In the ____ stage, of project identification the project ideas generated above are 

screened and a preliminary exercise is conducted to weed out the bad or unviable ideas.

1 Answer

Answer :

Ans. Screening

Related questions

Description : Estimates from the planning stage will need to be refined as the project progresses,  because it is virtually impossible to develop an exact assessment of the project’s schedule  before the analysis and design phases are conducted.

Last Answer : Ans: True

Description : Earned value management integrates scope, cost, and schedule measures to:  A. assess project performance and progress.  B. develop a preliminary budget. C. assess communication effectiveness among project team members. D. assess whether all requirements were met.

Last Answer : A. assess project performance and progress.

Description : You are the project manager working on a research project for a new drug treatment. Your preliminary project schedule runs past the due date for a federal grant application. The manager of the R&D ... .  A. Crashing B. fast tracking C. resource leveling D. adjusting the resource calendar

Last Answer : A. Crashing

Description : According to the PMBOK Guide, the project manager is identified and assigned  during which process?  A. Prior to beginning the Develop Project Charter process B. At the conclusion of the ... . Prior to beginning the Planning processes D. Prior to beginning the Preliminary Scope Statement process

Last Answer : C. Prior to beginning the Planning processes

Description : Which type of project cost estimate is the most accurate? 1. Preliminary  2. Definitive  3. Order of magnitude  4. Conceptual

Last Answer : 2. Definitive

Description : In ____ style, project manager shares his or her vision with the team but permits them to  use their respective ideas to come up with a solution.

Last Answer : Ans. Authoritative

Description : ____ is a continuous and repetitive process involving screening, documentation,  validation, ranking and approval of viable project ideas for an organization.

Last Answer : Ans. Project identification

Description : A planning phase for an engineering component generated 80 engineering drawings. The QA team randomly selected 8 drawings for inspection. This exercise can BEST be described as example of: A. Inspection B. Statistical Sampling C. Flowcharting D. Control Charting

Last Answer : B. Statistical Sampling

Description : .A planning phase for an engineering component generated 80 engineering drawings. The QA  team randomly selected 8 drawings for inspection. This exercise can BEST be described as  example of: A. Inspection B. Statistical Sampling C. Flowcharting D. Control Charting

Last Answer : B. Statistical Sampling

Description : The main outcome of risk identification, in a risk management process, is to: a. identify and determine the relative importance of the project risks. b. identify and describe all risks that ... responses to the project risks. d. identify and describe risks that have occurred on previous projects.

Last Answer : b. identify and describe all risks that might occur on the project.

Description : Which of the following statements about risk is true? Select one: a. Project risk focuses on identifying, assessing, and eliminating the risks on the project. b. Risk management is all ... are no risk-free projects. e. Risk management involves identification, evaluation, and elevation of risk

Last Answer : d. There are no risk-free projects.

Description : The main product is……….. a. project proposal b. Problem Identification c. Problem Definition d. Project Planning

Last Answer : a. project proposal

Description : In problem identification, project is a. recognized b. defined c. Justified d. All the above

Last Answer : d. All the above

Description : _____ is the process of planning and controlling the development of a system within a  specified time frame at a minimum cost with the right functionality.  a. Project management  b. Symantic timeline  c. Task identification  d. Time estimation  e. Work plan

Last Answer : a. Project management

Description : Monte Carlo analysis can help predict the impact of risks on project deliverables.  This is an element of one of the tools and techniques of which of the following processes? A. Risk Response Planning B. Quantitative Risk Analysis C. Risk Identification D. Qualitative Risk Analysis

Last Answer : B. Quantitative Risk Analysis

Description : The process of assessing the probability and consequences of identified risks to the project objectives, assigning a risk score to each risk, and creating a list of prioritized risks describes ... Risk Analysis B. Risk Identification C. Qualitative Risk Analysis D. Risk Management Planning

Last Answer : C. Qualitative Risk Analysis

Description : The main outcome of risk identification, in a risk management process, is to:  a. identify and determine the relative importance of the project risks.  b. identify and describe all risks that ... to the project risks.  d. identify and describe risks that have occurred on previous projects.

Last Answer : b. identify and describe all risks that might occur on the project.

Description : Listing goals of each existing and proposed project is first step in A. Data Collection B. Establishment of Project council C. Prioritizing the projects D. Identification of project categories

Last Answer : D. Identification of project categories

Description : A planning method, which provides details of the work to accomplish, but also provide some  preliminary description of the work to be done in later phases is called : 1. Progressive detailing  2. Rolling wave  3. Strategic  4. Operational

Last Answer : 2. Rolling wave

Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *

Last Answer : d) All the above

Description : Pick up the incorrect statement from the following: (A) Concrete for which preliminary tests are conducted, is called controlled concrete (B) Bulking of sand depends upon the fineness of grains (C) Concrete mix 1 : 6 : 12, is used for mass concrete in piers (D) All the above

Last Answer : Answer: Option D

Description : The probability of completing the project can be estimated based upon the ____ . (A) Uniform distribution curve (B) Normal distribution curve. (C) U-shaped distribution curve (D) None of the above

Last Answer : (B) Normal distribution curve.

Description : A ____ is a set of activities which are networked in an order and aimed towards achieving the goals of a project. (A) Project (B) Process (C) Project management (D) Project cycle

Last Answer : (A) Project

Description : A ____ needs to possess excellent analytical and organizational skills to manage a project team

Last Answer : Ans. Project Manager

Description : In large organisations, project management shall be of line type function where the  project manager shall have ____ and has total formal control over the division he or she  heads

Last Answer : Ans. Full line authority

Description : In the matrix-type organisation, ____ provide the resources needed and the ____ is  responsible for the project results.

Last Answer : Ans. The functional managers, project manager

Description : ____ is the most common type of project organisation.

Last Answer : Ans. Matrix-type organisation

Description :  ____ is a significant facet of project management.

Last Answer : Ans. Project planning

Description :  If all the steps of project planning are performed successfully, ____ and planning become effective and the ideal outcomes are achieved.

Last Answer : Ans. Scoping

Description : Subsequent to preparing ____, the team plans the project schedule and budget

Last Answer : Ans. Work Breakdown Structure

Description : Project planning involves three processes:____ review, and __

Last Answer : Ans. Identification, analysis

Description : The ____ of project closeout the assessment is to document the best practices and  lessons learned for use on future projects.

Last Answer : Ans. Primary purpose

Description :  ____ is where most of the resources are applied/expended on the project.

Last Answer : Ans. Project execution and control

Description : The project team documents its charge in the form of a ____, which is based on the  project proposal and business case

Last Answer : Ans. Project charter

Description : Various choices of ____ that are available for constructing and developing the project  should be examined.

Last Answer : Ans. Techniques

Description : ____ of a project should be clearly defined, measurable, and achievable.

Last Answer : Ans. Objectives

Description : Project process is classified into ____ and ____ process.

Last Answer : Ans. Project management, product-oriented

Description : Project management consists of interacting processes namely ____, ____, process  interactions, and ____ which are organised in groups.

Last Answer : Ans. Project processes, process groups, customisation

Description : Life cycle of a project manager ____ with the development life cycle.

Last Answer : Ans. Overlaps

Description : The ____ manages the four basic elements of a project: resources, time, money, and  scope

Last Answer : Ans. Project Manager

Description : In the ____ phase of the project life cycle the work gains momentum.

Last Answer : Ans. Quick Momentum

Description : A ____ of activities that are used to achieve the project’s goals or objectives is known as  the project life cycle.

Last Answer : Ans. Rational order

Description : A project charter does not include ____ of the project. (A) scope (B) objectives (C) team (D) all above are included

Last Answer : (D) all above are included

Description : Which stage marks the beginning of the project? a ) Initiation b) Planning c) Deciding on a project d) Closing out the previous project.

Last Answer : Initiation

Description : The entire process of a project may be considered to be made up on number of sub process placed in different stage called the (A) Technical key resources (B) Work key structure (C) Work Breakdown Structure (WBS). (D) None of the above

Last Answer : (C) Work Breakdown Structure (WBS).

Description : In the initial stage of the project the probability of completing the project is ___ . (A) Zero (B) High (C) Low (D) Any of the above

Last Answer : (C) Low

Description : Resorce requirement in project becomes constant while the project is in its _____ progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Which of the following is not correct about initial phase of a project? a. The cost associated at the beginning of the project is highest. b. Stakeholders have maximum influence during this phase c. The highest uncertainty is at this stage of the project. d. All the above statements are correct.

Last Answer : a. The cost associated at the beginning of the project is highest.

Description : Once the project is approved and moves into the planning stage, what happens  in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.