Software Configuration Management is the discipline for systematically controlling (A) the changes due to the evolution of work products as the project proceeds. (B) the changes due to defects (bugs) being found and then fixed. (C) the changes due to requirement changes (D) all of the above

1 Answer

Answer :

(D) all of the above

Related questions

Description : Which of the following is a myth in testing? a) Tester can find bugs b) Any user can test software c) Missed defects are not due to testers d) Complete testing is not possible

Last Answer : Ans : b

Description : Software Engineering is an engineering discipline that is concerned with: (1) how computer systems work. (2) theories and methods that underlie computers and software systems. (3) all ... (4) all aspects of computer-based systems development, including hardware, software and process engineering.

Last Answer : Answer: 3

Description : ............... is a process model that removes defects before they can precipitate serious hazards. (A) Incremental model (B) Spiral model (C) Cleanroom software engineering (D) Agile model

Last Answer : (C) Cleanroom software engineering

Description : Configuration management is best described as: a. control in the implementation of changes to project schedules. b. an organization to review proposed changes to the project deliverables ... and documentation. d. creation, maintenance and controlled change of the project deliverables.

Last Answer : d. creation, maintenance and controlled change of the project deliverables.

Description : Your company has asked you to be the project manager for the product introduction  of its new DeskTop Rock media system. You recently published the project scope  statement. Which ... . Constraints  B. Project specifications  C. Requested changes D. Project configuration management requirements

Last Answer : C. Requested changes

Description : Configuration management is best described as:  a. control in the implementation of changes to project schedules.  b. an organisation to review proposed changes to the project deliverables ... and documentation.  d. creation, maintenance and controlled change of the project deliverables.

Last Answer : d. creation, maintenance and controlled change of the project deliverables.

Description : Repeated Testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or ... software component: a) Re Testing b) Confirmation Testing c) Regression Testing d) Negative Testing

Last Answer : c) Regression Testing

Description : The major shortcoming of waterfall model is (A) the difficulty in accommodating changes after requirement analysis. (B) the difficult in accommodating changes after feasibility analysis. (C) the system testing. (D) the maintenance of system.

Last Answer : (A) the difficulty in accommodating changes after requirement analysis.

Description : )Quality costs include : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.  2. Only costs classified as prevention, detection and ... rework due to defects, customer returns and warranty costs.  4. The expense of upper management

Last Answer : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.

Description : Magnetic bearing of a survey line at any place (A) Remains constant (B) Changes systematically (C) Varies differently in different months of the year (D) Is always greater than true bearing

Last Answer : (C) Varies differently in different months of the year

Description : In the method of condensation polymerization, (A) Low-molecular substances are removed from the high molecular substance (B) The reaction proceeds with an evolution of ammonia (C) The reaction proceeds with an evolution of hydrogen chloride (D) All of the above

Last Answer : Answer: Option D

Description : Requirement Development, Organizational Process Focus, Organizational Training, Risk Management and Integrated Supplier Management are process areas required to achieve maturity level (A) Performed (B) Managed (C) Defined (D) Optimized

Last Answer : (C) Defined

Description : In project crashing, as we systematically, crash the project, direct cost of project ______ a. Increases b. Decreases c. Remain same d. None of the above

Last Answer : a. Increases

Description : The most important feature of spiral model is (A) requirement analysis. (B) risk management. (C) quality management. (D) configuration management.

Last Answer : (B) risk management.

Description : The software ................. of a program or a computing system is the structure or structures of the system, which comprise software components, the externally visible properties of those components, and the relationships among them. (A) Design (B) Architecture (C) Process (D) Requirement

Last Answer : (B) Architecture

Description : Which one of the following statements, related to the requirements phase in Software Engineering, is incorrect ? (A) Requirement validation is one of the activities in the requirements phase. (B) ... . (D) Function points is one of the most commonly used size metric for requirements. 

Last Answer : (C) “Modelling-oriented approach” is one of the methods for specifying the functional specifications. 

Description : Which of the following helps in monitoring the Test Progress:- i. Percentage of Test Case Execution ii. Percentage of work done in test environment preparation. iii. Defect Information e.g. defect density, ... ii,iii are correct and iv is incorrect c) i,ii are correct and iii,iv are incorrect

Last Answer : b) i,ii,iii are correct and iv is incorrect

Description : The cost impact of a risk event occurring as a project proceeds through its life cycle tends to A. Slowly rise B. Slowly drop C. Drop sharply and then level out D. Rise sharply and then level out

Last Answer : A. Slowly rise

Description : Setting the number of defects before the lot is rejected, is a direct responsibility of : 1. a functional worker  2. the project manager  3. management  4. the accounting department

Last Answer : 3. management

Description : Pick out the wrong statement. (A) In a first order reaction, A → products; the reaction becomes slower as it proceeds, because the concentration of A decreases and the rate is proportional to the concentration ... irreversible reaction, A + B → 2C is k.CA .CB , then the reaction is always elementary

Last Answer : (C) According to the penetration theory, the mass transfer co-efficient decreases, if the exposure time of an eddy to the solute decreases

Description : Quality ass Quality assurance is urance is a function r function responsible esponsible for a. Controlling Controlling quality quality b. Managing quality c. Inspection d. Removal Removal of defects

Last Answer : b. Managing quality

Description : Locating and eliminating defects in a program is: a) Bugs b) Debugging c) Virus Control Protocol d) None of These

Last Answer : b) Debugging

Description : Project management is the second major component of the planning phase of the  systems development life cycle (SDLC), and it includes three steps: creating the work  plan, staffing the project, and controlling and directing the project.

Last Answer : Ans: True

Description : The three steps of project management are _____. a. controlling the project, directing the project, and creating the work plan  b. creating the work plan, staffing the project, and controlling ... the deliverables  e. setting the start date, estimating the time, and reading the actual time

Last Answer : b. creating the work plan, staffing the project, and controlling and directing the  project

Description : _____ is the process of planning and controlling the development of a system within a  specified time frame at a minimum cost with the right functionality.  a. Project management  b. Symantic timeline  c. Task identification  d. Time estimation  e. Work plan

Last Answer : a. Project management

Description : The goal of quality assurance is to provide management with the data needed to determine which software engineers are producing the most defects. (A) True (B) False

Last Answer : (B) False

Description : Controlling the changes in the project may affect (A)The progress of the project (B)Stage cost (C)Project scope (D)All of the abov

Last Answer : (D)All of the abov

Description : State true of false. i) With paging, each process is divided into relatively small, fixed-size pages. ii) Segmentation provides for the use of pieces of varying size. A) Partition management B) Memory management C) Disk management D) All of the above

Last Answer : B) Memory management

Description : Which one of the following is not a software myth? (A) Once we write the program and get it to work, our job is done. (B) Project requirements continually change, but ... not understand how to control software projects internally, it will invariably struggle when it outsources software projects.

Last Answer : (D) If an organization does not understand how to control software projects internally, it will invariably struggle when it outsources software projects.

Description : Which of the following statement(s) is/are TRUE with regard to software testing? I. Regression testing technique ensures that the software product runs correctly after the changes during maintenance. II. Equivalence partitioning is a ... (1) only I (2) only II (3) both I and II (4) neither I nor II

Last Answer : (1) only I 

Description : Which are the major controlling systems for reduction of volcanic disaster? a. Prediction for early warning of eruption b. Timely evolution and relief work c. Both a and b d. None of the above

Last Answer : c. Both a and b

Description : The cost of quality quality is a. An expression of expression of an organizatio organization's performance in performance in quality in quality in financial terms financial terms b. The ... inspection and inspection and testing of testing of the outputs from outputs from a transformation process.

Last Answer : b. The difference between customers’ expectations of a product or service and their perceptions of their experience of it.

Description : Success Factors for a review include: i. Each Review does not have a predefined objective ii. Defects found are welcomed and expressed objectively iii. Management supports a good review process. iv. There is an emphasis on ... and ii is incorrect c) i , iii , iv , ii is in correct d) ii is correct

Last Answer : a) ii,iii,iv are correct and i is incorrect

Description : When a project manager starts to plan a new project budget, the cost  of which project management process group is expected to be lowest? Select one: a. Initiating b. Executing c. Monitoring and controlling d. Closing e. Planning

Last Answer : d. Closing

Description : Project management is the job of organising, coordinating, and controlling the various  tasks and resources in order to successfully complete a project. (True/False

Last Answer : Ans. True

Description : Project management is the process of planning and controlling the development of a  system within a specified time frame at a minimum cost with the right functionality.  Ans: True

Last Answer : Ans: True

Description : The most significant challenge to project managers is _____.  a. lack of project management training  b. no one really understands how to manage a complex systems development project  ... tools that can assist in controlling project progress  d. unrealistic schedule demands by project sponsors

Last Answer : d. unrealistic schedule demands by project sponsors

Description : What are the 5 major processes of project management?  A. Closing, Executing, Planning, Monitoring and Controlling, Initiating (Ans.)  B. Starting, Closing, Managing, Planning, ... Finishing, Monitoring and Controlling, Executing, Planning D. Starting, Finishing, Executing, Managing, Closing

Last Answer : A. Closing, Executing, Planning, Monitoring and Controlling, Initiating (Ans.)

Description : What is the benefit of using PERT/CPM network as integral component of project management? a. They furnish a consistent framework for planning, scheduling, monitoring and controlling project b. They illustrate ... that the project will be completed by a specific date d. All of the above

Last Answer : d. All of the above

Description : The main purpose of the Project Management Plan is to: a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk of  alternative options. b. ensure ... the  project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for managing the  project.

Description : Configuration Management can be administered in several ways. These include a) A single configuration management team for the whole  organization b) A separate configuration management team for ... c) Configuration Management distributed among the project  members d) All of the mentioned

Last Answer : a) A single configuration management team for the whole  organization

Description : The main purpose of the Project Management Plan is to:  a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk  of alternative options.  b ... managing the project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for  managing the project.

Description : The most important and common protocols associated TCP/IP internetwork layer are. i) Internet protocol(IP) ii) Internet control Message Protocol(ICMP) iii) Bootstrap Protocol (BooTP) iv) Dynamic Host Configuration Protocol (DHCP) v) ... C) ii, iii, iv and v only D) All i, ii, iii, iv and v

Last Answer : D) All i, ii, iii, iv and v

Description : The most important and common protocols associated TCP/IP internetwork layer are. i) Internet Protocol (IP) ii) Internet Control Message Protocol (ICMP) iii) Bootstrap Protocol (BOOTP) iv) Dynamic Host Configuration Protocol (DHCP) V) ... C) i, iii, iv and v only D) All i, ii, iii, iv and v only

Last Answer : D) All i, ii, iii, iv and v only

Description : State whether the following is True or False. i) In bus topology, heavy Network traffic slows down the bus speed. ii) It is multipoint configuration. A) True, True B) True, False C) False, True D) False, False

Last Answer : A) True, True

Description : Which of the following statement is not correct with reference to cron daemon in UNIX O.S? (A) The cron daemon is the standard tool for running commands on a predetermined schedule. (B) It starts ... command lines and the times at which they invoked. (D) Crontab for individual users are not stored.

Last Answer : (D) Crontab for individual users are not stored.

Description : ECL is the fastest of all logic families. High Speed in ECL is possible because transistors are used in difference amplifier configuration, in which they are never driven into ............... (1) Race condition (2) Saturation (3) Delay (4) High impedance

Last Answer : Answer: 2  Explanation: Emitter-coupled logic (ECL) is the fastest of all logic families and therefore is used in applications where very high speed is essential. High speeds have become ... configuration, in which they are never driven into saturation and thereby the storage time is eliminated.

Description : A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a=1. ... ? (1) 11.2 months (2) 12.2 months (3) 13.2 months (4) 10.2 months

Last Answer : Generally, any projects are measured in weeks. However, the complex project might take more time depending on the level of object re-use available.