to meet a firm's long-term minimum needs is  referred to as working capital. A. permanent B. temporary C. net D. gross

Last Answer : A. permanent

Description : Which of the following illustrates the use of a hedging approach to financing assets? A. Temporary current assets financed with long-term liabilities. B. Permanent working capital financed with long-term ... equity D. All assets financed with a mixture of 50% equity and 50% long-term debt

Last Answer : B. Permanent working capital financed with long-term liabilities.

Description : Assume a systems development project effort calculation determines that the system  will require 240 function points. If the developers choose to implement this system in the  C programming language, approximately ... without more information  c. exactly the same  d. much greater  e. much less

Last Answer : e. much less

Description : Which one of the following is the last step of project closings? Select one: a. The client has accepted the product. b. Archives are complete. c. The client appreciates your product. d. Lessons learned are documented. e. Temporary staff is released.

Last Answer : b. Archives are complete.

Description : . An important aim of a post-project review is to: a. validate overall progress to date against the budget and schedule. b. capture learning and document it for future usage. c. ... of all permanent documentation, signed by the sponsor. d. establish that project benefits have been identified.

Last Answer : b. capture learning and document it for future usage.

Description : An important aim of a post-project review is to:  a. validate overall progress to date against the budget and schedule.  b. capture learning and document it for future usage.  c. ... of all permanent documentation, signed by the sponsor.  d. establish that project benefits have been identified

Last Answer : b. capture learning and document it for future usage.

Description : Master Files contain data of: a) Permanent Nature b) Global Nature c) Temporary Nature d) Local Natur e) None of These

Last Answer : a) Permanent Nature

Description : What is a partial or total loss of memory of a temporary or permanent nature known as?

Last Answer : ANSWER: Amnesia 

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A) Algorithmic model (B) Expert judgment (C) Top down (D) Analogy

Last Answer : (D) Analogy

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A)Algorithmic model (B)Expert judgment (C)Top down (D)Analogy

Last Answer : (D)Analogy

Description : What is the most accurate method of obtaining project information that can reduce the amount  of risk? 1. Observations on the current project  2. Determining the risk by using brainstorming ... from previous projects that were similar in nature  4. Sensitivity analysis  5. Delphi technique.

Last Answer : 3. The use of historical data from previous projects that were similar in nature

Description : In the project planning, which of the following is considered as the most basic parameter  based on which all other estimates are made? A. project size B. project effort C. project duration D. project schedule

Last Answer : A. project size

Description : The ____ manages the four basic elements of a project: resources, time, money, and  scope

Last Answer : Ans. Project Manager

Description : The basic approach to Earned Value is to A. Sum up the Work Package Earned Values to calculate the Earned Value of the Control  Account and ultimately the Project  B. Multiply the percent complete by ... that package  C. Estimate a percent complete for each WBS Work Package  D. All of the above

Last Answer : D. All of the above

Description : The Scope Baseline is: 1. the original description of the project's end results  2. a summary description of the project's original content and end product, including basic  budgetary and time constraint data 3. the original project budget and schedule  4. a and c

Last Answer : 2. a summary description of the project's original content and end product, including basic  budgetary and time constraint data

Description : Resorce requirement in project becomes constant while the project is in its _____ progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Do it because I said to” is the mantra for project managers who use _____ as the  default approach to resolve conflict. Select one: a. collaborating b. compromising c. accommodating d. forcing e. avoiding

Last Answer : d. forcing

Description : Fill in the blank. Risk must be considered in the _____ phase and weighed against  the potential benefit of the project’s success in order to decide if the project should  be chosen. Select one: a. completion b. closeout c. execution d. planning e. initiation

Last Answer : e. initiation

Description : According to the Project Management Institute (PMI), project  management is defined as the application of knowledge, _____, _____, and  techniques to project activities to meet the project requirements . Select ... b. tools, analysis c. analysis, theories d. skills, tools e. skills, theories

Last Answer : d. skills, tools

Description : Adding people to a project team in order to speed up total development time _____.  a. is a standard task in timeboxing  b. is a useful way to meet a tight deadline  c. may actually increase total development time  d. simplifies communication within the team  e. none of the above

Last Answer : c. may actually increase total development time

Description : Michelle has decided to use a shortcut to determine the complexity of the project she  is currently managing. She has assigned the adjusted project complexity (PCA) a value  of .65. She has determined that ... _____.  a. bi-lateral  b. complex c. microconvergent  d. normal  e. very simple

Last Answer : e. very simple

Description : When using a function point estimation worksheet, there are 14 factors that impact the complexity of a project. These factors include _____.  a. data communications, time tradeoffs, and ... programming language  d. reports printed and PCA  e. x-rays, extensibility, and operational conversion

Last Answer : b. end-user efficiency, data communications, and reusability

Description : . A normal system with 400 unadjusted function points would have _____ adjusted  function points when the shortcut method is use to determine the complexity of the  project.

Last Answer : c. 400

Description : . When estimating project time schedules using industry standards, the estimated  project completion time for a systems project would be _____ person-months if the actual  planning phase were completed in 6 person-months.  a. 30  b. 40  c. 17.14  d. 9  e. 50

Last Answer : b. 40

Description : Function points are used to measure the estimated _____ of a project.  a. complexity  b. effort required  c. program size  d. time required

Last Answer : c. program size

Description : The process of assigning values for the time and effort needed to perform a system  project is called _____.  a. analysis  b. estimation  c. identifying  d. planning

Last Answer : b. estimation

Description : Project managers can develop task lists for a project with the help of _____.  a. established methodologies  b. system proposals  c. system requests  d. user application hardware  e. user requirements

Last Answer : a. established methodologies

Description : To identify the tasks for a work plan the project manager can _____.  a. control and direct the project  b. estimate the size, staff the project, and remember technical skills  c. establish a ... of the SDLC and the steps that occur in each  e. set conservative numbers for the project software

Last Answer : d. list the four phases of the SDLC and the steps that occur in each

Description : The _____ is a dynamic schedule that logs and monitors all of the tasks that need to be  accomplished for the length of the project.  a. margin of error  b. project manager  c. project objective d. timebox  e. work plan

Last Answer : e. work plan

Description : The three steps of project management are _____. a. controlling the project, directing the project, and creating the work plan  b. creating the work plan, staffing the project, and controlling ... the deliverables  e. setting the start date, estimating the time, and reading the actual time

Last Answer : b. creating the work plan, staffing the project, and controlling and directing the  project

Description : A critical success factor for project management is to _____.  a. create a work plan  b. follow the three steps of project management  c. identify most project tasks  d. manage the hundreds of tasks

Last Answer : e. start with a realistic assessment of the work

Description : The most significant challenge to project managers is _____.  a. lack of project management training  b. no one really understands how to manage a complex systems development project  ... tools that can assist in controlling project progress  d. unrealistic schedule demands by project sponsors

Last Answer : d. unrealistic schedule demands by project sponsors

Description : _____ is the process of planning and controlling the development of a system within a  specified time frame at a minimum cost with the right functionality.  a. Project management  b. Symantic timeline  c. Task identification  d. Time estimation  e. Work plan

Last Answer : a. Project management

Description : Project Management focuses on _____ goals. (A) targeted (B) long-term (C) tangible (D) intangible

Last Answer : (A) targeted

Description : The business case and the justification for the project is determined during the _____ phase. (A) initiation (B) planning (C) execution (D) closure

Last Answer : (A) initiation

Description : . If any one factor of a project changes, _____ other factor(s) is/are likely to be affected. (A) all (B) one (C) at least one (D) at most one

Last Answer : (C) at least one

Description : . The PERT in project management means program evaluation and _____ technique. (A) resource (B) reconciliation (C) reconsideration (D) review

Last Answer : (D) review

Description : Under a conservative financing policy a firm would use long-term financing to finance some of the temporary current assets. What should the firm do when a "dip" in temporary current assets causes ... C. Use the excess funds to repurchase common stock. D. Purchase additional plant and equipment.

Last Answer : B. Invest the excess long-term financing in marketable securities.

Description : Permanent working capital A. varies with seasonal needs B. includes fixed assets C. is the amount of current assets required to meet a firm's long-term minimum needs D. includes accounts

Last Answer : C. is the amount of current assets required to meet a firm's long-term minimum needs

Description : Identify the incorrect statement in connection with working capital management. A. Long-term funds are more expensive than short-term funds but also riskier B. The objectives of ... fluctuating current assets E. Aggressive financing policies increase profitability at the cost of higher risk

Last Answer : A. Long-term funds are more expensive than short-term funds but also riskier

Description : Which of the following would be consistent with an aggressive approach to financ ing  working capital? A. Financing short-term needs with short-term funds. B. Financing permanent inventory buildup with ... needs with short-term funds. D. Financing some long-term needs with short-term  funds

Last Answer : D. Financing some long-term needs with short-term  funds.

Description : The basic capital budgeting principles involved in determining relevant after-tax incremental operating cash flows require us to . A. include sunk costs, but ignore opportunity costs B. include ... C. ignore both opportunity costs and sunk costs D. include both opportunity and sunk costs

Last Answer : B. include opportunity costs, but ignore sunk costs

Description : Magnetic field can be produced by using A. permanent magnet B. electric current C. temporary magnet D. both A and B

Last Answer : permanent magnet

Description : The relief and order is issued by civil court has been categorized in  a) Temporary orders b) Final orders c) Permanent orders d) Both A & B

Last Answer : d) Both A & B

Description : Zeolite removes both temporary as well as permanent hardness of water by precipitating calcium and magnesium present in water as insoluble zeolites. Used zeolite is regenerated by flushing with the solution of (A) Calcium sulphate (B) Sodium chloride (C) Sodium sulphate (D) Magnesium chloride

Last Answer : (B) Sodium chloride

Description : Which of the following processes can remove both temporary as well as permanent hardness of water? (A) Filtration (B) Boiling (C) Distillation (D) None of these

Last Answer : (C) Distillation

Description : Closing entries are necessary for a. permanent accounts only. b. temporary accounts only. c. both permanent and temporary accounts. d. permanent or real accounts only.