Description : The spiral model of software development (A) Ends with the delivery of the software product (B) Is more chaotic than the incremental model (C) Includes project risks evaluation during each iteration (D) All of the above
Last Answer : (C) Includes project risks evaluation during each iteration
Description : Which process model is also called as classic life cycle model? (A) Waterfall model (B) RAD model (C) Prototyping model (D) Incremental model
Last Answer : (A) Waterfall model
Description : This life cycle model is basically driven by schedule and budget risks This statement is best suited for A. Water fall model B. Spiral model C. Incremental model D. V-Model Q33. The bug tracking ... these phases for each bug. I. Phase injected II. Phase detected III. Phase fixed IV. Phase removed
Last Answer : B. I, II and IV
Description : The quick design of a software that is visible to end users leads to ............ (A) iterative model (B) prototype model (C) spiral model (D) waterfall model
Last Answer : (B) prototype model
Description : Software safety is a ................... activity that focuses on the identification and assessment of potential hazards that may affect software negatively and cause an entire ... monitoring and management (B) Software quality assurance (C) Software cost estimation (D) Defect removal efficiency
Last Answer : (B) Software quality assurance
Description : Software safety is quality assurance activity that focuses on hazards that (A) affect the reliability of a software component (B) may cause an entire system to fail. (C) may result from user input errors. (D) prevent profitable marketing of the final product
Last Answer : (B) may cause an entire system to fail.
Description : Software Configuration Management is the discipline for systematically controlling (A) the changes due to the evolution of work products as the project proceeds. (B) the changes due to defects (bugs) being found and then fixed. (C) the changes due to requirement changes (D) all of the above
Last Answer : (D) all of the above
Description : Which one of the following is not a key process area in CMM level 5 ? (A) Defect prevention (B) Process change management (C) Software product engineering (D) Technology change management
Last Answer : (C) Software product engineering
Description : Software Engineering is an engineering discipline that is concerned with: (1) how computer systems work. (2) theories and methods that underlie computers and software systems. (3) all ... (4) all aspects of computer-based systems development, including hardware, software and process engineering.
Last Answer : Answer: 3
Description : In Data mining, .............. is a method of incremental conceptual clustering. (A) STRING (B) COBWEB (C) CORBA (D) OLAD
Last Answer : (B) COBWEB
Description : Consider the following UNIX command: sort temp; head -30
Last Answer : (C) Sort, taking the input from "in" and writing the output to "temp" then prints 30 lines from temp on terminal. Finally "temp" is removed.
Description : Explain incremental process model using suitable diagram.
Last Answer : 1. Incremental model is also called as iterative enhancement model. 2. In this model the software is built in an incremental fashion. 3. Fig shows the project is divided into ... and it should be noted that the process flow for any increment can incorporate the prototyping paradigm.
Description : Pipelining improves performance by: (A) decreasing instruction latency (B) eliminating data hazards (C) exploiting instruction level parallelism (D) decreasing the cache miss rate
Last Answer : (C) exploiting instruction level parallelism
Description : What is your experience or your opinion of the Scrum agile software development methodology?
Last Answer : Never heard of it, but if I understand correctly it seems pretty obvious. Isn’t it just assigning a leader, creating an adversary and planning ahead?
Description : Which of the following is not a software process model? (A) Prototyping (B) Iterative (C) Timeboxing (D) Glassboxing
Last Answer : (D) Glassboxing
Description : The ................ model is preferred for software development when the requirements are not clear. (A) Rapid Application Development (B) Rational Unified Process (C) Evolutionary Model (D) WaterfallModel
Last Answer : (C) Evolutionary Model
Description : Which one of the following statements, related to the requirements phase in Software Engineering, is incorrect ? (A) Requirement validation is one of the activities in the requirements phase. (B) ... . (D) Function points is one of the most commonly used size metric for requirements.
Last Answer : (C) “Modelling-oriented approach” is one of the methods for specifying the functional specifications.
Description : List any two differences betweenIncremental model and Spiral model in developing complex software projects. -Technology
Last Answer : Incremental model works on the stage-wise development of a complex project that involves real time data whereas Spiral model works on risk analysis of a real time situation.Spiral model is a combination of both Incremental as well as Waterfall method.
Description : Which is not a software life cycle model? Spiral Model Waterfall Model Prototyping Model Capability maturity Model
Last Answer : Capability maturity Model
Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing ... after system testing. A. Water Fall Model B.V-Model C. Spiral Model D. RAD Model
Last Answer : B.V-Model
Description : Spiral model is a realistic approach to the development of large-scale systems & software. Justify & explain the model?
Last Answer : Ans. There are several advantages of Spiral model that makes it a realistic approach to development of large-scale systems and software, viz: 1) The spiral model promotes quality assurance ... , which can help in identifying and resolving potential problems or errors in the software development.
Description : How does the risk factor affect the spiral model of software development?
Last Answer : Ans:Risk Analysis phase is the most important part of "Spiral Model". In this phase all possible (and available) alternatives, which can help in developing a cost effective project are analyzed ... data and find out possible solution in order to deal with the potential changes in the requirements.
Description : ___ is performed by the occupational health and safety professional to accomplish a comprehensive study of the workforce, current work practices, identification of potential occupational hazards and engineering controls.?
Last Answer : Baseline survey
Description : In the spiral model ‘risk analysis’ is performed (A) In the first loop (B) in the first and second loop (C) In every loop (D) before using spiral model
Last Answer : (C) In every loop
Description : Explain incremental model? Define core product and detailed plan.
Last Answer : Ans. The incremental model is proposed by D.L PARNAS. It is basically implemented by combining elements of linear sequential model and iterative prototyping model. Incremental development refer to the process ... . Risk of failure of product is decreased as user start using the product early.
Description : ___________shows the management structure of an organization. (a) Hierarchy ; (b) Decision Tree ; (c) Incremental Model ; (d) Satisfying model
Last Answer : (a) Hierarchy ;
Description : The decision making model which emphasises that organisations contain diverse interest groups who will bargain about goals and alternative actions, often with incomplete information is known as the ... model ; (c) Administrative or incremental model ; (d) Computational and rational model
Last Answer : (b) Political model ;
Description : The ______ can cause serious birth defects including mental impairment. a. Mononucleosis b. Cytomegalovirus c. Polio d. Hepatitis C
Last Answer : a. Mononucleosis
Description : The primary objective of formal technical reviews is to find _________ during the process so that they do not become defects after release of the software. a) errors b) equivalent faults c) failure cause d) none of the mentioned
Last Answer : Ans: a
Description : The conceptual model is (A) dependent on hardware. (B) dependent on software. (C) dependent on both hardware and software . (D) independent of both hardware and software.
Last Answer : (D) independent of both hardware and software.
Description : The Prototyping model of software development is: (1) a reasonable approach when requirements are well-defined. (2) a useful approach when a customer cannot define requirements clearly. (3) the ... projects with large development teams. (4) a risky model that rarely produces a meaningful product.
Last Answer : 1
Description : Which of the following is a requirement of an effective software environment? I. Ease of use II. Capacity for incremental implementation III. Capability of evolving with the needs of a project IV. Inclusion of advanced tools A.I, II &III B.I, II &IV C.II, III&IV D.I, III&IV
Last Answer : A.I, II &III
Description : How do you control an agile, gifted ,child?
Last Answer : I wore a leash when I was young. My mom had a hard time keeping up with me when I was two or three.
Description : what is agile development framework
Last Answer : Agile is the name of a software development methodology that calls for rapid iterations through the traditional software development life cycle (analysis, design, development, testing, acceptance). The ... when a group of programmers came together and published the Agile Manifesto back in 2001.
Description : What is Agile Scrum Methodology?
Last Answer : Agile Health Insurance makes it simple to choose, compare & apply online for affordable Health Insurance from leading Health Insurance Companies with ObamaCare options, Short-Term Health & Dental Insurance too!can you view it from here:cutt.ly/1jgTk9K
Description : Who is said to be agile? what is the direct meaning of the word agile?
Last Answer : The direct meaning of the word agile: lifelike, modest, active, agile, skillful, efficient. In Hungarian, this is a positive human quality that can be applied to either our co-workers or even our family members.
Description : How to choose the best Agile methodology?
Last Answer : One that Delivers value to the business/sponsors the fastest Gets great reviews from customers Keeps the team engaged and energized Agile is a framework and there is no one size fits all Agile method. The ... , meets their needs and makes the team feel like they are engaged, then that is the best.
Description : What are Agile and Waterfall?
Last Answer : Agile and Waterfall are two popular project management methodologies. Agile is known for methodology flexibility and incremental approach. Waterfall is a methodology for structured software development and is a sequential design process.
Description : What do you know on how Agile and DevOps get along?
Last Answer : DevOps is a practice of bringing development and operations teams together whereas Agile is an iterative approach that focuses on collaboration, customer feedback and small rapid releases. DevOps focuses on constant testing and delivery while the Agile process focuses on constant changes.
Description : How do you become agile as gymnast?
Last Answer : work out
Description : For an Agile method, when you will not use automation testing?
Last Answer : If your requirements are frequently changing or your documentation becomes massive, then it is better to avoid automation testing method.
Description : Which of the following are the states of a five state process model? i) Running ii) Ready iii) New iv) Exit v) Destroy A) i, ii, iii and v only B) i, ii, iv and v only C) i, ii, iii, and iv only D) All i, ii, iii, iv and v
Last Answer : C) i, ii, iii, and iv only
Description : The …………………………. Is a collection of protocols designed by Internet Engineering Task Force(IETF) to provide security for a packet at the Network level. A) IPsec B) Netsec C) Packetsec D) Protocolsec
Last Answer : A) IPsec
Description : Which one of the following is not a step of requirement engineering ? (A) Requirement elicitation (B) Requirement analysts (C) Requirement design (D) Requirement documentation
Last Answer : (C) Requirement design
Description : What software detects and removes or quarantines computer viruses? a. Backup b. Anti‐virus c. Firewall d. Biometrics
Last Answer : b. Anti‐virus
Description : Write down any one situation where spiral delivery model can be used. Also mention one advantage and one disadvantage of spiral delivery model. -Technology
Last Answer : Situations to use/apply spiral model When project is large,When releases are required to be frequent,When risk and costs evaluation is important For medium to high-risk projectsAdvantage-Additional ... becomes easy as the prototype building is done in small fragmentsDisadvantage-Risk of not meeting
Description : A simple way of looking at the spiral life-cycle model is as a waterfall model with each phase proceeded by a) Build-and-fix b) Freezing c) Synchronization d) Testing e) Risk analysis
Last Answer : e) Risk analysis
Description : Project risk factor is considered in ? Spiral Model Waterfall Model Prototyping Model Iterative enhancement Model
Last Answer : Spiral Model
Description : Which model is popular for students small projects ? Waterfall Model Spiral Model Quick and Fix model Prototyping Mode
Last Answer : Waterfall Model
Description : Spiral Model was developed by? Bev Littlewood Berry Bohem Roger Pressman Victor Bisili
Last Answer : Berry Bohem