Explain the procedure of profile leveling for construction of road.

1 Answer

Answer :

The operation of taking levels along the center line of any alignment at regular interval is called longitudinal or profile leveling. Along the alignment, spots are marked at regular interval along with the apex points where the alignment changes the direction. Setting the level midway between ends of stretch of road which can be controlled from one point and spot levels are taken on the points on the center line of the alignment. The staff readings and chainage of the points are noted in the field book. The RLs of all the points are calculated and the elevations of all the points are plotted against their chainage to obtain ground profile along the alignment.

image

Related questions

Description : Explain the procedure for profile leveling with neat sketch. 

Last Answer : 1) Let PQR be the given line of section.   2) Mark point at 10 m intervals on this line. 3) Level is set up on a firm ground at a suitable point I1. 4) Temporary adjustment of level is done and B. ... and set up on firm ground at I2 as before. 10) B.S is taken on CP1 and new HI is calculated  

Description : Define fly leveling and profile leveling

Last Answer : Fly Leveling adopted to transfer bench marks from one place to other .In this leveling only FS & BS are taken.  Profile leveling:- The operation in which the object is to determine the ... known distanced apart along a given line to obtained the accurate outline of the surface of the ground 

Description : State the purposes of following methods of leveling. i)Profile leveling, ii)Fly leveling, iii)Check leveling iv)Reciprocal leveling

Last Answer : 1. Profile leveling- To determine the undulation of ground surface along given line for alignment of road, canal or pipe, railway line 2. Fly leveling-It is used to for connecting B.M. to ... is used to find the difference in leveling between two points two point obstructed due to river or pond.

Description : What is meant by profile leveling and cross-sectioning ?

Last Answer : profile leveling : To know the nature of the ground surface the profile leveling is done along the Centre of the road at some regular intervals if required, staff readings may also be taken at points ... surface transverse to the Centre of the road. The length depend upon the nature of the work.

Description : State the important point to be remembered while doing profile leveling.

Last Answer : 1. The chainage of staff stations are continuous from beginning to the end of the section line. 2. Readings of B.S. and F.S. should be taken very accurately with the bubble exactly in ... their width or by offset. 5)All the temporary adjustments at all instrument position shall carefully be done. 

Description : State different types of leveling. Explain any one in brief.

Last Answer : Types of Levelling  1. Simple Levelling.  2. Differential Levelling.  3. Fly Levelling.  4. Longitudinal or profile leveling.  5. Cross-Section Levelling.  6. Check Levelling.  1. ... B are taken. The difference of these readings gives the difference of level between A and B. 

Description : Explain importance of Bench mark in leveling and state the types of Bench mark. 

Last Answer : Bench marks are fixed points or marks of known RL determined with reference to the datum line. These are very important points which serve as reference points for finding RLs of new points or for conducting ... 2. Permanent bench mark. 3. Arbitrary bench mark. 4. Temporary bench mark.

Description : Write errors in leveling and corresponding precaution

Last Answer : i) Instrument error with respect to bubble tube, leveling staff. 1.If bubble tube is sluggish it may apparently be in the center though the bubble line is not horizontal. Precaution - ... reading. Precaution- Leveling should be properly done by bringing the bubble of bubble tube at Centre.

Description : Define Change point and its necessity in leveling.

Last Answer : Change point : It is the point at which both backsight and foresight readings are taken before and after shifting the level instrument. Necessity of change point in leveling : It is ... observations from single station due to large area, abrupt ground level variation and unavoidable obstruction. 

Description : State sources of error in leveling. 

Last Answer : There are three sources of Error a) Instrumental Error :- Imperfect permanent adjustment Sluggish bubble Faulty focusing tube The erroneous leveling staff b) Refraction Error ( error due ... in manipulation  Mistake in reading the rod   Errors in sighting   Mistakes in recording

Description : Describe instrumental errors in leveling.

Last Answer : The leveling process requires two instruments namely level and staff. The instrumental errors related to these are1. Error due to imperfect permanent adjustment: When the instrument is not in perfect ... the leveling staff may not be perfect. These errors can be neglected for ordinary work.

Description : State under what situations differential leveling and reciprocal leveling is adopted.

Last Answer : 1. Differential leveling is adopted when i. The points are at a great distance apart. ii. The difference of elevation between the points is large. iii. There is obstacle between the points. ... or valley as it is not possible to place the level midway between two points on opposite banks.

Description : Define leveling.

Last Answer : Levelling is an ‘art of determining relative heights or elevations of different points on the earth’s surface so that the same may be represented on a plan or map’. It is essentially a process dealing with the measurements in vertical plane.

Description : Describe in brief profile levelling.

Last Answer : The operation of taking levels along the center line of any alignment at regular interval is called longitudinal or profile levelling. Along the alignment, spots are marked at regular interval ... the points are plotted against their chainage to obtain ground profile along the alignment.

Description : Explain Procedure for chain and compass traversing.

Last Answer : Chain and compass traversing : 1) Reconnaissance of the area to be surveyed is done. 2) Traverse stations are fixed. 3) The F.B and B.B of the traverse are measured by prismatic compass and ... occur when the traverse is plotted. 6) This error is adjusted graphically by using Bowditch Rule'. 

Description : Explain with neat sketch the procedure of radiation method of plane tabling.

Last Answer : 1. The table is set at suitable station e.g. P from where all stations can be sighted and measured. 2. After centering and leveling, mark station P as P' on sheet. 3. Suppose stations A, B, C, and D are ... marked as pa. 5. Similarly station B, C and D are bisected and marked as b, c and d.

Description : Explain with neat sketch the procedure of reciprocal ranging.

Last Answer : Reciprocal ranging / Indirect ranging Procedure: Let A and B be two survey stations. They are not mutually visible due to high ground between them. Let two assistant stands at M1 and N1 as ... and N1 which are nearer to line AB. Repeat same process until points M and N are established. 

Description : Draw sketch and write the procedure for setting offset to the left or right side of suvey line with open cross-staff.

Last Answer : Procedure for setting offset with open cross staff : 1. Keep the ranging rods at point P(fixed on survey line) and at point A1 approximately. 2. The cross staff with stadia rod is fixed ... can be fixed and perpendicular offset AB is said to be set to given survey line PQ in left side.

Description : Describe the procedure of indirect ranging.

Last Answer : Procedure of indirect ranging. 1. If two stations i.e. A and B are not visible, then two intermediate points M1 and N1 are selected such that both stations will be intervisible from it. 2. ... continued till final points M and N are in line with AB, thus, ranging is said to be completed.

Description : State the procedure to find the foot of the perpendicular on the chain line to take the offset. 

Last Answer : Ans: By cross staff 1. The cross staff is held vertically on the chain line where the offset is likely to occur. It is turned until one pair of opposite slits is directed to the ranging rod ( say ... the ranging rod at B. 3. The point P1 vertically under the instruments is required point. 

Description : What is orientation of plane table? State the procedure of any one method of orientation.

Last Answer : Orientation of plane table: It means placing table in parallel positions at all stations (or at successive station) 1. Orientation using trough compass: Here north direction is marked at first station ... rotated till ranging rod at previous station is exactly bisected. The table is then clamped. 

Description : With neat sketch, write the procedure of measurement of fore bearing with compass.

Last Answer : For measuring fore bearing of line AB, i) Place the compass over station A, center and level it.  ii) Looking through eye slit towards object vane, bisect the ranging rod at station ... which coincides with horse hair at observer end. The observed reading is the fore bearing of line AB

Description : Draw conventional symbol for: i. Cutting ii. Road with bridge iii. Orchard iv. river

Last Answer : conventional symbol for: i. Cutting ii. Road with bridge iii. Orchard iv. river

Description : Explain the construction procedure of Bituminous Road.

Last Answer : The construction procedure of bituminous road is summarized as under:  1) Preparation of sub-grade - The existing ground is made clean to remove dust and other unwanted particles using ordinary and ... over thin layer of seal coat followed by necessary compaction as per camber and gradient of road.

Description : Mention the procedure of fly leveling and state the purpose of doing it.

Last Answer : Procedure: 1. Set up the level at a point from where BM is visible and perform temporary adjustments. 2. Position of the level should be approximately midway between the BS and FS stations. 3. ... accuracy of survey. 3. To connect the B.M at any intermediate point of the alignment.

Description : Explain the temporary adjustments of prismatic compass.

Last Answer : Temporary Adjustments of Prismatic Compass 1. Fixing the compass to the tripod The compass is fixed on a tripod by rotating screw head of tripod stand. 2. Centering the compass The prismatic compass ... prism is moved using focusing stud so that readings on graduated ring will be seen clearly. 

Description : Describe with neat sketch, the optical square and explain its principle.

Last Answer : Principal of optical square :- the angle between the first incident ray and the last reflected ray is twice the angle between the two mirrors OR If there are two plane mirrors whose reflecting surfaces ... is 450 while that between the first incident ray and last reflected ray is 900 .  

Description : What are offsets? How are they taken and recorded? Explain with sketch.

Last Answer : Offsets are lateral measurement to the base line. They are Located by judgment if short And by instruments (optical square or cross staff) if long and measured by metallic tape and shown with their chainages on base line

Description : Draw a sketch and explain how to find height of chajja or slab using dumpy level.

Last Answer : Explanation : 1. First the back sight reading is taken on floor level whose RL is known to us; from which RL of instrument axis can be find out by adding RL of BM and BS reading. 2. Now ... staff reading. 4. Finally height of chajja is calculated as RL of slab bottom -  RL of floor top.

Description : Explain temporary adjustment.

Last Answer : 1) Place the telescope parallel to foot screw (fig. a) 2) Bring the bubble at Centre by moving foot screw inward or outward simultaneously. 3) Then turn the telescope through 900 so that it ... 6) Once both positions give centered bubble, leveling of instrument is said to be completed.

Description : Draw sketch and explain method of traversing of plane table surveying. 

Last Answer : Procedure: 1.Set plane table over station A use plumbing fork for transferring station point from ground on sheet. Draw the direction of magnetic meridian with the help of compass. 2. With the ... scale Similarly, the table can be set at other successive station and traverse is completed.

Description : Explain in brief linear measurement using : i) Pacing ii) Digital Tape 

Last Answer : i) Pacing : This method is used only for knowing approximate distance between the objects. In preliminary survey this method can be used for linear measurement. This method consists of counting the ... and compact and measures accurate reading. The maximum measuring length of digital tape is 4.8m 

Description : What is bench mark? State the types of bench mark and explain any one type.

Last Answer : Bench Mark- It is fixed reference point of known or assumed elevation. Types of bench mark1. Great trignometrical survey bench mark 2. Permanent bench mark 3. Arbitrary bench mark 4. Temporary bench ... Karachi are given in catalogue formed by department. They are also known as G.T.S. Bench mark

Description : Draw a neat lebelled sketch of optical square. Explain its working.

Last Answer : Working of optical square1. Optical square works on principle of optical square to set perpendicular offset 2. Keep ranging rods at point B and C as shown in fig. 3. Observe the ... matched each other point D can be marked on ground and distance CD is measured as perpendicular offset.

Description : Explain how will you overcome the obstacles over river during chaining operation.

Last Answer : A) river across the chain line. 1. Suppose AB is the chain line. Two points C & D are selected on this line on opposite banks of the river. 2. At C a perpendicular CE is erected and bisected at F. A perpendicular is ... ) X DF          CH=DF  = (CD/(CG-DF) )X DF        HG=CG-CH

Description : Explain types of bench marks.

Last Answer : Types of bench mark 1.Great trignometrical survey bench marka. These are the bench marks established with very high precision at regular intervals by survey of India Dept. all over the country . Their ... point. Such point should be on a permanent object so that next day it is easily identified.

Description : Explain in detail classification of survey. 

Last Answer : A. primary classification-  1. Plane surveying: In this survey curvature of the earth is not taken in to consideration.  2. Geodetic surveying: In this survey curvature of the earth is taken ... 3. Based on nature of field:  1.Land surveying  2.Marine surveying  3.Astronomical surveying

Description : Explain errors occurred due to manipulation and sighting in plane tabling.

Last Answer : i) The board not being horizontal- This error affects chiefly the measurement of vertical angles. ii) The table not being accurately centered. The plotted position of the occupied station not ... and correct any displacement. v) The defective sighting- The object not being correctly sighted.

Description : Explain the radiation method of plane table survey with neat sketch. 

Last Answer : This method is used when all the points to be plotted are visible from single instrument station. Steps are: 1. Select a suitable point P on the ground such that all the details are visible from it. 2. Center and ... , pc, pd, pe respectively. Join a, b, c, d, and e to give the outline.

Description : Explain four types of meridians. 

Last Answer : 1. True meridian: -The line which is passing through geographical north or south pole and given point on the surface of earth is called as true meridian. 2. Magnetic meridian:-The direction indicated ... particular zone. These lines are termed as grid lines and the centre line as the grid meridian.

Description : Explain dip of magnetic needle with neat sketch. 

Last Answer : i) The inclination of the magnetic needle with the horizontal is called as magnetic dip of the needle. ii) Ordinary needle if perfectly balanced on pivot, remains in horizontal position. But when the needle ... sliding weight is attached on the side of the needle which is at higher position.  

Description : Explain reciprocal ranging with neat sketch. 

Last Answer : Reciprocal ranging is done when ends of survey line are not intervisible due to hill intervening or ends of survey line are at far distance apart. Step wise procedure reciprocal ranging: 1. Let A and B be ... chained. 8. This method can also be used in ranging a line across a valley.  

Description : Explain Direct method of chaining on sloping ground with neat skeetch. 

Last Answer : While chaining on sloping ground, the horizontal distances can be computed by direct method i.e. By stepping. By stepping: It consist in measuring the distance in small horizontal lengths (e.g.L1). Let ... is continued in the correct line with point B. Then length of line AB=L1 +L2 +L3+L4

Description : Explain ‘Declination of Magnetic needle’ and types of declination. 

Last Answer : Ans: The magnetic meridian at a place does not coincide with the true meridian at that place. The horizontal angle made by the magnetic meridian with the true meridian is called magnetic declination'. ... in others it points to the west of the true meridian called as West declination'

Description : Explain Graphical adjustment of closing error in a closed traverse.  

Last Answer : Step: 1) Draw a horizontal line AA1 equal to the length of perimeter of the traverse to a suitable scale. 2) Mark the distances AB,BC,CD, etc on the line as per their lengths. 3) Draw a perpendicular ... errors 7) Join the the new points which gives the closed traversed. A, B, C, D and A.

Description : Explain ‘Intersection Method’ of plane table surveying with neat sketch. Also give situation when intersection method is used.

Last Answer : 1. Lay out a base line AB and measure it and Plot a distance ab' on sheet using any scale. 2.Set up instrument at A' with a' over A' 3.Orient the table by placing alidade ... the case of the survey of mountainous country. 5. The only linear measurement required is that of a base line.

Description : Explain Fly Levelling with neat sketch. State situation under which fly levelling is needed.

Last Answer : Ans: When DifferentialLevelling is done in order to connect a bench mark to the starting point of the alignment of any project, it is called as fly levelling. Fly levelling is also done to connect ...  ii)if distance is more between two points.  iii)if there obstacles between the two points.  

Description : Explain Orientation of plane table by Back-sighting Method.

Last Answer : Ans:- The method of setting up the plane table at each of the successive stations parallel to the position it occupied at the starting station is known as an Orientation. Orientation must be done when ... and bisection of the ranging rod at a are perfect then orientation is said to perfect.  

Description : Explain principle of chain surveying 

Last Answer : 1) Principle of chain surveying is triangulation 2) Triangulation consists of frame work of triangles. The whole area is divided into network of triangles. 3) A triangle is the only simple plane ... to be adopted depends upon the shape & configuration of the ground & the natural obstacles. 

Description : Explain indirect ranging with neat sketch

Last Answer : Step wise procedure indirect ranging i.e. reciprocal ranging- Let A and B be the two station with rising ground or a hill intervening between them even i)Select any two intermediate station say M1 and N1 ... there position will be changed until finally they are both on the line A B exactly.