Resorce requirement in project becomes constant while the project is in its _____

progress stage.

(A) 40 to 55%

(B) 55 to 70%

(C) 70 to 80%

(D) 80 to 95%

1 Answer

Answer :

(D) 80 to 95%

Related questions

Description : Resorce requirement in project becomes constant while the  project is in its progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Resource requirement in project becomes constant while the project is in its progress stage. A. 40 to 55% B. 55 to 70% C. 70 to 80% D. 80 to 95%

Last Answer : D. 80 to 95%

Description : Living cell contains 60 – 95% water. Water present in human body is (a) 60 – 65% (b) 50 – 55% (c) 75 – 80% (d) 65 – 70%.

Last Answer : (d) 65 – 70%.

Description : Constantan is an alloy of (A) Cu (55%) & Sn (45%) (B) Cu (55%) & Ni (45%) (C) Pt (95%) & Rh (10%) (D) Fe (80%) & Ni (20%)

Last Answer : (B) Cu (55%) & Ni (45%)

Description : Seed germination percentage of rough lemon is: a. 50-60% b. 60-70% c. 70-80% d. 80-90%

Last Answer : 60-70%

Description : The sum of the percentage of tricalcium silicate and dicalcium silicate for Portland cement varies from. (a) 50 to 60% (b) 60 to 70% (c) 70 to 80% (d) 80 to 90%

Last Answer : (c) 70 to 80%

Description : How much of world's surface is covered by water? (1) 55% (2) 70% (3) 80% (4) 25%

Last Answer : (2) 70% Explanation: Water makes up 70.8% of the Earth's surface, while the other 29% consists of continents and Islands. To break the numbers down, 96.5% of all the Earth's water is ... while the remaining 3.5% is freshwater lakes and frozen water locked up in glaciers and the polar ice caps.

Description : How much of world’s surface is covered by water? (1) 55% (2) 70% (3) 80% (4) 25%

Last Answer : 70%

Description : Rectified spirit contains alcohol about ? A. 80% B. 95% (Answer) C. 70% D. 85%

Last Answer : B. 95% (Answer)

Description : At 28 days of curing concrete attains a strength of [ A ] 20 to 25% [ B ] 60 to 70% [ C ] 65 to 80% [ D ] 90 to 95%

Last Answer : [ D ] 90 to 95%

Description : Controlling the changes in the project may affect (A)The progress of the project (B)Stage cost (C)Project scope (D)All of the abov

Last Answer : (D)All of the abov

Description : The most significant challenge to project managers is _____.  a. lack of project management training  b. no one really understands how to manage a complex systems development project  ... tools that can assist in controlling project progress  d. unrealistic schedule demands by project sponsors

Last Answer : d. unrealistic schedule demands by project sponsors

Description : For design of sewers, percentage of sewage discharge is assumed A. 65 to 70% B. 70 to 75% C. 75 to 80% D. 85%

Last Answer : ANS: C

Description : RBI sold its stake in NABARD to the Government of India, which now holds _____ stake A. 65% B. 70% C. 95% D. 99% E. None of the Above

Last Answer : D. 99% Explanation: RBI sold its stake in NABARD to the Government of India, which now holds 99% stake.

Description : In which stage of COPD is the forced expiratory volume (FEV1) < 30%? a) III Stage III patients demonstrate FEV1 < 30% with respiratory failure or clinical signs of right heart failure b) II Stage II ... I Stage I is mild COPD with FEV1 < 70%. d) O Stage O is characterized by normal spirometry

Last Answer : a) III Stage III patients demonstrate FEV1 < 30% with respiratory failure or clinical signs of right heart failure

Description : Approximately what percentage of the project manager's time is spent in some form of  communication, such as: conferences, meetings, writing memos, reading and preparing reports, and talking with project  team members, upper ... other stalk holders? 1. 10-20%  2. 50-70%  3. 75-90%  4. 21-45%

Last Answer : 3. 75-90%

Description : Madhan was 3 times as old as his daughter 10 years ago. After 10 years, Madhan will be twice as old as his daughter. Find out the present age of Madhan. a) 68 years b) 70 years c) 40 years d) 55 years e) 80 years

Last Answer : b Let age of the daughter before 10 years = x Then, age of Madhan before 10 years = 3x After 10 years, Madhan will be twice as old as his daughter. ⇒ 3x + 20 = 2( x+20) ⇒ x = 20 ⇒ Present age of Madhan = 3x + 10 = 3× 20+ 10 = 70 years.

Description : Q.61. CA Co manufactures a single product and has drawn up the following flexed budget for the year.  60% 70% 80%  Rs Rs Rs Direct materials 120,000 140,000 160,000 Direct labour 90,000 105,000 120,000 Production ... activity? (a) Rs 330,300 (b) Rs 370,300 (c) Rs 373,300 (d) Rs 377,300

Last Answer : (b) Rs 370,300

Description : . When estimating project time schedules using industry standards, the estimated  project completion time for a systems project would be _____ person-months if the actual  planning phase were completed in 6 person-months.  a. 30  b. 40  c. 17.14  d. 9  e. 50

Last Answer : b. 40

Description : . An important aim of a post-project review is to: a. validate overall progress to date against the budget and schedule. b. capture learning and document it for future usage. c. ... of all permanent documentation, signed by the sponsor. d. establish that project benefits have been identified.

Last Answer : b. capture learning and document it for future usage.

Description : Which one of the following statements best defines an estimate? a. An approximation of project time and cost targets, refined throughout the project life cycle. b. A prediction of a future ... . A situation that affects or influences the outcome of the project expressed in time or cost terms

Last Answer : a. An approximation of project time and cost targets, refined throughout the project life cycle.

Description : Alice is a Project Manager. She is coordinating a bidder conference to allow vendors to get clarification on the work that needs to be performed. Which phase of Project Management is in progress. A. Conduct Procurements B. Plan Procurements C. Control Procurements D. Close Procurements

Last Answer : A. Conduct Procurements

Description : Which of the following is true about management meetings? Select one: a. They are short meetings to develop a common understanding of what the short-term  priorities are for the project. ... , tracking progress of existing plans, and  making adjustments to plans in response to new information.

Last Answer : e. They are oriented toward developing plans, tracking progress of existing plans, and  making adjustments to plans in response to new information.

Description : Complete the following statement. As a project manager, Darrell is  excited that he is assigned to be in charge of the most important project  this year. After being chartered for the project, he ... c. prepare for the template to monitor project progress. d. estimate the entire project budget.

Last Answer : b. start to define and develop the stakeholder needs and requirements

Description : You are working in CareerRide as a project manager. What will you do to minimize the risk of failure? a. Request a large budget b. You will increase the team size c. Track progress d. None of the above

Last Answer : c. Track progress

Description : What is the definition of Earned Value Management? A. An approach that combines the scope, schedule, and cost baseline into a project  performance and progress measurement tool.  B. ... approach that combines the scope and cost baseline into a project performance and  progress measurement tool.

Last Answer : A. An approach that combines the scope, schedule, and cost baseline into a project  performance and progress measurement tool.

Description : Earned value management integrates scope, cost, and schedule measures to:  A. assess project performance and progress.  B. develop a preliminary budget. C. assess communication effectiveness among project team members. D. assess whether all requirements were met.

Last Answer : A. assess project performance and progress.

Description : Alice is a Project Manager. She is coordinating a bidder conference to allow vendors to get  clarification on the work that needs to be performed. Which phase of Project Management is in  progress. A. Conduct Procurements B. Plan Procurements C. Control Procurements D. Close Procurements

Last Answer : A. Conduct Procurements

Description : An important aim of a post-project review is to:  a. validate overall progress to date against the budget and schedule.  b. capture learning and document it for future usage.  c. ... of all permanent documentation, signed by the sponsor.  d. establish that project benefits have been identified

Last Answer : b. capture learning and document it for future usage.

Description : Which one of the following statements best defines an estimate?  a. An approximation of project time and cost targets, refined throughout the project life  cycle.  b. A prediction of a future ... . A situation that affects or influences the outcome of the project expressed in time or cost terms.

Last Answer : a. An approximation of project time and cost targets, refined throughout the project life  cycle.

Description : )The critical element in a project's communication system is the: 1. Progress report * 2. Project directive  3. Project manager  4. Customer

Last Answer : 3. Project manager

Description : For good pollination in papaya orchard it is necessary that male plants should be a. 5-10% b. 40-45% c. 50-55% d. 70-75%

Last Answer : 5-10%

Description : Community water fluoridation MOST effectively achieves: a. 90. 95% reduction of caries. b. 45. 55% reduction of caries. Esta se corrects si no tuviera la ultima opcion c. Reduces pit and fissures caries more than smooth surfaces. d. Reduces smooth surfaces more than pit and fissures.

Last Answer : d. Reduces smooth surfaces more than pit and fissures.

Description : Community water fluoridation MOST effectively achieves is:** A. 90-95% reduction of caries B. 45-55% reduction of caries C. Reduces pit and fissures caries more than smooth surfaces D. Reduces smooth surfaces more than pit and fissures

Last Answer : D. Reduces smooth surfaces more than pit and fissures

Description : .Fluoridation is the adjustment of the fluoride content of a community water supply to optimum levels for caries prevention. Which of the following statement is correct? A. Tooth decay ... in smooth surface caries from in pit and fissures D. Fluoridation increases vulnerability to osteoporosis

Last Answer : C. Greater reduction in smooth surface caries from in pit and fissures

Description : 95% (by volume) of LPG at 760 mm Hg pressure will evaporate at__________ °C. (A) 2 (B) -40 (C) 30 (D) 55

Last Answer : (A) 2

Description : Which of the following activity is undertaken immediately after feasibility study and before  the requirement analysis and specification phase? A. Project Planning B. Project Monitoring C. Project Control D. Project Scheduling

Last Answer : A. Project Planning

Description : Carbide tipped cutting tools are manufactured by powder metallurgy techniques and have a composition of (A) 90% tungsten carbide and 10% cobalt (B) 70% aluminium oxide & 30% silica (C) 30% nickel, 15% chromium & 55% tungsten (D) 65% tungsten & 35% zirconium

Last Answer : Option A

Description : A 40 kW engine has a mechanical efficiency of 80 %. If the frictional power is assumed to be constant with load, what is the approximate value of the mechanical efficiency at 50 % of the rated load? (a) 45% (b) 55 % (c) 65% (d) 75%

Last Answer : Ans :c

Description : Which of the following statements regarding cash flow patterns (for time periods 0, 1, 2, 3, and 4) is correct? A. The sequence of -Rs.100, Rs.50, Rs.40, Rs.60, and Rs.50 is a non-conventional cash ... -Rs.50, Rs.50, Rs.70, Rs.60, and -Rs.150 potentially has at most two internal rates of return.

Last Answer : B. The sequence of -Rs.100, Rs.600, -Rs.1,100, Rs.600, and Rs.20 potentially has a maximum of two internal rates of return.

Description : The hurricane model implies that project estimates become more accurate as the  project's product becomes better understood.

Last Answer : Ans: True

Description : “Risk” is usually _______ as the project progresses. (A) increases (B) reduces (C) remains same (D) becomes negligible

Last Answer : (B) reduces

Description : The average humidity percentage recommended for interior plants is: a. 70 to 100% b. 40 to 70% c. 20 to 30% d. 10 to 20%86.

Last Answer : 40 to 70%

Description : Out of the total enzymes present in a cell, a mitochondrion alone has (A) 4% (B) 70% (C) 95% (D) 50%

Last Answer : Answer : B

Description : The maximum concentration of ethanol that is achieved by successive distillation of fermentation broth in continuous stills is A- .60% B- 95% C- .70% D- 99%

Last Answer : 95%

Description :  A project with total budget cost of 30 crores is scheduled to be completed in 80 weeks. A periodic review was carried out at end of 60 weeks and results are as given:  Budgeted cost of work performed (EV) = 17 ... crores What is the cost performance index?  A.0.895  B.0.81  C.0.90  D.1.12

Last Answer : A.0.895