Which of the following is not a Requirement Management 

workbench tool?

a) RTM

b) DOORS

c) Rational Suite

d) RDD 100

1 Answer

Answer :

c) Rational Suite

Related questions

Description : -------- is not a Test Document. a)Test Policy b)Test Case c) PIN ( Project Initiation Note) d)RTM (requirement Traceability matrix)

Last Answer : pin

Description : Which of the following is a requirement management activity ? a) Investigation b) Design c) Construction and Test d) All of the mentioned

Last Answer : d) All of the mentioned

Description : Requirements traceability is one of the most important part requirement management. It may also be referred to as the heart of requirement management. a) True b) False

Last Answer : a) True

Description : Considering the example of issue/return of a book, cataloging etc. in a library management.What type of management requirement is being depicted here? a) Enduring b) Volatile

Last Answer : a) Enduring

Description : Which two requirements are given priority during Requirement  Management of a product ? a) User and Developer b) Functional and Non-functional c) Enduring and Volatile

Last Answer : c) Enduring and Volatile

Description : Which one of the following statements best describes the use of an issue log? a. A summary of all possible alternative resolutions of an issue. b. A summary of all the project issues, their ... for capturing all issues. d. A tool to ensure that the issue management process is adhered to.

Last Answer : b. A summary of all the project issues, their analysis and status.

Description : Following is (are) the tool(s) for changing a process (A)Change Management System (CMS) (B)Configuration Management (CM) (C)Both (A) and (B) (D)None of the above

Last Answer : (C)Both (A) and (B)

Description : What is a cash flow table in project management?  A. A table portraying inflow of cash in a project  B. A table portraying outgoing expenses of a project  C. It is the tool that is used ... inflows and  outflows down, usually on a monthly basis  D. A table portraying debts taken for a project

Last Answer : C. It is the tool that is used to study such cash flows by breaking inflows and  outflows down, usually on a monthly basis

Description : What is the definition of Earned Value Management? A. An approach that combines the scope, schedule, and cost baseline into a project  performance and progress measurement tool.  B. ... approach that combines the scope and cost baseline into a project performance and  progress measurement tool.

Last Answer : A. An approach that combines the scope, schedule, and cost baseline into a project  performance and progress measurement tool.

Description : Which one of the following statements best describes the use of an issue log?  a. A summary of all possible alternative resolutions of an issue.  b. A summary of all the project issues, their ... for capturing all issues.  d. A tool to ensure that the issue management process is adhered to.

Last Answer : b. A summary of all the project issues, their analysis and status.

Description : What Are The Functions Of Project Management Tool?

Last Answer : Following are some functions of Project Management tool:  Task management.  File storage.  Reporting functions.  Commenting and message boards.  Client access.  Subcontractor task assignment.  Time tracking.

Description : RUP stands for created by a division of a) Rational Unified Program, IBM b) Rational Unified Process, Infosys c) Rational Unified Process, Microsoft d) Rational Unified Process, IBM

Last Answer : d) Rational Unified Process, IBM

Description : Apple Mail and RTM?

Last Answer : RTM?

Description : Simple Workbench Solutions?

Last Answer : A garage or work area is pretty useless in the home if you have no platform to use in order to perform specific tasks. Building simple workbenches is an awesome way to not only increase the value of ... few short hours, you could have more workspace in your home and this will not cost much at all.

Description : To protect the rotor of a motor disassembled for maintenance or overhaul, it should be ___________________. A. suspended by wire slings in one corner of the shop B. wrapped in several layers of heavy ... flat wood blocks on the workbench D. returned to the frame as soon as the bearings are removed

Last Answer : Answer: B

Description : Resorce requirement in project becomes constant while the project is in its _____ progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Which of the following activity is undertaken immediately after feasibility study and before  the requirement analysis and specification phase? A. Project Planning B. Project Monitoring C. Project Control D. Project Scheduling

Last Answer : A. Project Planning

Description : Identify, from among the following, the correct statement. a) One of the main challenges Engineering facing today is the requirement of most systems to work with a multitude of  homogenous systems ... of component based assembly, we find  that onlyless than 20% of today's is still custom built

Last Answer : c) does not wear-out in the traditional sense of the term, but  does tend to deteriorate as it evolves

Description : Resorce requirement in project becomes constant while the  project is in its progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A) Algorithmic model (B) Expert judgment (C) Top down (D) Analogy

Last Answer : (D) Analogy

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A)Algorithmic model (B)Expert judgment (C)Top down (D)Analogy

Last Answer : (D)Analogy

Description : CASE tool is a popular graphic depiction of the work plan that lists project tasks along a y-axis, time along an x-axis, and uses shaded boxes to represent tasks.

Last Answer : Ans: False

Description : All of the following are true regarding the Qualitative Risk Analysis process except  which one?  A. Probability and impact and expert interview are used to help correct biases that occur  in the data ... of this process used to determine  which risks need near-term response plans.

Last Answer : C. Qualitative Risk Analysis is an easy method of determining risk probability and  impact that usually takes a good deal of time to perform.

Description : The network diagram is the best tool for demonstrating:  A. Schedule variances B. Resource requirements C. The sequence of project activities  D. Schedule performance over time

Last Answer : C. The sequence of project activities

Description : The statistical tool that depicts a project’s tasks and the relationships between those tasks is  known as (A) milestone (B) goal (C) Gantt chart (D) PERT chart

Last Answer : (D) PERT chart

Description : Which is not a tool of rational choice?

Last Answer : Devising monetary policies.

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : A ____ is a set of activities which are networked in an order and aimed towards achieving the goals of a project. (A) Project (B) Process (C) Project management (D) Project cycle

Last Answer : (A) Project

Description : Which one of the following is true for the Project Management Plan (PMP)? a. The Project Management Plan is developed by the project manager and team and owned by the  sponsor. b. A ... The Project Management Plan is developed by the project manager and team and owned by the project manager.

Last Answer : d. The Project Management Plan is developed by the project manager and team and owned by the project manager.

Description : Which one of the following best defines a benefit? a. A positive result of stakeholder management. b. The successful management of a project. c. An improvement resulting from project deliverables. d. The successful delivery of project reports and updates.

Last Answer : c. An improvement resulting from project deliverables.

Description : Configuration management is best described as: a. control in the implementation of changes to project schedules. b. an organization to review proposed changes to the project deliverables ... and documentation. d. creation, maintenance and controlled change of the project deliverables.

Last Answer : d. creation, maintenance and controlled change of the project deliverables.

Description : The main aim of a project risk management process should be to: a. identify project risks and then manage them appropriately. b. identify all project risks and transfer them immediately. c ... are threats or opportunities on a project. d. satisfy the organization's project management process.

Last Answer : a. identify project risks and then manage them appropriately.

Description : Which one of the following illustrates why effective project management is beneficial to an organization? a. It utilizes resources as and when required under direction of a project manager. b. ... d. It ensures that the chief executive is accountable for the achievement of the defined benefits.

Last Answer : a. It utilizes resources as and when required under direction of a project manager.

Description : The main purpose of the Project Management Plan is to: a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk of  alternative options. b. ensure ... the  project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for managing the  project.

Description : Which one of the following best describes project success criteria? a. Actively seeking some senior management support. b. Measures by which the success of the project is judged. c. Achievement of milestones. d. A motivated project team.

Last Answer : b. Measures by which the success of the project is judged.

Description : A Responsibility Assignment Matrix (RAM) can be used to: a. define the terms of reference of the project manager. b. define the limits of the project sponsor's responsibilities. c ... response activities to project personnel. d. allocate work packages to those responsible for project work.

Last Answer : d. allocate work packages to those responsible for project work.

Description : The document that identifies what information needs to be shared, to whom, why, when and how is called the: a. communication management plan. b. stakeholder mapping grid. c. document distribution schedule. d. responsibility assignment matrix.

Last Answer : a. communication management plan.

Description : The justification for the investment to be made in a project is documented in the: a. Cost Breakdown Structure. b. procurement strategy. c. business case. d. Project Management Plan.

Last Answer : c. business case.

Description : Which one of the following does project change control primarily seek to ensure? a. All variance to the project scope is evaluated. b. No reduction in the perceived quality of the project outcome. ... project do not increase. d. Any decrease in the scoped deliverable of the project is rejected.

Last Answer : a. All variance to the project scope is evaluated.

Description : Which one of the following is not considered in resource management? a. Identifying resources. b. Influencing resources. c. Assigning resources to activities. d. Matching resources to the schedule.

Last Answer : b. Influencing resources.

Description : The main outcome of risk identification, in a risk management process, is to: a. identify and determine the relative importance of the project risks. b. identify and describe all risks that ... responses to the project risks. d. identify and describe risks that have occurred on previous projects.

Last Answer : b. identify and describe all risks that might occur on the project.

Description : . In project management, the term quality is best defined as: a. inspection, testing and measurement. b. reviews and audits. c. fitness for purpose of deliverables. d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : What is defined as “the ability to influence and align others towards a common purpose”? a. Teamwork. b. Motivation. c. Management. d. Leadership.

Last Answer : d. Leadership.

Description : Who owns the Project Management Plan (PMP)? a. The project team. b. The chief executive. c. The project manager. d. The project support office.

Last Answer : c. The project manager.

Description : Which one of the following is a valid project Key Performance Indicator (KPI)? a. Staff appraisals. b. Management buy in. c. Milestone achievement. d. Master schedule.

Last Answer : c. Milestone achievement.

Description : Which one of the following is least likely to be a success criteria? a. A target for the project to receive zero change requests. b. The date by which the project is to be completed. c. Delivery of products that meet required specifications. d. The awarding of bonuses to senior management.

Last Answer : d. The awarding of bonuses to senior management.

Description : Scheduling can best be defined as the process used to determine: a. overall project duration. b. project cost estimating. c. the project management plan. d. sub-contractor’s responsibilities.

Last Answer : a. overall project duration.

Description : Project risk management is best described as: a. managing responses to threats. b. identifying and acknowledging threats and opportunities. c. planning responses to threats. d. minimising threats and maximising opportunities.

Last Answer : d. minimising threats and maximising opportunities.

Description : A communication management plan identifies the relevant information that should be communicated to: a. the project team. b. the project stakeholders. c. the project board. d. the project sponsor.

Last Answer : b. the project stakeholders.

Description : Alice is a Project Manager. She is coordinating a bidder conference to allow vendors to get clarification on the work that needs to be performed. Which phase of Project Management is in progress. A. Conduct Procurements B. Plan Procurements C. Control Procurements D. Close Procurements