Which of the following is the process of assembling program 

components, data, and libraries, and then compiling and linking these to 

create an executable system?

a) System building

b) Release management

c) Change management

d) Version management

1 Answer

Answer :

a) System building

Related questions

Description : What involves preparing for external release and keeping track of the system versions that have been released for customer use? a) System building b) Release management c) Change management d) Version management

Last Answer : b) Release management

Description : Compiling creates a(n)- 1) Program Specification 2) Algorithm 3) Executable Program 4) Subroutine

Last Answer : 3) Executable Program

Description : The Process of writing out computer instructions is known as- 1) Assembling 2) Compiling 3) Executing 4) coding

Last Answer : 1) Assembling

Description : ..... is the process finding errors in software code. 1) compiling 2) Assembling 3) Interpreting 4) Debugging

Last Answer : 4) Debugging

Description : Assembling project team and assigning their responsibilities are done during which phase of a  project management? (A) Initiation (B) Planning (C) Execution (D) Closure

Last Answer : A) Initiation

Description : Cost budgeting can be best described by which of the following? 1. The process of developing the future trends along with the assessment of probabilities,  uncertainties, and inflation that  could ... of gathering, accumulating, analyzing, reporting, and managing the costs on an on- going basis

Last Answer : 3. The process of establishing budgets, standards, and a monitoring system by which the  investment cost of the project can be measured and managed

Description : Cost controls can be best described by which of the following? 1. The process of developing the future trends along with the assessment of probabilities,  uncertainties, and inflation that  could ... of gathering, accumulating, analyzing, reporting, and managing the costs on  an on-going basis.

Last Answer : 4. The process of gathering, accumulating, analyzing, reporting, and managing the costs on  an on-going basis.

Description : he linking of computer with a communication system is called……….. a.networking b.pairing c.interlocking d.assembling

Last Answer : a.networking

Description : Problems with using Lines of Code to measure the size of a product include(s) a) The creation of source code is only part of the development effort b) The Lines of Code (LOC) will differ between ... The final size (kLOC) can only be determined once the product is delivered e) All of the above.

Last Answer : e) All of the above.

Description : Which of the following is incorrect activity for the configuration management of a software system? a) Internship management b) Change management c) Version management d) System management

Last Answer : a) Internship management

Description : Which of the following is incorrect activity for the configuration management of a software system? a) Internship management b) Change management c) Version management d) System management

Last Answer : a) Internship management

Description : Which of the following is incorrect activity for the configuration management of a system? (A)Internship management (B) Change management (C) Version management (D) System management

Last Answer : (A)Internship management

Description : Google cloud SQL Features a) Lets your application read files from and write files to buckets in Google cloud storage b) A Fully -managed web service that allows you to create , ... large applications into logical components that can be share stateful services and communicate in secure fashion.

Last Answer : A Fully –managed web service that allows you to create , configure , and use relational databases that live in Google’s cloud

Description : What combines procedures and tools to manage different versions of configuration objects that are created during the process? a) Change control b) Version control c) SCIs d) None of the mentioned

Last Answer : b) Version control

Description : Lower CASE tools are used to create integrated diagrams of the system and store  information about system components during the analysis phase.

Last Answer : Ans: False

Description : Which of the following is not a Configuration Management  Activity? a) Configuration item identification b) Risk management c) Release management d) Branch management

Last Answer : b) Risk management

Description : Suppose you have bought all hardware components required for assembling a computer. -Technology

Last Answer : (b) Operating system will be the very first software to be installed after assembling the computer system.

Description : Which of the following are the principles tasks of the linker? I. Resolve external references among separately compiled program units. II. Translate assembly language to machine code. III. Relocate code and data relative to the beginning of ... (A) I and II (B) I and III (C) II and III (D) I and IV

Last Answer : (B) I and III

Description : The primary components of the quality management function are : 1. quality planning  2. quality control and assurance  3. quantitative measurement  4. quantitative assessment of the project

Last Answer : 5. a and b

Description : Which model is used to compute the effort required to  integrate reusable components or program code that is  automatically generated by design or program translation  tools? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : c) A reuse model

Description : Does Each Project Have To Create Its Own Management System?

Last Answer : The style of the individual project manager will normally vary for each project. It is the responsibility of senior management to put in place a policy and procedure, supported by a selection of ... tools and formats, which will assure that the status reporting is readable, auditable, and valid.

Description : Educational institutions,libraries, hospitals and industries store concerned information by- a)Operating systems b) Word Processing c) Data management d) informing systems

Last Answer : c) Data management

Description : Following is (are) the tool(s) for changing a process (A)Change Management System (CMS) (B)Configuration Management (CM) (C)Both (A) and (B) (D)None of the above

Last Answer : (C)Both (A) and (B)

Description : What is correcting errors in a program called? 1) Debugging 2) Compiling 3) Interpreting 4) None of these

Last Answer : 1) Debugging

Description : During the planning development process, at times it is necessary to make certain assumptions to enhance the project plan when the data is not available. In regard to making those assumptions, ... upon historical data used for the project.  4. Senior management predefines the budget constraints.

Last Answer : 1. The assumptions will be considered as true, real, or certain.

Description : Which is a configuration management concept that helps us to  control change without seriously impeding justifiable change? a) Baselines b) Source code c) Data model d) None of the mentioned

Last Answer : a) Baselines

Description : What should be done by the project manager to ensure that all the work in the  project is included? Select one: a. Create a contingency plan. b. Create a risk management plan. c. Create a WBS. d. Create a statement of work. e. Create a scope statement.

Last Answer : c. Create a WBS.

Description : A critical success factor for project management is to _____.  a. create a work plan  b. follow the three steps of project management  c. identify most project tasks  d. manage the hundreds of tasks

Last Answer : e. start with a realistic assessment of the work

Description : The main aim of a project risk management process should be to: a. identify project risks and then manage them appropriately. b. identify all project risks and transfer them immediately. c ... are threats or opportunities on a project. d. satisfy the organization's project management process.

Last Answer : a. identify project risks and then manage them appropriately.

Description : The main aim of a project risk management process should be to:  a. identifies project risks and then manage them appropriately.  b. identify all project risks and transfer them immediately.  ... are threats or opportunities on a project.  d. satisfy the organisation's project management process.

Last Answer : a. identifies project risks and then manage them appropriately.

Description : The main purpose of the Project Management Plan is to: a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk of  alternative options. b. ensure ... the  project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for managing the  project.

Description : Complete the following statement. The method of incorporating change into  project planning and execution processes is called the: Select one: a. project logic diagram. b. change management process. c. milestone schedule d. critical path e. rough order of magnitude

Last Answer : b. change management process.

Description : The main purpose of the Project Management Plan is to:  a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk  of alternative options.  b ... managing the project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for  managing the project.

Description : Which one of the following statements best defines procurement? a. A technique to establish the best approach for obtaining the resources for the project. b. A group of interrelated resources and ... product. d. The process by which products and services required for the project are acquired.

Last Answer : d. The process by which products and services required for the project are acquired.

Description : Which one of the following statements best defines procurement?  a. A technique to establish the best approach for obtaining the resources for the project.  b. A group of interrelated resources and ... product.  d. The process by which products and services required for the project are acquired.

Last Answer : d. The process by which products and services required for the project are acquired.

Description : The most successful project manager usually: 1. works their way up from assistants in the project office to full-fledged project managers,  supplementing that experience with formal ... . Has considerable experience as a functional manager before moving into the project  management arena.

Last Answer : 1. works their way up from assistants in the project office to full-fledged project managers,  supplementing that experience

Description : . The PERT in project management means program evaluation and _____ technique. (A) resource (B) reconciliation (C) reconsideration (D) review

Last Answer : (D) review

Description : contain library program have to be indicated to the loader. a. Externally defined b. Internally defined c. Executable file d. All of these

Last Answer : a. Externally defined

Description : When subroutine is called contents of program counter is location address of __ instruction following call instruction is stored on _ __and program execution is transferred to __ address. a. Non ... , Stack and Main program Cc. Executable, Queue and Subroutine d. Executable, Stack and Subroutine

Last Answer : d. Executable, Stack and Subroutine

Description : _______viruses infect executable program files: a) File Infector Viruses b) Macro Viruses c) Multi Partite Viruses d) None of These

Last Answer : a) File Infector Viruses

Description : A(n) _____ program is one that is ready to run and does not need to be altered in any way. a) Interpreter b) High level c) Compiler d) Executable e) None of these

Last Answer : d) Executable

Description : A ………………… attaches itself to executable files and replicates, when the infected program is executed, by finding other executable files to infect. A) Stealth virus B) Polymorphic Virus C) Parasitic Virus

Last Answer : C) Parasitic Virus

Description : The ............... transfers the executable image of a C++ program from hard disk to main memory. (A) Compiler (B) Linker (C) Debugger (D) Loader

Last Answer : (D) Loader

Description : _____is the process of finding errors in software code. 1) Compiling 2) Testing 3) Running 4) Debugging 6 5) None of these

Last Answer : Answer :4

Description : The process of combining strings is known as (1) compiling (2) Combining (3) Attaching (4) Concatenation

Last Answer : Concatenation

Description : Which of the following is a quality management system that gives titles to specialists and requires a cost-benefit analysis? Select one: a. Lean accounting b. Business process re-engineering c. Kaizen d. Six Sigma e. Total Quality Management

Last Answer : d. Six Sigma

Description : Project management is the process of planning and controlling the development of a  system within a specified time frame at a minimum cost with the right functionality.  Ans: True

Last Answer : Ans: True

Description : _____ is the process of planning and controlling the development of a system within a  specified time frame at a minimum cost with the right functionality.  a. Project management  b. Symantic timeline  c. Task identification  d. Time estimation  e. Work plan

Last Answer : a. Project management

Description : System test can begin when? I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting II. The development team provides software to the test team 3 business days prior ... . I and II only B. II and III only C. I and III only D. I, II and III

Last Answer : D. I, II and III

Description : An example of the risk involved in development is a) Key personnel may resign before the product is complete b) The manufacturer of critical components (e.g. the hardware  associated with a ... a fully functional lower-cost  equivalent package e) All of these are risks involved in development.

Last Answer : e) All of these are risks involved in development.