Draw conventional symbol for: i. Cutting ii. Road with bridge iii. Orchard iv. river

1 Answer

Answer :

image

conventional symbol for: i. Cutting ii. Road with bridge iii. Orchard iv. river

Related questions

Description : Draw Conventional symbol for i) Embankment ii) Pond or Lake iii) Tunnel iv) Compound Wall

Last Answer : Conventional symbol for i) Embankment ii) Pond or Lake iii) Tunnel iv) Compound Wall

Description : Draw conventional symbols for i) Compound wall ii) Pucca Building iii) Cutting iv) Embankment

Last Answer : i) Compound wall ii) Pucca Building iii) Cutting iv) Embankment

Description : State the purposes of following methods of leveling. i)Profile leveling, ii)Fly leveling, iii)Check leveling iv)Reciprocal leveling

Last Answer : 1. Profile leveling- To determine the undulation of ground surface along given line for alignment of road, canal or pipe, railway line 2. Fly leveling-It is used to for connecting B.M. to ... is used to find the difference in leveling between two points two point obstructed due to river or pond.

Description : Define the terms i) Fore Bearing, ii) Open traverse, iii) Closing error, iv) Reduced bearing

Last Answer : i) Fore bearing : The bearing observed in the direction of progress of survey in clockwise manner is called fore bearing  ii) Open traverse : When the first and last survey lines does ... north or south direction in clockwise or anticlockwise manner is known as reduced or quadrantal bearing. 

Description : Write the functions of the following components of prismatic compass i) Prism, ii) Lifting pin, iii) Prism cap, iv) Agate cap

Last Answer : i) Prism: Reading printed on horizontal face of compass ring can be read from vertical position  ii) Lifting pin: When the instrument not in use the sight vane passes against the lifting pin which lift ... piece of hard glass provided on top of pivoted point, to reduce wear and tear of the point

Description : Defines the terms : i) Survey Station ii) Survey Line iii)Offset iv)Triangulation 

Last Answer : i) Survey Station : It is the point on ground from which various observations are taken around it. ii) Survey Line : It is the straight line joining two successive survey stations ... iv)Triangulation : The frame work consist of number of connected well conditional triangle is called Triangulation.

Description : Write the code of signals used in ranging with respect to : i) Correct position ii) Fix the ranging rod iii) Vertical position of ranging rod iv) Move slowly to left of observer 

Last Answer : i) Correct position : Both hands above Head and then Brought Down ii) Fix the ranging rod : Both Arms extended forward horizontally and the hands depressed briskly iii) Vertical position of ranging rod : 1 ... and moved to the Left iv) Move slowly to left of observer : Slow sweeps with Left Hand

Description : What are the objectives of following one each. i)Topographic Survey ii)Cadastral Survey iii)Engineering Survey iv)Mine Survey

Last Answer : i) Topographic Survey : To determine natural features like river, streams , lakes , hills etc and artificial features like roads , railways , canal , town and villages .  ii) Cadastral ... Mine Survey :To explore mineral deposits and to guide tunneling and other operations associated with mining. 

Description : Define: i) Level Line, ii) Horizontal Line, iii) Vertical Line iv) Bench Mark. 

Last Answer : j) Level Line: It is line lying in a level surface; it is therefore, normal to the plumb line at all points. ii) Horizontal Line: It is a straight line tangential to the level line at a ... RL determined with reference to the datum line. They serve as reference points for finding RL of new points. 

Description : State the uses of following instruments in survey: i)Cross staff ii) Chain iii) Pegs iv) Arrows

Last Answer : i) Cross-Staff: To set up perpendicular or right angle to given chain line OR to find foot of perpendicular from given object to a chain line. ii) Chain: Chains are used for measuring distances. iii) ... on survey lines. iv) Arrows : They are used to mark the end of each chain during chaining. 

Description : Write the uses of following survey instruments i) Ranging Rod ii) Pegs iii) Cross-staff iv) Plumb bob

Last Answer : i) Ranging Rod : Ranging rod are used for ranging. ii) Pegs : Pegs are used for marking the positions of stations or terminals points of survey lines. iii) Cross-staff : It is used ... It is also used for accurate centering of the surveying instruments like theodolite, compass, plane table etc. 

Description : Define the following terms: (i) Level surface {ii) Datum line (iii) Reduced level (iv) Axis of telescope

Last Answer : i)Level Surface : Any surface is parallel to mean spheroidal surface of earth is said to be a level surface. The water surface of still lake is also considered to be level surface. ii) ... an imaginary line passing through the optical Centre of object glass and optical Centre of the eye piece.

Description : Find the back bearing of the following lines having fore bearing as given below: (i) PQ = N 55° 0' E (ii) EF == 280° 0' (iii) CD = S 58° 30' W (iv) OM= 180° 0'

Last Answer : i) F.B OF PQ = N 55°0 ’ E  B.B Of PQ = S 55°0 ’W  ii) F.B. Of EF = 280°0 ’   B.B OF EF = F.B -180°= 280°0 ’ -180° = 100°0 ’  iii) F.B OF CD = S 58°30’W  B.B OF CD = N 58°30’ E  iv) F.B OF GH = 180°  B.B OF GH = F.B -180°=180°-180°= 0°

Description : Define the following: (i) Height of instrument (i) Back sight (iii) Fore sight (iv) Axis of bubble tube

Last Answer : i. Height of instrument: It is the reduced level of line of collimation when the leveling instrument is properly leveled. It is obtained by adding the BS reading to RL of bench mark or change point on which the ... when the bubble is at the center of its run i.e. at middle point of the tube.

Description : Draw symbol of (i) Tray Dryer (ii) Plate column (iii) Packed column (iv) Jaw crusher (v) Strirrer (vi) Ball mill.

Last Answer : i)Tray dryer:   ii)Plate column:    iii)Packed column:   iv) Jaw crusher:   v) Stirrer:   vi) Ball mill  

Description : Draw the symbol of i) Iron core inductor ii) variable capacitor iii) resistor iv) Ferrite core inductor

Last Answer :  Iron core inductor:  Ferrite core inductor:  

Description : Explain the procedure of profile leveling for construction of road.

Last Answer : The operation of taking levels along the center line of any alignment at regular interval is called longitudinal or profile leveling. Along the alignment, spots are marked at regular interval along ... points are plotted against their chainage to obtain ground profile along the alignment.

Description : Draw a sketch and explain how to find height of chajja or slab using dumpy level.

Last Answer : Explanation : 1. First the back sight reading is taken on floor level whose RL is known to us; from which RL of instrument axis can be find out by adding RL of BM and BS reading. 2. Now ... staff reading. 4. Finally height of chajja is calculated as RL of slab bottom -  RL of floor top.

Description : Draw sketch and explain method of traversing of plane table surveying. 

Last Answer : Procedure: 1.Set plane table over station A use plumbing fork for transferring station point from ground on sheet. Draw the direction of magnetic meridian with the help of compass. 2. With the ... scale Similarly, the table can be set at other successive station and traverse is completed.

Description : Draw sketch and write the procedure for setting offset to the left or right side of suvey line with open cross-staff.

Last Answer : Procedure for setting offset with open cross staff : 1. Keep the ranging rods at point P(fixed on survey line) and at point A1 approximately. 2. The cross staff with stadia rod is fixed ... can be fixed and perpendicular offset AB is said to be set to given survey line PQ in left side.

Description : Draw a neat lebelled sketch of optical square. Explain its working.

Last Answer : Working of optical square1. Optical square works on principle of optical square to set perpendicular offset 2. Keep ranging rods at point B and C as shown in fig. 3. Observe the ... matched each other point D can be marked on ground and distance CD is measured as perpendicular offset.

Description : Draw a neat sketch of an arrow with dimensions.

Last Answer :  neat sketch of an arrow with dimensions

Description : Draw a neat labeled sketch of 30m chain.

Last Answer : neat labeled sketch of 30m chain

Description : Draw a neat sketch of optical square. Explain its working.

Last Answer : Optical Square: Working: The optical square consists of circular box 50 mm in diameter, 12.5 mm in depth. The box has three slits as A,B, and C. bb' is horizon glass, half silvered i.e ... the point on the chain line where the offset can be dropped to meet point J as shown in fig.  

Description : Draw a neat sketch of prismatic compass and label its component parts

Last Answer : Sketch of prismatic compass and label its component parts

Description : Draw the sketch of chain triangulation and label different lines.

Last Answer : AB – Base line AC, CD, DE, AE, EB - main survey lines DD’ – Check line. ab – Tie line.

Description : Draw a "well labelled diagram of 30 m metric chain & state the function of swivel joint & oval rings.

Last Answer : Swivel joint: To turn the handle without twisting the chain. Oval ring: To provide flexibility and fold the chain.

Description : Draw labeled sketch of prismatic compass.

Last Answer : Sketch of prismatic compass :

Description : Draw sketch of optical square and state its principle.

Last Answer : The optical square is an instrument used to set perpendicular offset on the chain line. The optical square works on the principle of optics. Principle of optical square: The angle between the incident ray and reflected ray is twice the angle between mirrors.

Description : Explain how will you overcome the obstacles over river during chaining operation.

Last Answer : A) river across the chain line. 1. Suppose AB is the chain line. Two points C & D are selected on this line on opposite banks of the river. 2. At C a perpendicular CE is erected and bisected at F. A perpendicular is ... ) X DF          CH=DF  = (CD/(CG-DF) )X DF        HG=CG-CH

Description : Explain in brief linear measurement using : i) Pacing ii) Digital Tape 

Last Answer : i) Pacing : This method is used only for knowing approximate distance between the objects. In preliminary survey this method can be used for linear measurement. This method consists of counting the ... and compact and measures accurate reading. The maximum measuring length of digital tape is 4.8m 

Description : Define : i) Traversing ii) Magnetic Meridian

Last Answer : i) Traversing : Traversing is the series of survey lines connecting successive established traverse stations along the route of survey  ii) Magnetic Meridian : The direction indicated by ... and properly balanced Magnetic needle unaffected by local attractive force is called magnetic meridian.

Description : State the classification of surveys based on i) The nature of the field of survey. ii) The object of survey. 

Last Answer : i)The nature of the field of survey.  1.Land surveying.  2.Marine surveying or Hydrographic surveying.  3.Astronomical surveying.  ii) The object of survey. 1.Geological surveying. 2.Mine surveying. 3.Archaeological surveying. 4. Military surveying. 5. Engineeringsurveying.

Description : Define: i) Mean sea level, ii) Station point. 

Last Answer : i) M.S.L: Mean sea level is the average height of the sea for all stages of tides. It is determined by averaging the hourly tide heights over a long period of 19 years at a place.  ii) Station ... is a point which is to be established at a given elevation or it is a point where the Staff is held 

Description : Define: i) W.C.B. ii) Reduced Bearing

Last Answer : i)Whole circle bearing: The bearing measures only in the clockwise direction from meridian or north direction is known as whole circle bearing.   ii) Reduced bearing: The bearing measured ... north or south direction in clockwise or anticlockwise manner is known as reduced or quadrant bearing 

Description : Define: i) Open Traverse ii) Closed Traverse. 

Last Answer : i) Open traverse: When the first and last survey lines does not meets at common point and hence does not form a closed polygon, then it is said to be open traverse.  ii) Closed Traverse: When last and first survey stations meet at common point, traverse is called as closed traverse.

Description : Explain in brief linear measurements using: {i) Chaining (ii) Digital Tape

Last Answer : i. Chaining:  a. Linear measurement with chain carried out by two chainmen-Leader and follower.  b. The follower keeps the chain handle at starting station point, holds firmly it and directs the ... is at right spot, press the button and tape measures, calculates and displays distance on screen.

Description : Define: (i) Long offset (ii) Short offset

Last Answer : i. Long offset: The offset whose length is more than 15 m. ii. Short offset: The offset whose length is less than or equal to 15 m.

Description : Define: (i) True meridian (ii) Magnetic meridian

Last Answer : i. True meridian: It is line of intersection of plane passing through North Pole, South Pole and point under consideration.  ii. Magnetic meridian: Magnetic meridian at point is direction shown by freely suspended magnetic needle at that point.

Description : Describe in brief with neat sketch: i) Base line ii) Check line

Last Answer : i) Base line:  Base line is generally the longest line running roughly through the middle of the area. It is laid on a level ground as far as possible. The whole frame work is built upon this line. ... on the opposite side or a line joining some fixed point on any two sides of the triangle. 

Description : The length of line measured with a chain was found to be 250m. Calculate the true length of line if i) The length was measured with 30 m chain and the chain was 10cm too long and ii) The length of chain was 30 m in the beginning and 30.10 m at the end of the work. 

Last Answer : Given Data: L = 30 m Measured Length = 250 m Solution: Case i) The length was measured with 30 m chain and the chain was 10cm too long L' = 30 + 0.1 = 30.1 m Correct Distance = (L'/L) x Measured Length ... = 30.05 m Correct Distance = (L'/L) x Measured Length  = (30.05/30) x 250  = 250.42 m

Description : Which of the following is/ are a method of propagation? I. Cutting II. Layering III. Grafting IV. Inarching V. Budding Correct code is - a. I, II, and III only b. II, III and IV only c. III, IV and V only d. I, II, III, IV and V

Last Answer : d. I, II, III, IV and V

Description : Write the suitable cutter for carrying following operations on milling machine (i) Gear Tooth (ii) Parting off (iii) Keyway (iv) V-grooves (v) Rounding of corner (vi) Cutting of narrow slot and groove

Last Answer : (i) Gear Tooth : Form milling cutter, Cylindrical type or End mill type, Gear cutter. (ii) Parting off: Slitting Cutter (iii) Keyway : Staggered teeth side milling cutter, End mill cutter, key ... milling cutter. Selection of a cutter depends upon type and size of slot or groove to be produced. 

Description : Write type of chip formed with following factors. (i) High rake angle (ii) High cutting speed (iii) Small depth of cut (iv) Low cutting speed (v) Large depth of cut (vi) Low rake angle

Last Answer : (i) High rake angle : Continuous chips (ii) High cutting speed : Continuous chips (iii) Small depth of cut : Continuous chips (iv) Low cutting speed :Continuous chips with built up edge (v) ... cut : Continuous chips with built up edge (vi) Low rake angle :Continuous chips with built up edge

Description : The remedies to soil erosion are : I. Contour bunding II. Regulation of land use III. Cutting of trees IV. Allowing grazing of animals (1) I, III (2) I, II (3) III, IV (4) II, III

Last Answer :  I, II

Description : Draw symbol & V-I characteristics of (i) LASCR (ii) DIAC (iii) TRIAC

Last Answer : (i) LASCR:  (ii) DIAC:  (iii) TRIAC: 

Description : Quantity is not a part of the weld symbol (i)Dark circle (ii) Open circle (iii) Angle of weld (iv)Starting and stopping allowance for welding

Last Answer : (iv)Starting and stopping allowance for welding

Description : Term which is not a part of the weld symbol (i) Tail (ii) Arrow (iii) Temperature of welding (iv) None

Last Answer : (iii) Temperature of welding

Description : Quantity which is not a part of the weld symbol (i)Length of welding (ii) Weld is made in the welding shop (iii) Welding is on both sides (iv) Machine used in welding

Last Answer : (iv) Machine used in welding

Description : Different parts of a weld symbol are (i) Arrow, center line and back part (ii) Arrow, body line and length (iii) Arrow, body line and tail (iv)None

Last Answer : (iii) Arrow, body line and tail