What is a cash flow table in project management? 

A. A table portraying inflow of cash in a project 

B. A table portraying outgoing expenses of a project 

C. It is the tool that is used to study such cash flows by breaking inflows and 

outflows down, usually on a monthly basis 

D. A table portraying debts taken for a project

1 Answer

Answer :

C. It is the tool that is used to study such cash flows by breaking inflows and 

outflows down, usually on a monthly basis

Related questions

Description : The cash inflows and (outflows) associated with a project are as follows: At start  (120000) , Year1-40000, Year2-50000, Year3-60000, Residual Value(at the end of 3rd  year)-20000. The payback period for this project ... 2 years and 3 months.  B 2 years and 6 months.  C 3 years.  D 2 years.

Last Answer : B 2 years and 6 months.

Description : The payback period is the period  A. a project takes to pay back the loan taken to purchase the capital assets  B. equal to the useful life of the machines  C. a project takes to recover its initial cash outflow  D. over which the project will be getting operating cash inflows

Last Answer : C. a project takes to recover its initial cash outflow

Description : Which of the following is least likely to be part of the calculation of the terminal- year incremental net cash flow for an energy-related expansion project? A. An initial working capital ... Disposal/reclamation costs C. Capitalized expenditures D. Salvage value of any sold or disposed assets

Last Answer : D. Salvage value of any sold or disposed assets

Description : Cash inflows from a project include: A. tax shield of depreciation B. after tax operating profits C. raising of funds D. Both (a) and (b)

Last Answer : D. Both (a) and (b)

Description : A project has the following cash inflows Rs.34,444; Rs.39,877; Rs.25,000; and Rs.52,800 for years 1 through 4, respectively. The initial cash outflow is Rs.104,000. Which of the following four statements ... than or equal to 14%, but less than 18%. D. The IRR is greater than or equal to 18%.

Last Answer : C. The IRR is greater than or equal to 14%, but less than 18%.

Description : _____________ may be defined as the excess of present value of project cash inflows over that of out flows. A. Net present value technique. B. Average rate of return. C. Benefit-Cost ratio. D. Internal rate of return

Last Answer : A. Net present value technique.

Description : Net Present Value of a machine is  A. PV of cash inflows less cost of investment  B. PV of cash inflows ÷ cost of investment  C. PV of net profit after tax less cost of investment  D.PV of cash inflows less average cost of investment

Last Answer : A. PV of cash inflows less cost of investment

Description : Which of the following project baselines provides the basis for measurement of  the expected cash flow against requirements over time and is often displayed as an  S curve? Select one: a. Schedule baseline b. Cost performance baseline c. Scope baseline d. Plan baseline e. Initiation baseline

Last Answer : b. Cost performance baseline

Description : Which of the following does not affect cash flows from a proposal: A. Salvage value B. Depreciation amount C. Tax rate change D. Method of project financing

Last Answer : D. Method of project financing

Description : To the nearest rupee, what is the net present value of a replacement project whose cash flows are -Rs.104,000; Rs.34,444; Rs.39,877; Rs.25,000; and Rs.52,800 for years 0 through 4, respectively? The firm has decided to ... -free rate is 6%. A. Rs.15,115 B. Rs.26,798 C. Rs.33,346 D. Rs.48,121

Last Answer : C. Rs.33,346

Description : Which of the following statements is incorrect regarding a normal project? A. If the NPV of a project is greater than 0, then its PI will exceed 1. B. If the IRR of a project is 8%, its NPV, using ... the IRR of a project is greater than the discount rate, k, then its PI will be greater than 1.

Last Answer : D. If the IRR of a project is greater than the discount rate, k, then its PI will be greater than 1.

Description : All of the following influence capital budgeting cash flows except . A. choice of depreciation method for tax purposes B. economic length of the project C. projected sales (revenues) for the project

Last Answer : B. economic length of the project

Description : The estimated benefits from a capital budgeting project are expected as cash flows rather than income flows because . A. it is more difficult to calculate income flows than cash flows B. it ... is central to the firm's capital budgeting decision C. this is required by the accounting profession

Last Answer : B. it is cash, not accounting income, that is central to the firm's capital budgeting decision

Description : Which of the following will improve a company's working capital management position? A. An increased level of bad debts B. An increase in the credit period allowed by suppliers C. An increased debtor ... D. An increase in the stock turnover period E. An increase in the length of the production

Last Answer : B. An increase in the credit period allowed by suppliers

Description : Which one of the following statements best describes the use of an issue log? a. A summary of all possible alternative resolutions of an issue. b. A summary of all the project issues, their ... for capturing all issues. d. A tool to ensure that the issue management process is adhered to.

Last Answer : b. A summary of all the project issues, their analysis and status.

Description : What is the definition of Earned Value Management? A. An approach that combines the scope, schedule, and cost baseline into a project  performance and progress measurement tool.  B. ... approach that combines the scope and cost baseline into a project performance and  progress measurement tool.

Last Answer : A. An approach that combines the scope, schedule, and cost baseline into a project  performance and progress measurement tool.

Description : Which one of the following statements best describes the use of an issue log?  a. A summary of all possible alternative resolutions of an issue.  b. A summary of all the project issues, their ... for capturing all issues.  d. A tool to ensure that the issue management process is adhered to.

Last Answer : b. A summary of all the project issues, their analysis and status.

Description : What Are The Functions Of Project Management Tool?

Last Answer : Following are some functions of Project Management tool:  Task management.  File storage.  Reporting functions.  Commenting and message boards.  Client access.  Subcontractor task assignment.  Time tracking.

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A) Algorithmic model (B) Expert judgment (C) Top down (D) Analogy

Last Answer : (D) Analogy

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A)Algorithmic model (B)Expert judgment (C)Top down (D)Analogy

Last Answer : (D)Analogy

Description : The project scope statement furnishes the basis for: 1. Provides links to the clients functional management groups  2. Allowing the project to move to the next phase . A way to provide updated information to the accounting department

Last Answer : 1. Provides links to the clients functional management groups

Description : Which of the following statements is correct regarding the internal rate of return (IRR) method? A. Each project has a unique internal rate of return. B. As long as you are not dealing with ... of return is rarely used by firms today because of the ease at which net present value is calculated

Last Answer : D. The internal rate of return is rarely used by firms today because of the ease at which net present value is calculated.

Description : Which of the following statements is correct regarding the internal rate of return (IRR) method? A. Each project has a unique internal rate of return. B. As long as you are not dealing with ... of return is rarely used by firms today because of the ease at which net present value is calculated.

Last Answer : D. The internal rate of return is rarely used by firms today because of the ease at which net present value is calculated.

Description : Which of the following statements is correct regarding the internal rate of return (IRR) method? A. Each project has a unique internal rate of return B. As long as you are not dealing with ... of return is rarely used by firms today because of the ease at which net present value is calculated

Last Answer : D. The internal rate of return is rarely used by firms today because of the ease at which net present value is calculated.

Description : Which of the following is not followed in capital budgeting? A. Cash flows principle B. Interest exclusion principle C. Accrual principle D. Post tax principle

Last Answer : C. Accrual principle

Description : Capital budgeting decisions are based on: A. Incremental profit B. Incremental cash flows C. Incremental assets D. Incremental capital

Last Answer : B. Incremental cash flows

Description :  A sound capital budgeting technique is based on: A. Cash Flows B. Accounting Profit C. Interest rate on borrowings D. Last dividend paid

Last Answer : A. Cash Flows

Description : Which of the following is not used in capital budgeting? A. B. C. D. Time Value of Money Sensitivity Analysis Net Assets Value Method Cash Flows

Last Answer : Net Assets Value Method

Description : The basic capital budgeting principles involved in determining relevant after-tax incremental operating cash flows require us to . A. include sunk costs, but ignore opportunity costs B. include ... C. ignore both opportunity costs and sunk costs D. include both opportunity and sunk costs

Last Answer : B. include opportunity costs, but ignore sunk costs

Description : In proper capital budgeting analysis we evaluate incremental cash flows. A. accounting B. operating C. before-tax D. financing

Last Answer : B. operating

Description : ___ is a financial term to describe a business or project where the sales revenue is equal  to total expenses.

Last Answer : Ans. Break-even

Description : Which of the following is true about management meetings? Select one: a. They are short meetings to develop a common understanding of what the short-term  priorities are for the project. ... , tracking progress of existing plans, and  making adjustments to plans in response to new information.

Last Answer : e. They are oriented toward developing plans, tracking progress of existing plans, and  making adjustments to plans in response to new information.

Description : The most successful project manager usually: 1. works their way up from assistants in the project office to full-fledged project managers,  supplementing that experience with formal ... . Has considerable experience as a functional manager before moving into the project  management arena.

Last Answer : 1. works their way up from assistants in the project office to full-fledged project managers,  supplementing that experience

Description : Which of the following is an important action that must be taken by top management when  implementing project management in an organization? 1. Completely selling the project management concept to the entire ... Choice of the type of project organization to be utilized.  4. All of the above.

Last Answer : 4. All of the above.

Description : study focuses on answering the essential questions such as; should we proceed with the proposed project idea? What are the benefits and drawbacks of the proposed project  idea?

Last Answer : Ans. Pre-feasibility

Description : Project Integration Management ensures that various elements of a project are properly  integrated and coordinated for smooth flow of information and resources. (True/False)

Last Answer : Ans. True

Description : Approximately what percentage of the project manager's time is spent in some form of  communication, such as: conferences, meetings, writing memos, reading and preparing reports, and talking with project  team members, upper ... other stalk holders? 1. 10-20%  2. 50-70%  3. 75-90%  4. 21-45%

Last Answer : 3. 75-90%

Description : Cash flows include a) Cash payments only b) Cash receipts only c) Cash receipts and payments d) Cash and noncash incomes and expenses.

Last Answer : c) Cash receipts and payments

Description : Decrease in a creditor is a---------------- of cash a) Inflow b) No flow of cash c) Outflow d) None of these

Last Answer : c) Outflow

Description : Andrew has joined as the Project Manager of a project. One of the project documents available to Andrew lists down all the risks in a hierarchical fashion. What is this document called? a. Risk Management Plan. b. List of risks. c. Monte Carlo diagram. d. Risk Breakdown Structure.

Last Answer : d. Risk Breakdown Structure.

Description : Andrew has joined as the Project Manager of a project. One of the project documents  available to Andrew lists down all the risks in a hierarchical fashion. What is this document  called? a. Risk Management Plan. b. List of risks. c. Monte Carlo diagram. d. Risk Breakdown Structure.

Last Answer : d. Risk Breakdown Structure.

Description : All of the following are true regarding the Qualitative Risk Analysis process except  which one?  A. Probability and impact and expert interview are used to help correct biases that occur  in the data ... of this process used to determine  which risks need near-term response plans.

Last Answer : C. Qualitative Risk Analysis is an easy method of determining risk probability and  impact that usually takes a good deal of time to perform.

Description : WBS is produced by identifying the key elements, breaking each element down into  component parts and continuing to breakdown until manageable work packages have been identified. (True/False)

Last Answer : Ans. True

Description : CASE tool is a popular graphic depiction of the work plan that lists project tasks along a y-axis, time along an x-axis, and uses shaded boxes to represent tasks.

Last Answer : Ans: False

Description : The network diagram is the best tool for demonstrating:  A. Schedule variances B. Resource requirements C. The sequence of project activities  D. Schedule performance over time

Last Answer : C. The sequence of project activities

Description : Consider the following situation in a flow mass curve study when demand line drawn from a ridge in the mass curve does not intersect the mass curve again. This means that : (a) The storage is not ... (c) The reservoir was not full at the beginning (d) The reservoir is wasting water by spill

Last Answer : (b) The demand cannot be met by the inflow as the reservoir will not refill

Description : Following is (are) the tool(s) for changing a process (A)Change Management System (CMS) (B)Configuration Management (CM) (C)Both (A) and (B) (D)None of the above

Last Answer : (C)Both (A) and (B)

Description : Which of the following is not a Requirement Management  workbench tool? a) RTM b) DOORS c) Rational Suite d) RDD 100

Last Answer : c) Rational Suite