Explain four Environmental design (ED) strategies for building construction.

1 Answer

Answer :

1. Passive Sustainable Design. Passive strategies, such as considering sun orientation and climate when siting and being thoughtful about window placement and operation, are used to best manage daylighting and natural ventilation and go a long way in reducing energy requirements for the building. In certain climates, thermal mass techniques can be used to harness solar energy. In such cases, thick walls absorb heat from the sun during the day and release it into the building at night. 


2. Active Sustainable Design. Architects consult with mechanical and electrical engineers to implement high-efficiency electrical, plumbing, HVAC, and other systems, which are designed to have small environmental footprints. 


3. Renewable Energy Systems. Renewable energy systems, including those that harness solar and wind energy, are also great options for some buildings. These systems are often used in conjunction with passive design strategies 


4. Green Building Materials and Finishes. By making it a priority to purchase steel, lumber, concrete, and finishing materials, such as carpet and furnishings, from companies that use environmentally responsible manufacturing techniques or recycled materials, architects up the ante on sustainability. 


5. Native Landscaping. Landscaping choices can make a big impact in civic building water consumption. By using trees, plants, and grasses that are native to the area, architects can greatly reduce irrigation needs. Landscaping can also be used as part of a passive energy strategy. By planting trees that shade the roof and windows during the hottest time of the day, solar heat gain inside the building can be reduced. 


6. Stormwater Management. When rain falls on an untouched site, the water that doesn’t evaporate absorbs back into the ground, replenishing the natural water table. However, when a building is placed on the site, along with parking lots, sidewalks, access roads, and other hardscaping, rainfall behaves differently. The water runs off these surfaces and into storm drains. By implementing stormwater management strategies, such as pervious pavement that helps to reduce runoff and retention ponds that capture runoff and slowly release water back into the ground, the negative environmental impact of buildings can be reduced.


OR

1. Site selection

2. Architectural design for sustainability.

3. Indoor environmental quality

4. Building energy use- mechanical systems

5. Building lighting, equipment, energy management and utilities

6. Materials and resources

7. Construction

8. Commissioning


Related questions

Description : Explain environmental laws for controlling pollution

Last Answer : 1. The Environment (Protection) Act, 1986 - The Environment (Protection) Act, 1986 authorizes the central government to protect and improve environmental quality, control and reduce pollution from ... sources with the objective of maintaining the ambient air quality standards in respect of noise. 

Description : Explain the necessity of environmental audits.

Last Answer : 1) To serve to achieve compliance standards and establish report with regulatory bodies. 2) To review the implementations of policies. 3) To identify liabilities to review management ... 10)To assess compliance with the regulatory requirements 11)To pace environmental information to public.

Description : State the steps involved in Environmental Impact Assessment process.

Last Answer : EIA process 1. Screening - It is the first key decision of EIA process. The purpose of screening is to determine whether a proposal require an EIA or not. 2. Initial environmental ... Both result in a statement of facts, which certifies that practice is in accordance with standard procedure.

Description : State different types of Environmental Audits. 

Last Answer : Basic types of Environmental Audit - 1. Objective based type - it is based on assessment of any activity, its scope and objectives. So based on objective environmental audit is again classified as ... ii. Independent external audit iii. Internal environmental audit iv. Third party audit.

Description : Define air pollution and environmental pollution.

Last Answer : Air pollution - It is an atmospheric condition in which certain substance are present in concentration which can cause undesirable effects on humans and environment.  OR It is a contamination of air by ... air, water and soil which can cause harmful effects on various forms of life or property. 

Description : Explain benefits to the school after getting IGBC green rating certification for school building.

Last Answer : The benefits to the schools can be broadly categorized under performance, pedagogy, community and responsibility.  1. Performance (student and building performance) - fresh air, daylight, improved ... benefits include health & wellbeing of children, enhanced air quality and excellent day lighting. 

Description : Explain the principles of green building used in educational building.

Last Answer : National institute of building sciences defines six fundamental principles -  1. Optimize site potential - Whether designing a new building or retrofitting an existing building, site design must ... toxic chemicals and cleaners to maintain and are cost effective and reduce life cycle costs.

Description : Explain the concept of green building.

Last Answer : 1. A green building in incorporates environmental conservation into every stage of the building construction and focuses on the decision, construction, operation and maintenance phase. 2. In ... also stress on water conservation by implementing more efficient water delivery and recycling system. 

Description : Explain the role of HVAC system in green building.

Last Answer : 1. Green energy conservation, indoor air quality and comfort are among the core green building issues encompassed by heating, air-conditioning and ventilation design. 2. The interrelated system can be ... home, heating and cooling equipment can be smaller, less costly and of less complicated. 

Description : Explain about any six green building materials.

Last Answer : 1. Bamboo Bamboo is one of the most common multipurpose and durable materials used in construction. These trees grow faster irrespective of climatic conditions, so it makes it economical as well.  ... 's waterproof and flame retardant and used to build anything you would normally build with wood. 

Description : State the principle of green building.

Last Answer : 1) Sustainable Siting-This approach optimizes land use and development to reduce adverse impacts and minimize the building's ecological footprint. 2) Energy Efficiency-This technique ... , daylighting, environmental tobacco smoke control, and protecting indoor air quality during construction.

Description : Explain in details the need of energy conservation.

Last Answer : 1. As the source of energy are limited it is getting more difficult to recycle and reuse. Hence need for energy conservation techniques to deal with energy insufficiency. 2. Non- ... may lead to better development of country by saving financial investment in production of unnecessary energy.

Description : Explain the salient provisions used in IGBC. 

Last Answer : 1) The Indian Green Building Council (IGBC), part of the Confederation of Indian Industry (CII) was formed in the year 2001. The vision of the council is, "To enable a ... , World Green Building Council, bilateral multi-lateral agencies in promoting green building concepts in the country.

Description : State the benefits of EIA to environment.

Last Answer : 1. It provide information for decision making on the environmental consequences of proposed action. 2. It improves the environmental design of the proposal. 3. It Ensure that resources are used ... conditions for implementing the proposal. 5. It helps to protect human health and provide safety. 

Description : Differentiate between renewable and non-renewable energy sources. 

Last Answer : Sr no. Renewable energy sources  Non-renewable energy sources 1 Energy sources that can be reused called renewable energy sources. Energy sources that can't be reused or nearly impossible ... Examples - solar energy, water energy etc. Example - nuclear energy, coal energy.

Description : State the limitations of EIA

Last Answer : 1) It should be undertaken at project level but it is undertaken at policy and planning level. 2) Project alternatives are limited. 3) There is lack of comprehensive environment information ... predicted adverse effect on the environment might lead to strict conditions of being imposed to avoid.

Description : Describe the measures to reduce noise pollution.

Last Answer : 1. Reduction in sources of noise - sources of noise pollution like heavy vehicles and old vehicles may not allowed to ply in the populated areas. 2. Noise making machines should be ... at various social functions. Unnecessary horn blowing should be restricted especially in vehicle - congested areas.

Description : Describe the measures to reduce soil pollution.

Last Answer : 1. By minimizing the generation of solid waste. 2. By reusing and recycling of solid waste such as - paper, metal parts, plastics and glass materials etc. 3. By employing proper ... liquid pollutants. 5. Faulty sanitation practices should be improved. 6. Soil erosion should be prevented.

Description : List out various renewable energy sources

Last Answer : 1. Solar energy 2. Wind energy 3. Ocean energy 4. Hydro energy 5. Biomass energy 

Description : Define LEED criteria.

Last Answer : Leadership in Energy and Environmental Design (LEED) is one of the most popular green building certification programs used worldwide. Developed by the non-profit U.S. Green Building ... that aims to help building owners and operators be environmentally responsible and use resources efficiently.

Description : List renewable energy resources.

Last Answer : 1. Solar energy 2. Wind energy 3. Ocean energy 4. Hydro energy 5. Biomass energy

Description : Strategic drift is…. A. When strategies progressively fail to address the environmental dynamics, and performance deteriorates. B. Mismatch between Vision Statement and Value Statement C. Mismatch between Vision Statement and Mission Statement D. Mismatch between Mission Statement and Resources

Last Answer : When strategies progressively fail to address the environmental dynamics, and performance deteriorates.

Description : Strategic drift is…. A. When strategies progressively fail to address the environmental dynamics, and performance deteriorates. B. Mismatch between Vision Statement and Value Statement C. Mismatch between Vision Statement and Mission Statement D. Mismatch between Mission Statement and Resources

Last Answer : When strategies progressively fail to address the environmental dynamics, and performance deteriorates.

Description : ____________ is the practice of adopting policies and developing strategies that both sustain the environment and produces profits for the company 1. Environmentalism 2. Environmental sustainability 3. Consumerism 4. Consumer accountability 5. None of these

Last Answer : Environmental sustainability

Description : Which of the following is not a component of a marketing plan? A)Environmental analysis B)Marketing strategies C)Marketing advantages D)Executive summary E)Marketing implementation

Last Answer : C)Marketing advantages

Description : The total agricultural land in a village is 1200 hectares. This is distributed among 320 families who form four groups in the following pattern. It is assumed that the land is distributed equally within each group. Identify the group of small ... B 180 300 C 30 300 D 10 300 (1) A (2) B (3) C (4) D

Last Answer : B 180 300

Description : Describe the scope of construction material in environmental engineering. 

Last Answer : The goal of environmental engineering is to ensure the community development and the sensible use of water, land and air resources to make them sustainable. This goal is achieved by managing ... , artificial sand , waterproofing and damp proofing material of required quality and quantity is used.

Description : Inquiries directed towards those charged with governance may most likely a. Relate to their activities concerning the design, and effectiveness of the entity's internal control and ... the auditor in evaluating the appropriateness of the selection and application of certain accounting policies

Last Answer : Help the auditor understand the environment in which the financial statements are prepared.

Description : Discuss the various strategies of design. Which design strategy is most popular and practical?

Last Answer : Ans The most commonly used software design strategy involved decomposing the design into functional components with system state information held in a shared data area. The design strategies are: ... oriented design, the system state is decentralized and each object manages is own state information

Description : The school or college building needs a calm surrounding to avoid Options: A) environmental stress B) competing stimulus C) subjective stress D) none of these

Last Answer : B) competing stimulus

Description : Explain the types of probable cause of non-structural cracks observed in building construction along with preventive measures for any one of crack. 

Last Answer : Cause of cracks:   Cause # 1. Movement Due To Creep: Creep of a material is defined as the property due to which the material continues to deform with time under sustained stress. ... contraction and slip joints at appropriate location. Painting top roof with reflective finish such as white wash.

Description : Explain the causes of non – structural cracks in building construction and remedial measures.

Last Answer : The important causes responsible for cracks in building are : 1. Due to movement of ground. 2. Due to temperature variation. 3. Due to moisture changes. 4. Due to effect of ... be good workmanship. 6. Uneven settlement of foundation should be avoided by resting foundation on hard strata.

Description : Standard design reference for environmental noise temperature. A. 300 K B. 290 K C. 32 ˚F D. 212˚F

Last Answer : B. 290 K

Description : Make a list of four strategies that were planned for Mission Tiger Hill.

Last Answer : Make a list of four strategies that were planned for Mission Tiger Hill.

Description : (A) MENTION ANY FOUR STRATEGIES ADOPTED BY FLOWERING PLANTS TO PREVENT SELF-POLLINATION. (B) DEFINE THE TERM EMASCULATION.

Last Answer : ANS.(a) (i) SELF INCOMPATIBILITY (ii) PRODUCTION OF UNICELLULAR FLOWERS (iii) ANTHERS AND STIGMA ARE PLACED AT DIFFERENT POSITIONS. (iv) MATURATION OF ANTHER AND STIGMA IS NOT ... EMASCULATION: REMOVAL OF ANTHER BEFORE MATURITY SO AS TO ENSURE CROSS POLLINATION IN SELF POLLINATING FLOWERS.

Description : Will rain water damage a building under construction?

Last Answer : Often, yes, if you do it wrong. It's usually not a problem if the bones of the building get a bit wet before the roof goes on; things dry out easily before you install insulation and ... buildings are all metal, glass and concrete until the exterior is done, so even less problems with water.

Description : Help with very basic construction, generalized building code info?

Last Answer : It seems to me she should have obtained a building permit before beginning, posted in full view. She should have submitted a set of plans to the appropriate engineering dept to get an approval to ... on what unbalanced fill is. http://www.doityourself.com/forum/archive/index.php/t-308617.html

Description : Hello, can the building authority allow us to build a family house on my land where, thanks to the zoning plan, only construction for sports purposes was created? We already have an area on the site ... in the zoning plan and family houses are happily being built there, can we get an exception too?

Last Answer : It all depends on the building authority. In my opinion, the change of the zoning plan should be settled before the family houses are built there.

Description : Building a bridge needs careful planning. Think about what goes on before the actual construction begins.

Last Answer : Building a bridge needs careful planning. Think about what goes on before the actual construction begins.

Description : If a person is building a new home the government agency responsible for issuing a building permit and inspecting the construction to ensure it complies with the building code is the?

Last Answer : Feel Free to Answer

Description : What type of angle do construction workers use when building to make sure that the walls and floors of a building are perpendicular?

Last Answer : They use a right angle!

Description : Construction and Building Inspector?

Last Answer : Construction and building inspectors are employed by governmentoffices and companies to approve homes, buildings, streets, sewersystems, bridges, and highways for compliance with building andzoning ... safety, and electrical systems.There are also inspectors that specialize in homes, Plumbi

Description : Can private individuals obtain construction loans for remodeling or building?

Last Answer : Remodeling loans are based, generally, on the equity in the property. A remodeling loan is usually a second mortgage. Loans for building, depend on what is being built. An individual who owns the land ... a home, provided that his/her credit score and income:debt ratio is acceptable by the lender.

Description : Why are you building a simple deck construction?

Last Answer : To build a deck all you need is a few dozen good strong men and enough money to pay for them all because they sure won't work for you for free you know.

Description : What are some companies that specialize in steel building construction?

Last Answer : It depends on the area that you live in as to which companies you have available to choose from that specialize in steel building construction. metalbuildingdepot.com offers online ordering.

Description : Who defined investment as "the construction of a new capital asset like machinery or factory building"? (1) Hansen (2) J.M. Keynes (3) Harrod (4) J.R. Hicks

Last Answer : (2) J.M. Keynes Explanation: Investment expenditure refers to the creation of new assets i.e. an addition to the stock of existing capital assets. According to Keynes investment demand depends upon ... the rate of interest (IR). Investment demand decreases with the increase in the rate of interest.

Description : The compound of silicon used in building construction is

Last Answer : sand.

Description : The steps need to be taken for any risk natural or man-made disaster a. Proper building construction b. A well planned c. Awareness among the stakeholders d. All of the above

Last Answer : d. All of the above

Description : While estimating the qualities for the construction of a building, the correct metric unit is (A) Metre for length (B) Cubic metre for area (C) Square metres for volume (D) Litre for capacity

Last Answer : (D) Litre for capacity

Description : Consider the following activities in a building construction: 1. Concreting of roof slabs 2. Brick-jelly lime concrete terracing 3. Erection of form work for slab 4. Construction of parapet wall in terrace The correct sequence of these ... (B) 3, 1, 4, 2 (C) 3, 1, 2, 4 (D) 1, 3, 4, 2

Last Answer : (C) 3, 1, 2, 4