In detritus tanks, A. Flow velocity is kept 0.09 m/sec B. Detention period is kept 3 to 4 minutes C. Organic and inorganic materials are separated D. All the above

1 Answer

Answer :

ANS: D

Related questions

Description : The flow velocity in detritus tanks is A. 0.05 m/sec B. 0.09 m/sec C. 1.25 m/sec D. None of these

Last Answer : ANS: B

Description : In a grit chamber of a sewage treatment plant, A. Flow velocity 0.15 m to 0.3 m/sec is kept B. Depth of 0.9 m to 1.20 m is kept C. One minute of detention period is kept D. All the above

Last Answer : ANS: D

Description : For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is A. 16 m B. 20 m C. 24 m D. 30 m

Last Answer : ANS: C

Description : The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is A. 30 minutes B. 1 hour C. 1 hour and 30 minutes D. 2 hours

Last Answer : ANS: D

Description : In case of Imhoff tanks, A. The shape is rectangular B. Detention period is 2 hours C. The velocity of flow is restricted to 0.30 m/minute D. All the above

Last Answer : ANS: D

Description : The sewage discharge in a detritus tank of a treatment plant is 576 litres/sec with flow velocity of 0.2 m/sec. If the ratio of width to depth is 2, the depth is A. 100 cm B. 110 cm C. 120 cm D. 150 cm

Last Answer : ANS: C

Description : The dimensions of a rectangular settling tank are: length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is A. 204 cu.m B. 208 cu.m C. 212 cu.m D. 216 cu.m

Last Answer : ANS: D

Description : Pick up the incorrect statement from the following: A. Septic tanks are horizontal continuous flow type of sedimentation tanks B. Septic tanks are generally provided a detention period of 12 to 36 hours C ... covered and high vent shafts are provided for the escape of foul gases D. None of these

Last Answer : ANS: D

Description : For a continuous flow type of sedimentation tanks A. Width of the tank is normally kept about 6 m B. Length of the tank is normally kept 4 to 5 times the width C. Maximum horizontal flow velocity is limited to 0.3 m/minute D. All the above

Last Answer : ANS: D

Description : The detention period for plain sedimentation water tanks, is usually A. 4 to 8 hours B. 8 to 16 hours C. 16 to 24 hours D. 24 to 36 hours

Last Answer : ANS: A

Description : Pick up the correct statement from the following:  (A) Detention period for plain sedimentation tanks ranges between 4 to 8 hours  (B) Detention period for sedimentation tanks, using coagulants usually ... in sedimentation tanks, is generally limited to 0.3 m/minute  (D) All the above

Last Answer : (D) All the above

Description : A sewer pipe contains 1 mm sand particles of specific gravity 2.65 and 5 mm organic particles of specific gravity 1.2, the minimum velocity required for removing the sewerage, is A. 0.30 m/sec B. 0.35 m/sec C. 0.40 m/sec D. 0.45 m/sec

Last Answer : ANS: D

Description : The recommended detention period for grit chambers is A. 1 minute B. 2 minutes C. 3 minutes D. 5 minutes

Last Answer : ANS: A

Description : For efficient working of a sewer, it must be ensured that A. Minimum velocity of 0.45 m/sec, is maintained at its minimum flow B. A maximum velocity of 0.90 m/sec, is maintained at its maximum flow C. Both A. and B. D. Neither A. nor B.

Last Answer : ANS: C

Description : The maximum depth of sedimentation tanks, is kept A. 3 m B. 3.5 m C. 4 m D. 4.5 m

Last Answer : ANS: A

Description : If is the rugosity coefficient, is the bed slope of sewer, the velocity of flow in m/sec may be obtained by the formula V = (1/n) r2/3 s1/2 evolved by A. Chezy B. Manning C. Bazin D. Kutter

Last Answer : ANS: B

Description : In sewers the velocity of flow should not be A. More than the self-cleansing velocity B. Less than the self-cleansing velocity C. Less than 10 m/sec D. More than 20 m/sec

Last Answer : ANS: B

Description : In primary sedimentation, the 0.2 mm inorganic solids get separated if specific gravity is A. 2.25 B. 2.50 C. 2.55 D. 2.65

Last Answer : ANS: D

Description : The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is A. 5 m B. 5.5 m C. 6.5 m D. 7 m

Last Answer : ANS: D

Description : Indicate which of the statement is incorrect (a) The detritus tank is type of a grit chamber (b) In detritus tank, velocity of flow is further reduced (c) Grit chambers are provided in the sewage ... to remove the heavier inorganic matter as grit, sand etc. from the sewage (d) None of them*

Last Answer : (d) None of them*

Description : For a peak discharge of 0.0157 cumec, with a velocity of 0.9 m/sec, the diameter of the sewer main, is A. 10 cm B. 12 cm C. 15 cm D. 18 cm

Last Answer : ANS: C

Description : Cement concrete sewers are only suitable if non-scouring velocity is between A. 2.5 to 3.0 m/sec B. 3.0 to 4.0 m/sec C. 3.5 to 4.5 m/sec D. 4.5 to 5.5 m/sec

Last Answer : ANS: A

Description : To prevent settling down of sewage both at the bottom and on the sides of a large sewer, self-cleaning velocity recommended for Indian conditions, is A. 0.50 m/sec B. 0.60 m/sec C. 0.70 m/sec D. 0.75 m/sec

Last Answer : ANS: D

Description : Pick up the correct statement from the following: A. The sewer pipes of sizes less than 0.4 m diameter are designed as running full at maximum discharge B. The sewer pipes of sizes greater than 0.4 m ... discharge C. The minimum design velocity of sewer pipes is taken as 0.8 m/sec D. All the above

Last Answer : ANS: D

Description : Which one of the following statements regarding septic tanks is wrong? A. A gap of 7.5 cm between the bottom of the covering slab and the top level of scum is provided B. The outlet invert level is kept ... . The minimum width of septic level is 90 cm D. The depth of tank is kept equal to its width

Last Answer : ANS: D

Description : The detention time (t) of a settling tank, may be defined as the time required for A. A particle to travel along its length B. A particle to travel from top surface to bottom sludge zone C. The flow of sewage to fill the tank D. None of these

Last Answer : ANS: C

Description : In septic tanks, decomposition of organic bacteria, is done by A. Anaerobic bacteria B. Aerobic bacteria C. Both types of bacterias D. None of these

Last Answer : ANS: A

Description : The sewage treatment units in which anaerobic decomposition of organic matter is used, are called A. Imhoff tanks B. Trickling filters C. Sludge sedimentation tanks D. None of these

Last Answer : ANS: B

Description : 221 For non-scouring velocity 5 m/sec, the type of sewers generally preferred to, is A. Cast iron sewers B. Cement concrete sewers C. Glazed bricks sewers D. Stone ware sewers

Last Answer : ANS: C

Description : Maximum permissible velocity 1.5 m/sec, is adopted in drains A. With beds of rocks and gravels B. Lined with stones C. Both A. and B. D. Neither A. nor B.

Last Answer : ANS: C

Description : During preliminary treatment of a sewage A. Oil and grease are removed from skimming tanks B. Floating materials are removed by screening C. Girt and sand are removed by girt chambers D. All the above

Last Answer : ANS: D

Description : Assertion A.: A free board of 0.3 m is provided above the top sewage line in septic tanks. Reason (R): It helps to accommodate the scum in the septic tank. A. Both A and R is true and R is the correct ... is not a correct explanation of A C. A is true but R is false D. A is false but R is true

Last Answer : ANS: A

Description : In septic tanks, A. Free board of 0.3 m may be provided B. The baffles or tees are extended up to top level of scum C. The clear space between the baffle top and covering slab is about 7.5 cm D. All the above

Last Answer : ANS: D

Description : Flow through period, in sedimentation tanks, is  (A) Equal to detention period  (B) More than detention period  (C) Less than detention period  (D) Detention period divided by displacement efficiency 

Last Answer : (C) Less than detention period 

Description : For a continuous flow type of sedimentation tanks A. Width of the tank is normally kept about 6 m B. Length of the tank is normally kept 4 to 5 times the width C. Maximum horizontal flow velocity is limited to 0.3 m/minute D. All the above

Last Answer : D

Description : The digested sludge from septic tanks, is removed after a maximum period of A. 3 years B. 3.5 years C. 4 years D. 5 years

Last Answer : ANS: A

Description : The settlement velocity of a solid (diameter 0.5 mm, specific gravity 1.75) in water having temperature 10°C, is A. 213.5 cm/sec B. 313.5 cm/sec C. 413.5 cm/sec D. 500 cm/sec

Last Answer : ANS: B

Description : The self-cleansing velocity of water flowing through pipe lines, is A. 2 metres/sec B. 1 metre/sec C. 0.5 metre/sec D. 0.25 metre/sec

Last Answer : ANS: A

Description : The normal values of over flow rates for secondary sedimentation tanks, ranges between A. 25,000 to 35,000 litres/sqm/day B. 40,000 to 50,000 litres/sqm/day C. 50,000 to 60,000 litres/sqm/day D. 80,000 to 10,000 litres/sqm/day

Last Answer : ANS: A

Description : The normal value of over flow rates for plain primary sedimentation tanks, ranges between A. 25,000 to 35,000 litres/sqm/day B. 40,000 to 50,000 litres/sqm/day C. 50,000 to 60,000 litres/sqm/day D. 80,000 to 100,000 litres/sqm/day

Last Answer : ANS: B

Description : The normal values of over flow rates for sedimentation tanks using coagulant, ranges between A. 25,000 to 35,000 litres/sqm/day B. 40,000 to 50,000 litres/sqm/day C. 50,000 to 60,000 litres/sqm/day D. 80,000 to 100,000 litres/sqm/day

Last Answer : ANS: C

Description : Pick up the correct statement from the following: A. The materials separated by screens, is called screenings B. The screenings are disposed off either by burning or by burial or by dumping C. The process of burning the screenings, is known as compositing D. All the above

Last Answer : ANS: D

Description : The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is A. d² (0.011d + 0.785H)/Q B. d (0.022d + 0.085H)/Q C. d (0.785d + 0.011H)/Q D. d (0.285d + 0.011H)/Q

Last Answer : ANS: A

Description : The width of a rectangular sewer is twice its depth while discharging 1.5 m/sec. The width of the sewer is A. 0.68 m B. 0.88 m C. 1.36 m D. 1.76 m

Last Answer : ANS: C

Description : Primary treatment of sewage consists of removal of A. Large suspended organic solids B. Oil and grease C. Sand and girt D. Floating materials

Last Answer : ANS: A

Description : A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is A. 2.30 m B. 2.40 m C. 2.45 m D. 2.50 m

Last Answer : ANS: C

Description : The detention period for plain sedimentation water tanks, is usually  (A) 4 to 8 hours  (B) 8 to 16 hours  (C) 16 to 24 hours  (D) 24 to 36 hours

Last Answer : (D) 24 to 36 hours

Description : The Brake Horse power of the motor (efficiency 60%) required for a pump of capacity 0.075 cumec for a total lift of 12 m, is A. 10 B. 15 C. 20 D. 25 Q No: 44 Aerobic bacterias A. ... presence of free oxygen B. Consume organic matter as their food C. Oxidise organic matter in sewage D. All the above

Last Answer : ANS: D

Description : The sewage treatment in septic tanks is due to A. Anaerobic decomposition B. Aerobic decomposition C. Parasitic decomposition D. None of these

Last Answer : ANS: A

Description : The clarigesters are A. Circular septic tanks B. Rectangular septic tanks C. Circular Imhoff double tanks with bottom hoppers D. Circular Imhoff double storey tanks without bottom hoppers

Last Answer : ANS: D