Description : Project risk factor is considered in ? Spiral Model Waterfall Model Prototyping Model Iterative enhancement Model
Last Answer : Spiral Model
Description : Which model is popular for students small projects ? Waterfall Model Spiral Model Quick and Fix model Prototyping Mode
Last Answer : Waterfall Model
Description : What is the advantage of using prototype software development model instead of waterfall model? Also explain the effect of defining a prototype on the overall cost of the software project?
Last Answer : Ans:The waterfall model: This is the classic SDLC model, with a linear and sequential method that has goals for each development phase. The waterfall model simplifies task scheduling, because ... acceptable prototype is finally achieved from which the complete system or product can now be developed.
Description : Which of the following is not a software process model? (A) Prototyping (B) Iterative (C) Timeboxing (D) Glassboxing
Last Answer : (D) Glassboxing
Description : The model in which the requirements are implemented by category is (A) Evolutionary Development Model (B) Waterfall Model (C) Prototyping (D) Iterative Enhancement Model
Last Answer : (A) Evolutionary Development Model
Description : Which is not a software life cycle model? Spiral Model Waterfall Model Prototyping Model Capability maturity Model
Last Answer : Capability maturity Model
Description : Which of the following is not included in waterfall model ? (A) Requirement analysis (B) Risk analysis (C) Design (D) Coding
Last Answer : (B) Risk analysis
Description : ............... is a process model that removes defects before they can precipitate serious hazards. (A) Incremental model (B) Spiral model (C) Cleanroom software engineering (D) Agile model
Last Answer : (C) Cleanroom software engineering
Description : A simple way of looking at the spiral life-cycle model is as a waterfall model with each phase proceeded by a) Build-and-fix b) Freezing c) Synchronization d) Testing e) Risk analysis
Last Answer : e) Risk analysis
Description : Requirements can be refined using (A) The waterfall model (B) prototyping model (C) the evolutionary model (D) the spiral model
Last Answer : (B) prototyping model
Description : For a well understood data processing application it is best to use (A) The waterfall model (B) prototyping model (C) the evolutionary model (D) the spiral model
Last Answer : (A) The waterfall model
Description : The software ................. of a program or a computing system is the structure or structures of the system, which comprise software components, the externally visible properties of those components, and the relationships among them. (A) Design (B) Architecture (C) Process (D) Requirement
Last Answer : (B) Architecture
Description : Which process model is also called as classic life cycle model? (A) Waterfall model (B) RAD model (C) Prototyping model (D) Incremental model
Last Answer : (A) Waterfall model
Description : The major shortcoming of waterfall model is (A) the difficulty in accommodating changes after requirement analysis. (B) the difficult in accommodating changes after feasibility analysis. (C) the system testing. (D) the maintenance of system.
Last Answer : (A) the difficulty in accommodating changes after requirement analysis.
Description : Consider f(N) = g(N) + h(N) Where function g is a measure of the cost of getting from the start node to the current node N and h is an estimate of additional cost of getting from the current ... ? (A) A* algorithm (B) AO* algorithm (C) Greedy best first search algorithm (D) Iterative A* algorithm
Last Answer : (C) Greedy best first search algorithm
Description : A computer model of a part design on a CAD system is called which of the following? a.Computer Prototype b.Geometric Prototype c.Solid Prototype d.Virtual Prototype
Last Answer : d.Virtual Prototype
Description : The life cycle can be said to consist of a series of phases. The classical model is referred to as the waterfall model. Which phase may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation
Last Answer : (a) Requirements
Description : Which of the following algorithm design technique is used in the quick sort algorithm? a) Dynamic programming b) Backtracking c) Divide-and-conquer d) Greedy method
Last Answer : Which of the following algorithm design technique is used in the quick sort algorithm? a) Dynamic programming b) Backtracking c) Divide-and-conquer d) Greedy method
Description : In software testing, how the error, fault and failure are related to each other? (A) Error leads to failure but fault is not related to error and failure (B) Fault leads to failure but error is ... Error leads to fault and fault leads to failure (D) Fault leads to error and error leads to failure
Last Answer : (C) Error leads to fault and fault leads to failure
Description : A variable is defined within a block in a body of a function. Which of the following are true? A) It is visible throughout the function. B) It is visible from the point of definition to the end ... visible from the point of definition to the end of the block. D) It is visible throughout the block.
Last Answer : D) It is visible throughout the block.
Description : What is Waterfall Model in Software?
Last Answer : WATERFALL MODEL It is a sequential design process in which progress is seen as flowing steadily downwards.(like waterfall) through the phases of conception,initiation,analysis,design,construction,testing,production/implementation and maintenance.
Description : The following three golden rules: (i) Place the user in control (ii) Reduce the user’s memory load (iii) Make the interface consistent are for (A) User satisfaction (B) Good interface design (C) Saving system’s resources (D) None of these
Last Answer : (B) Good interface design
Description : In CRC based design, a CRC Team consists of : (a) one or two users representatives (b) several programmers (c) project co-ordinators (d) one or two system analysts Codes : (A) (a) and (c) (B) (a), (b), (c) and (d) (C) (a), (c) and (d) (D) (a), (b) and (d)
Last Answer : Answer: C
Description : Which of the following statement(s) is/are FALSE in the context of Relational DBMS ? I. Views in a database system are important because they help with access control by allowing users to see only a particular subset of the data ... (B) III and IV only (C) I, II and III only (D) II, III and IV only
Last Answer : (D) II, III and IV only
Description : List any two differences betweenIncremental model and Spiral model in developing complex software projects. -Technology
Last Answer : Incremental model works on the stage-wise development of a complex project that involves real time data whereas Spiral model works on risk analysis of a real time situation.Spiral model is a combination of both Incremental as well as Waterfall method.
Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing ... after system testing. A. Water Fall Model B.V-Model C. Spiral Model D. RAD Model
Last Answer : B.V-Model
Description : Spiral model is a realistic approach to the development of large-scale systems & software. Justify & explain the model?
Last Answer : Ans. There are several advantages of Spiral model that makes it a realistic approach to development of large-scale systems and software, viz: 1) The spiral model promotes quality assurance ... , which can help in identifying and resolving potential problems or errors in the software development.
Description : How does the risk factor affect the spiral model of software development?
Last Answer : Ans:Risk Analysis phase is the most important part of "Spiral Model". In this phase all possible (and available) alternatives, which can help in developing a cost effective project are analyzed ... data and find out possible solution in order to deal with the potential changes in the requirements.
Description : The spiral model of software development (A) Ends with the delivery of the software product (B) Is more chaotic than the incremental model (C) Includes project risks evaluation during each iteration (D) All of the above
Last Answer : (C) Includes project risks evaluation during each iteration
Description : The performance of data communications network depends on .............. A) Number of users B) The hardware and software C) The transmission D) All of the above
Last Answer : D) All of the above
Description : The reasons leading to popularity of client-server systems are: A) More powerful workstations on LANs B) Needed for graphical user interfaces of end users. C) Remove computing load for presentation services from the system managing a shared database resource. D) All
Last Answer : D) All
Description : Which property of the rapid prototype is not important? a) The speed with which it can be developed b) The speed with which it can be modified c) Its ability to determine the client's real needs d) The ... from it, even if they are of the how not to do it' variety e) Its internal structure.
Last Answer : c) Its ability to determine the client’s real needs
Description : Choose the correct sequence to generate prototype a.3D CAD data - CAD solid model - STL file - RP prototype b.CAD solid model - 3D CAD data - RP prototype - STL file c.STL file - 3D CAD data - CAD solid model - RP prototype d.3D CAD data - STL file - CAD solid model - RP prototype
Last Answer : a.3D CAD data - CAD solid model - STL file - RP prototype
Description : What is a model of a proposed product, service, or system? a. Prototyping b. Prototype c Selling prototype d. None of the above
Last Answer : d. None of the above
Description : Dynamic similarity between the model and prototype signifies similarities of a) Motion b) Force c) Length d) None of the above
Last Answer : b) Force
Description : Kinematic similarity between the model and prototype signifies similarities of a) Motion b) Force c) Length d) None of the above
Last Answer : a) Motion
Description : Geometric similarity between the model and prototype signifies similarities of a) Motion b) Force c) Length d) None of the above
Last Answer : c) Length
Description : What is a model of a proposed product, service, or system? a. Prototyping b. Prototype c. Proof‐of‐concept prototype d. Selling prototype
Last Answer : b. Prototype
Description : __________ is software that blocks unauthorized users from connecting to your computer. A. Firewall B. Quick lauch C. OneLogin D. Centrify
Last Answer : A. Firewall
Description : A good software design must have (A) High module coupling, High module cohesion (B) High module coupling, Low module cohesion (C) Low module coupling, High module cohesion (D) Low module coupling, Low module cohesion
Last Answer : (C) Low module coupling, High module cohesion
Description : A software design is highly modular if : (A) cohesion is functional and coupling is data type. (B) cohesion is coincidental and coupling is data type. (C) cohesion is sequential and coupling is content type. (D) cohesion is functional and coupling is stamp type.
Last Answer : (A) cohesion is functional and coupling is data type.
Description : A software design pattern used to enhance the functionality of an object at runtime is: (1) Adapter (2) Decorator (3) Delegation (4) Proxy
Last Answer : Answer: 2
Description : The conceptual model is (A) dependent on hardware. (B) dependent on software. (C) dependent on both hardware and software . (D) independent of both hardware and software.
Last Answer : (D) independent of both hardware and software.
Description : The ................ model is preferred for software development when the requirements are not clear. (A) Rapid Application Development (B) Rational Unified Process (C) Evolutionary Model (D) WaterfallModel
Last Answer : (C) Evolutionary Model
Description : The Prototyping model of software development is: (1) a reasonable approach when requirements are well-defined. (2) a useful approach when a customer cannot define requirements clearly. (3) the ... projects with large development teams. (4) a risky model that rarely produces a meaningful product.
Last Answer : 1
Description : Which layer of OSI reference model is responsible for decomposition of messages and generation of sequence numbers to ensure correct re-composition from end to end of the network? (A) Physical (B) Data-link (C) Transport (D) Application
Last Answer : (C) Transport
Description : Which of the following is true about the static member variable in C++. i) It is initialized to zero when the first object of its class is created. Other initialization is also permitted. ii) It is visible only within ... , ii-True B) ii-False, ii-True C) i-True, ii-False D) i-False, iii-False
Last Answer : B) ii-False, ii-True
Description : Waterfall model is not suitable for ? Small Projects Complex Projects Accommodating change None of Above
Last Answer : Accommodating change
Description : What Is Waterfall Model?
Last Answer : The waterfall model is a sequential software development process, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of Conception, Initiation, Analysis, Design (validation), Construction, Testing and maintenance.
Description : Explain the waterfall model. Explain why it is more advantageous than adhoc methods.
Last Answer : Ans Waterfall Model: 1.The waterfall model is a sequential software development process, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of Conception, Initiation, ... approach. b. Iteration is not required. c. It is widely use because it is easy.