In the initial stage of the project the probability of completing the project is ___ .

(A) Zero

(B) High

(C) Low

(D) Any of the above

1 Answer

Answer :

(C) Low

Related questions

Description : .In the initial stage of the project the probability of completing the project is ___ .   A.Zero  B.High  C.Low  D.Medium

Last Answer : C.Low

Description : In the initial stage of the project the probability of completing the  project is . (A)Zero (B)High (C)Low (D)Any of the above

Last Answer : (C)Low

Description : Which of the following is not correct about initial phase of a project? a. The cost associated at the beginning of the project is highest. b. Stakeholders have maximum influence during this phase c. The highest uncertainty is at this stage of the project. d. All the above statements are correct.

Last Answer : a. The cost associated at the beginning of the project is highest.

Description : Which of the following is not correct about initial phase of a project? a. The cost associated at the beginning of the project is highest. b. Stakeholders have maximum influence during this phase c. The highest uncertainty is at this stage of the project. d. All the above statements are correct.

Last Answer : a. The cost associated at the beginning of the project is highest.

Description : ___ builds on the work done in project initiation through the development of a project 

Last Answer : Ans. Project planning

Description : ___ is a financial term to describe a business or project where the sales revenue is equal  to total expenses.

Last Answer : Ans. Break-even

Description : ___ should be made of all cost factors so as to reflect on all relevant investment and  operational costs of the project including contingencies.

Last Answer : Ans. Realistic estimates

Description : During which stage of Risk planning are risks prioritized based on probability and impact? a. Identify Risks b. Plan Risk responses c. Perform Qualitative risk analysis d. Perform Quantitative risk analysis

Last Answer : c. Perform Qualitative risk analysis

Description : During which stage of Risk planning are risks prioritized based on probability and impact? a. Identify Risks b. Plan Risk responses c. Perform Qualitative risk analysis d. Perform Quantitative risk analysis

Last Answer : c. Perform Qualitative risk analysis

Description : Requirements Management has a high initial start-up cost but  does not need ongoing funding throughout a project. a) True b) False

Last Answer : b) False

Description : The probability of completing the project can be estimated based upon the ____ . (A) Uniform distribution curve (B) Normal distribution curve. (C) U-shaped distribution curve (D) None of the above

Last Answer : (B) Normal distribution curve.

Description : The probability of completing the project can be estimated based  upon the . (A)Uniform distribution curve (B)Normal distribution curve. (C)U-shaped distribution curve (D)None of the above

Last Answer : (B)Normal distribution curve.

Description : The process of assessing the probability and consequences of identified risks to the project objectives, assigning a risk score to each risk, and creating a list of prioritized risks describes ... Risk Analysis B. Risk Identification C. Qualitative Risk Analysis D. Risk Management Planning

Last Answer : C. Qualitative Risk Analysis

Description : )The total amount of risk that is calculated for a project is found by 1. Multiplying the sum of each the risk times the amount at stake 2. Calculating the cumulative sum of the probability for ... 3. Cannot be calculated since all risks are not know  4. The amount of project reserves available

Last Answer : 2. Calculating the cumulative sum of the probability for each risk and multiplying this value times the consequence of occurrence of the risk events

Description : The Three attributes of project risk are _________, ___________ and ___________. 1. What might happen, who it happens to, and how much will it cost  2. Notification, frequency of relevant events, ... planning, total number of risk events 5. Risk event, probability occurrence, the amount at stake

Last Answer : 5. Risk event, probability occurrence, the amount at stake

Description : The payback period is the period  A. a project takes to pay back the loan taken to purchase the capital assets  B. equal to the useful life of the machines  C. a project takes to recover its initial cash outflow  D. over which the project will be getting operating cash inflows

Last Answer : C. a project takes to recover its initial cash outflow

Description : A Firm is considering undertaking a project that would yield annual profits (after  depreciation) of Rs 68,000 for 5 years. The initial outlay of the project would be Rs  800,000 and the project's assets would have ... accounting rate of return for this project?  A 16%  B 8.5%  C 8.0%  D 9.1%

Last Answer : A 16%

Description : ) One of the initial project documents, issued by senior management, which outlines the  authority of the project manager, is called Project charter. As a seller, what other document can  be used in this place: 1. Work breakdown structure  2. Project scope  3. Contract  4. Internal memo

Last Answer : 3. Contract

Description : A project has the following cash inflows Rs.34,444; Rs.39,877; Rs.25,000; and Rs.52,800 for years 1 through 4, respectively. The initial cash outflow is Rs.104,000. Which of the following four statements ... than or equal to 14%, but less than 18%. D. The IRR is greater than or equal to 18%.

Last Answer : C. The IRR is greater than or equal to 14%, but less than 18%.

Description : Which of the following statements is incorrect regarding a normal project? A. If the NPV of a project is greater than 0, then its PI will exceed 1. B. If the IRR of a project is 8%, its NPV, using ... the IRR of a project is greater than the discount rate, k, then its PI will be greater than 1.

Last Answer : D. If the IRR of a project is greater than the discount rate, k, then its PI will be greater than 1.

Description : Which of the following is least likely to be part of the calculation of the terminal- year incremental net cash flow for an energy-related expansion project? A. An initial working capital ... Disposal/reclamation costs C. Capitalized expenditures D. Salvage value of any sold or disposed assets

Last Answer : D. Salvage value of any sold or disposed assets

Description : The entire process of a project may be considered to be made up on number of sub process placed in different stage called the (A) Technical key resources (B) Work key structure (C) Work Breakdown Structure (WBS). (D) None of the above

Last Answer : (C) Work Breakdown Structure (WBS).

Description : Resorce requirement in project becomes constant while the project is in its _____ progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Once the project is approved and moves into the planning stage, what happens  in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : Once the project is approved and moves into the planning stage, what  happens in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : The planning and scoping should be such that the project manager can assess every  stage of the project and the quality of the deliverable of the project at every stage. (True/False)

Last Answer : Ans. True

Description : In the ____ stage, of project identification the project ideas generated above are  screened and a preliminary exercise is conducted to weed out the bad or unviable ideas.

Last Answer : Ans. Screening

Description : Feasibility analysis is the first stage in the process of project development. (True/False)

Last Answer : Ans. True

Description : It is often difficult to estimate size at an early stage in a project  when only a specification is available a) True b) False

Last Answer : a) True

Description : Controlling the changes in the project may affect (A)The progress of the project (B)Stage cost (C)Project scope (D)All of the abov

Last Answer : (D)All of the abov

Description : The entire process of a project may be considered to be made up on number of sub process placed in different stage called the (A)Technical key resources (B)Work key structure (C)Work Breakdown Structure (WBS). (D)None of the above

Last Answer : (C)Work Breakdown Structure (WBS).

Description : Resorce requirement in project becomes constant while the  project is in its progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Which stage marks the beginning of the project? a ) Initiation b) Planning c) Deciding on a project d) Closing out the previous project.

Last Answer : Initiation

Description : Which stage of project management life cycle requires the maximum time of  completion  A.Conceptualization  B.Planning  C.Execution  D.Estimation

Last Answer : C.Execution

Description : Estimates from the planning stage will need to be refined as the project progresses,  because it is virtually impossible to develop an exact assessment of the project’s schedule  before the analysis and design phases are conducted.

Last Answer : Ans: True

Description : You are the project manager for a cable service provider. Your team members are  amiable with each other and are careful to make project decisions jointly. Which of the  following statements is true?  ... stage of Develop Project Team. D. They are in the forcing stage of Develop Project Team.

Last Answer : B. They are in the norming stage of Develop Project Team.

Description : Changes to the project involve moving from: A. Project control stage to project definition stage B. Project control stage to project planning stage C. Project control stage to understanding the project environment stage D. None of the above

Last Answer : A. Project control stage to project definition stage

Description : Which one of the following is least likely to be a success criteria? a. A target for the project to receive zero change requests. b. The date by which the project is to be completed. c. Delivery of products that meet required specifications. d. The awarding of bonuses to senior management.

Last Answer : d. The awarding of bonuses to senior management.

Description : A project has a Profitability Index of 1.30. What does it mean?  A.The NPV is less than zero B.The payback period is more than one year  C.That the project returns Rs 1.30 for every Re 1 invested in the project  D.That IRR is 1.30 times that of the Hurdle Rate

Last Answer : C.That the project returns Rs 1.30 for every Re 1 invested in the project

Description : Which one of the following is least likely to be a success criterion?  a. A target for the project to receive zero change requests.  b. The date by which the project is to be completed.  c. Delivery of products that meet required specifications.  d. The awarding of bonuses to senior management.

Last Answer : d. The awarding of bonuses to senior management.

Description : A profitability index (PI) of .92 for a project means that . A. The project's costs (cash outlay) are (is) less than the present value of the project's benefits B. The project's NPV is ... is greater than 1 D. The project returns 92 cents in present value for each current rupee invested (cost)

Last Answer : C. The project's NPV is greater than 1

Description : As a new project manager, Karen was worried about a statement from  her client: your project deliverable is in low quality with low grade .  According to PMBOK, how can you help Karen ... quality with high grade is always desirable to your client. e. High quality always  represents high grade.

Last Answer : c. Low quality represents a true problem, but low grade might not be the case.

Description : The comple `[Fe(H_(2)O)_(6)NO]^(2+)` is formed in the brown ring test fro nitrates when freshly prepared `FesO_(4)` solution is added to aqueous solut

Last Answer : The comple `[Fe(H_(2)O)_(6)NO]^(2+)` is formed in the brown ring test fro nitrates when ... electrons is Fe. D. All the above are correct statement.

Description : All of the following are true regarding the Qualitative Risk Analysis process except  which one?  A. Probability and impact and expert interview are used to help correct biases that occur  in the data ... of this process used to determine  which risks need near-term response plans.

Last Answer : C. Qualitative Risk Analysis is an easy method of determining risk probability and  impact that usually takes a good deal of time to perform.

Description : For a two stage compressor, the ratio of diameter of low pressure cylinder to high pressure cylinder is equal to A. Square of the ratio of final pressure to initial pressure B. The ratio of ... final pressure to initial pressure D. Cube root of the ratio of final pressure to initial pressure

Last Answer : ANSWER : C

Description : Jim Smith, the project manager for a high-profile project, has permitted the users to  add additional features to the systems project. The schedule and costs are now running  over. This project suffers from poor standards.

Last Answer : Ans: False

Description :  The project team has just determined that the deadline for completion will not be met.  In order to deliver a high quality system on schedule, the team has requested that the  features be ... that a fixed deadline be imposed for the project. This technique  is referred to as SDLC methodology.

Last Answer : Ans: False