Description : Primary treatment of sewage consists of removal of A. Large suspended organic solids B. Oil and grease C. Sand and girt D. Floating materials
Last Answer : ANS: A
Description : Skimming tanks are A. Used to remove the grease and oil B. Those from which sludge is skimmed out C. Tanks provided with self- cleansing screens D. Improved version of grit chambers
Description : Removal of oil and grease from sewage, is known A. Screening B. Skimming C. Filtration D. None of these
Last Answer : ANS: B
Description : The grit chambers of sewage treatment plants, are generally cleaned after A. 2 days B. 7 days C. 12 days D. 14 days
Last Answer : ANS: D
Description : The sewage treatment in septic tanks is due to A. Anaerobic decomposition B. Aerobic decomposition C. Parasitic decomposition D. None of these
Description : For treating the sewage of a large city, you will recommend A. A sedimentation tank and an activated sludge treatment plant B. A plant consisting of Imhoff tanks with low rate trickling filters C. Sedimentation tanks with high rate trickling filters D. None of these
Description : The sewage treatment units in which anaerobic decomposition of organic matter is used, are called A. Imhoff tanks B. Trickling filters C. Sludge sedimentation tanks D. None of these
Description : Before discharging the foul sewage into rivers, it is generally treated by A. Screening B. Sedimentation C. Oxidation D. All the above
Description : Fine grit present in sewage is removed in the __________ during sewage treatment. (A) Grit chamber (B) Detritus tank (C) Trickling filter (D) Skimming tank
Last Answer : (B) Detritus tank
Description : The dimensions of a rectangular settling tank are: length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is A. 204 cu.m B. 208 cu.m C. 212 cu.m D. 216 cu.m
Description : Assertion A.: A free board of 0.3 m is provided above the top sewage line in septic tanks. Reason (R): It helps to accommodate the scum in the septic tank. A. Both A and R is true and R is the correct ... is not a correct explanation of A C. A is true but R is false D. A is false but R is true
Description : The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope A. 1 in 5 B. 1 in 10 C. 1 in 15 D. 1 in 20
Description : The digested sludge from septic tanks, is removed after a maximum period of A. 3 years B. 3.5 years C. 4 years D. 5 years
Description : Indicate which of the statement is incorrect (a) The detritus tank is type of a grit chamber (b) In detritus tank, velocity of flow is further reduced (c) Grit chambers are provided in the sewage ... to remove the heavier inorganic matter as grit, sand etc. from the sewage (d) None of them*
Last Answer : (d) None of them*
Description : In detritus tanks, A. Flow velocity is kept 0.09 m/sec B. Detention period is kept 3 to 4 minutes C. Organic and inorganic materials are separated D. All the above
Description : The function of skimming tank in sewage treatment is to remove – (1) oil and fatty substances (2) suspended solids (3) gritty substances (4) inorganic substances
Last Answer : (1) oil and fatty substances Explanation: Oil and grease traps are small size skimming basins provided to remove oil and grease and other small floating materials such as fats, vegetable debris, ... content of wastewater rise to the surface of wastewater and remains on top of liquid until removed.
Description : The function of skimming tank in sewage treatment is to remove __________ substances. (A) Dissolved solid (B) Suspended solid (C) Oil & fatty (D) Gritty & inorganic
Last Answer : (C) Oil & fatty
Description : The function of skimming tank in sewage treatment is to remove (1) oil and fatty substances (2) suspended solids (3) gritty substances (4) inorganic substances
Last Answer : oil and fatty substances
Description : Aerobic activity is maximum A. In freshly produced sewage B. At sewer pipes C. In sewer treatment plants D. None of these
Description : The sewer which transports the sewage to the point of treatment, is called A. House sewer B. Out-fall sewer C. Branch sewer D. Main sewer
Description : The sewage discharge in a detritus tank of a treatment plant is 576 litres/sec with flow velocity of 0.2 m/sec. If the ratio of width to depth is 2, the depth is A. 100 cm B. 110 cm C. 120 cm D. 150 cm
Last Answer : ANS: C
Description : Q No: 291 The coagulant widely used for sewage treatment, is A. Alum B. Ferric chloride C. Ferric sulphate D. Chlorinated copperas
Description : The design period of sewage treatment works in normally A. 5 – 10 years B. 15 – 20 years C. 30 – 40 years D. 40 – 50 years
Description : The spacing of bars of perforations of fine screens used for the treatment of sewage, is A. 2 to 3 mm B. 3 to 5 mm C. 5 to 8 mm D. 8 to 10 mm
Description : The spacing of bars for perforations in coarse screens used for the treatment of sewage, is A. 20 mm B. 30 mm C. 40 mm D. 50 mm
Description : In a grit chamber of a sewage treatment plant, A. Flow velocity 0.15 m to 0.3 m/sec is kept B. Depth of 0.9 m to 1.20 m is kept C. One minute of detention period is kept D. All the above
Description : Dried sewage after treatment is used as A. Fertilizer B. Building material C. Chemical for lowering B.O.D. D. Base material for paints
Description : The sewer that unloads the sewage at the point of treatment is called A. Main sewer B. Outfall sewer C. Branch sewer D. House sewer
Description : No treatment of the sewage is given if dilution factor is A. Less than 150 B. Between 150 to 200 C. Between 200 to 300 D. More than 500
Description : If the grit in grit chambers is 4.5 million litres per day, its cleaning is done A. Manually B. Mechanically C. Hydraulically D. Electrically
Description : The recommended detention period for grit chambers is A. 1 minute B. 2 minutes C. 3 minutes D. 5 minutes
Description : The grit and silt of the grit chambers, may not be used for A. Raising low lying areas by dumping B. Concreting C. Both A. and B. D. Neither A. nor B.
Description : During purification process of sewage the gas given off, is A. Carbon dioxide B. Hydrogen C. Ammonia D. All the above
Description : WASTE WATER ENGINEERING Objective Questions with Answers Q No: 161 The quantity of liquid waste which flows in sewers during the period of rainfall, is known A. Sanitary sewage B. Industrial waste C. Storm sewage D. None of these
Description : In septic tanks, decomposition of organic bacteria, is done by A. Anaerobic bacteria B. Aerobic bacteria C. Both types of bacterias D. None of these
Description : The normal values of over flow rates for secondary sedimentation tanks, ranges between A. 25,000 to 35,000 litres/sqm/day B. 40,000 to 50,000 litres/sqm/day C. 50,000 to 60,000 litres/sqm/day D. 80,000 to 10,000 litres/sqm/day
Description : The flow velocity in detritus tanks is A. 0.05 m/sec B. 0.09 m/sec C. 1.25 m/sec D. None of these
Description : The maximum depth of sedimentation tanks, is kept A. 3 m B. 3.5 m C. 4 m D. 4.5 m
Description : In case of Imhoff tanks, A. The shape is rectangular B. Detention period is 2 hours C. The velocity of flow is restricted to 0.30 m/minute D. All the above
Description : The clarigesters are A. Circular septic tanks B. Rectangular septic tanks C. Circular Imhoff double tanks with bottom hoppers D. Circular Imhoff double storey tanks without bottom hoppers
Description : Antisyphonage pipe is fitted A. At the end of septic tanks B. On manholes C. With a W.C. trap D. At the beginning of sewer line
Description : In septic tanks, A. Free board of 0.3 m may be provided B. The baffles or tees are extended up to top level of scum C. The clear space between the baffle top and covering slab is about 7.5 cm D. All the above
Description : The rate of accumulation of sludge in septic tanks is recommended as A. 30 litres/person/year B. 25 litres/person/year C. 30 litres/person/month D. 25 litres/person/month
Description : Which one of the following statements regarding septic tanks is wrong? A. A gap of 7.5 cm between the bottom of the covering slab and the top level of scum is provided B. The outlet invert level is kept ... . The minimum width of septic level is 90 cm D. The depth of tank is kept equal to its width
Description : Pick up the incorrect statement from the following: A. Septic tanks are horizontal continuous flow type of sedimentation tanks B. Septic tanks are generally provided a detention period of 12 to 36 hours C ... covered and high vent shafts are provided for the escape of foul gases D. None of these
Description : The normal value of over flow rates for plain primary sedimentation tanks, ranges between A. 25,000 to 35,000 litres/sqm/day B. 40,000 to 50,000 litres/sqm/day C. 50,000 to 60,000 litres/sqm/day D. 80,000 to 100,000 litres/sqm/day
Description : The detention period for plain sedimentation water tanks, is usually A. 4 to 8 hours B. 8 to 16 hours C. 16 to 24 hours D. 24 to 36 hours
Description : The normal values of over flow rates for sedimentation tanks using coagulant, ranges between A. 25,000 to 35,000 litres/sqm/day B. 40,000 to 50,000 litres/sqm/day C. 50,000 to 60,000 litres/sqm/day D. 80,000 to 100,000 litres/sqm/day
Description : For a continuous flow type of sedimentation tanks A. Width of the tank is normally kept about 6 m B. Length of the tank is normally kept 4 to 5 times the width C. Maximum horizontal flow velocity is limited to 0.3 m/minute D. All the above
Description : In 1000 kg of sewage, the total solids approximate A. 0.5 to 1.0 kg B. 1 kg to 2.0 kg C. 5 kg to 7.5 kg D. 7.5 kg to 10 kg