Which model is used to compute the effort required to 

integrate reusable components or program code that is 

automatically generated by design or program translation 

tools?

a) An application-composition model

b) A post-architecture model

c) A reuse model

d) An early design model

1 Answer

Answer :

c) A reuse model

Related questions

Description : Which model assumes that systems are created fromreusable  components, scripting or database programming? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : a) An application-composition model

Description : Which model is used during early stages of the system  design afterthe requirements have been established? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : d) An early design model

Description : The COCOMO model takes into account different approaches to development, reuse, etc. a) True b) False

Last Answer : b) False

Description : Function points are used to measure the estimated _____ of a project.  a. complexity  b. effort required  c. program size  d. time required

Last Answer : c. program size

Description : Upper CASE tools are used to create diagrams and generate code for database tables  system functionality during the design phase.

Last Answer : Ans: False

Description : Problems with using Lines of Code to measure the size of a product include(s) a) The creation of source code is only part of the development effort b) The Lines of Code (LOC) will differ between ... The final size (kLOC) can only be determined once the product is delivered e) All of the above.

Last Answer : e) All of the above.

Description : Assume a systems development project effort calculation determines that the system  will require 240 function points. If the developers choose to implement this system in the  C programming language, approximately ... without more information  c. exactly the same  d. much greater  e. much less

Last Answer : e. much less

Description : The software ................. of a program or a computing system is the structure or structures of the system, which comprise software components, the externally visible properties of those components, and the relationships among them. (A) Design (B) Architecture (C) Process (D) Requirement

Last Answer : (B) Architecture

Description : Point out the correct statement. a) Service Oriented Architecture (SOA) describes a standard method for requesting services from distributed components and managing the results b) SOA provides the ... written in different languages and can use multiple messaging protocols d) All of the mentioned

Last Answer : All of the mentioned

Description : Point out the correct statement. a) Service Oriented Architecture (SOA) describes a standard method for requesting services from distributed components and managing the results b) SOA provides the ... written in different languages and can use multiple messaging protocols d) All of the mentioned

Last Answer : All of the mentioned

Description : Lower CASE tools are used to create integrated diagrams of the system and store  information about system components during the analysis phase.

Last Answer : Ans: False

Description : Which of the following items should not be included in the  project management plan? a) The techniques and case tools to be used b) Detailed schedules, budgets and resource ... development  organisation, project responsibilities, managerial  objectives and priorities e) None of the above.

Last Answer : c) The life cycle model to be used

Description : According to the Project Management Institute (PMI), project  management is defined as the application of knowledge, _____, _____, and  techniques to project activities to meet the project requirements . Select ... b. tools, analysis c. analysis, theories d. skills, tools e. skills, theories

Last Answer : d. skills, tools

Description : Mark the incorrect option: (A) The special registration envelopes provided by the Post Office cannot be used for the transmission of unregistered article (B) Reuse of a stamp that has already ... have been cut and separated from embossed envelopes or postcards can be used in payment of postage

Last Answer : (D) Postage stamps which have been cut and separated from embossed envelopes or postcards can be used in payment of postage

Description : Traditional Work Breakdown Structures tend to  a. focus on the design of the system as oppose to the needs of the current phase and  iteration  b. force too many levels of detail early on for large ... project and difficult to compare across projects  d. all of the above  e. none of the above

Last Answer : d. all of the above

Description : Identify which technique will not help a company to optimise its working capital cycle. A. Offering discounts for early payment by debtors B. Using cash management models to optimise the level of ... order quantity model to stock management E. Adopting the use of just-in-time stock management

Last Answer : B. Using cash management models to optimise the level of cash held

Description : Which of the following is the process of assembling program  components, data, and libraries, and then compiling and linking these to  create an executable system? a) System building b) Release management c) Change management d) Version management

Last Answer : a) System building

Description : What are the composition for agents in artificial intelligence? a) Program b) Architecture c) Both Program & Architecture d) None of the mentioned

Last Answer : c) Both Program & Architecture

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : Arrange the following steps to form a basic Engineering  Process Model. i. Test ii. Design iii. Install iv. Specification v. Manufacture vi. Maintain a) 2, 4, 5, 1, 6, 3 b) 4, 2, 5, 1, 3, 6 c) 2, 4, 5, 1, 3, 6 d) 4, 2, 5, 1, 6, 3

Last Answer : a) 2, 4, 5, 1, 6, 3

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : Which one of the following statements best defines procurement? a. A technique to establish the best approach for obtaining the resources for the project. b. A group of interrelated resources and ... product. d. The process by which products and services required for the project are acquired.

Last Answer : d. The process by which products and services required for the project are acquired.

Description : Which one of the following statements best defines procurement?  a. A technique to establish the best approach for obtaining the resources for the project.  b. A group of interrelated resources and ... product.  d. The process by which products and services required for the project are acquired.

Last Answer : d. The process by which products and services required for the project are acquired.

Description : Which of the following is/are main parameters that you should use when computing the costs of a software development project? a) travel and training costs b) hardware and software costs c) effort costs (the costs of paying software engineers and managers) d) all of the mentioned

Last Answer : d) all of the mentioned

Description : During project estimation, project manager estimates following A. project cost B. project duration C. project effort D. all of the above

Last Answer : D. all of the above

Description : In the project planning, which of the following is considered as the most basic parameter  based on which all other estimates are made? A. project size B. project effort C. project duration D. project schedule

Last Answer : A. project size

Description : Which of the following is/are main parameters that you should use when computing the costs of a  software development project? a) travel and training costs b) hardware and software costs c) effort costs (the costs of paying software engineers and managers) d) all of the mentioned

Last Answer : d) all of the mentioned

Description : Complete the following statement. In a weak matrix environment, the  project manager, Eric, has to constantly make an effort to influence his  project team and stakeholders to ensure project success. ... managers. d. there are no functional managers. e. Eric has flexibility on authority.

Last Answer : b. Eric has no or little authority.

Description : Project management is a rationally planned and organised effort to achieve a specific  goal. (True/False)

Last Answer : Ans. True

Description : Which of the following are parameters involved in  computing the total cost of a development project? a) Hardware and costs b) Effort costs c) Travel and training costs d) All of the mentioned

Last Answer : d) All of the mentioned

Description : computing the costs of a development project? (A)travel and training costs (B) hardware and costs (C) effort costs (the costs of paying engineers and managers) (D)All of the mention

Last Answer : (D)All of the mention

Description : Which is the Estimation size should be known? a. Time estimation b. Effort estimation c. Cost estimation d. size estimation

Last Answer : b. Effort estimation

Description : Scope creep is only a minor factor in projects running over schedule, and every effort  should be made to incorporate any changes into the present system if they would truly be  beneficial.

Last Answer : Ans: False

Description : When using a function point estimation worksheet, there are 14 factors that impact the complexity of a project. These factors include _____.  a. data communications, time tradeoffs, and ... programming language  d. reports printed and PCA  e. x-rays, extensibility, and operational conversion

Last Answer : b. end-user efficiency, data communications, and reusability

Description : The process of assigning values for the time and effort needed to perform a system  project is called _____.  a. analysis  b. estimation  c. identifying  d. planning

Last Answer : b. estimation

Description : A Communications Management Plan does the following:  A. Coordinates an effort to communicate in meetings effectively B. Lays out a plan on how to communicate with your Project ... and  efficiently. D. Coordinates the communication between project leaders and uninterested project  members

Last Answer : C. Lays out the approach and method for delivering information effectively and  efficiently.

Description : How does a project differ from an ongoing work effort?  A. It is unique B. It involves more than one person C. It has a project manager D. It is not a repetitive process that follows an organization’s existing procedures  (Ans.)

Last Answer : D. It is not a repetitive process that follows an organization’s existing procedures  (Ans.)

Description : To assist in budget control, it is suggested that the estimate occur at the _____ ____ ______  level of the WBS 1. Highest  2. Lowest  3. Major work effort  4. Third

Last Answer : 2. Lowest

Description : What Is Effort Variance?

Last Answer : Effort Variance = (Actual effort – Estimated Effort) / Estimated Effort.

Description : Which is a configuration management concept that helps us to  control change without seriously impeding justifiable change? a) Baselines b) Source code c) Data model d) None of the mentioned

Last Answer : a) Baselines

Description :  The COCOMO model to convert lines of code estimates into person-month estimates  was designed by Allen Albrecht of IBM.

Last Answer : Ans: False

Description : What are all the modular architecture for OpenStack are: a) OpenStack Compute: For overseeing extensive systems of the virtual machine. b) OpenStack Object Storage: The storage framework that offers help for both object storage ... to virtual disk pictures. d) A & B e) B & C f) All of the above

Last Answer : All of the above

Description : What are all the modular architecture for OpenStack are: a) OpenStack Compute: For overseeing extensive systems of the virtual machine. b) OpenStack Object Storage: The storage framework that offers help for both object storage ... to virtual disk pictures. d) A & B e) B & C f) All of the above

Last Answer : All of the above

Description : Point out the wrong statement. CSE-R17.BLOGSPOT.COM a) SOA provides the standards that transport the messages and makes the infrastructure to support it possible b) SOA provides access ... and widely shareable components that can minimize developer and infrastructure costs d) None of the mentioned

Last Answer : SOA provides access to reusable Web services over an SMTP network

Description : Point out the wrong statement. a) SOA provides the standards that transport the messages and makes the infrastructure to support it possible b) SOA provides access to reusable Web services ... widely shareable components that can minimize developer and infrastructure costs d) None of the mentioned

Last Answer : SOA provides access to reusable Web services over an SMTP network

Description : A(n) ____________ is a measure of program size based on the number and  complexity of inputs, outputs, queries, files, and program interfaces.  a. function point  b. line of code  c. project plan  d. standard module  e. workplan

Last Answer : a. function point

Description : A planning phase for an engineering component generated 80 engineering drawings. The QA team randomly selected 8 drawings for inspection. This exercise can BEST be described as example of: A. Inspection B. Statistical Sampling C. Flowcharting D. Control Charting

Last Answer : B. Statistical Sampling

Description : In the ____ stage, of project identification the project ideas generated above are  screened and a preliminary exercise is conducted to weed out the bad or unviable ideas.

Last Answer : Ans. Screening

Description : .A planning phase for an engineering component generated 80 engineering drawings. The QA  team randomly selected 8 drawings for inspection. This exercise can BEST be described as  example of: A. Inspection B. Statistical Sampling C. Flowcharting D. Control Charting

Last Answer : B. Statistical Sampling

Description : As a PMP, you will be required to comply with the PMP Code of Professional  Conduct. This code refers to all of the following except which one?  A. Reporting conflicts of interest ... C. Complying with the stakeholder requirements D. Complying with the rules and standards of foreign countries