what does 5/12 estimate to?

1 Answer

Answer :

0.4167

Related questions

Description : A project activity has several components as indicated below; S.  No. Activity Preceded by Duration (in  Weeks) 1 A - 8 2 B A 6 3 C A 12 4 D B 4 5 E D 5 6 F B 12 7 G E& F ... H 5 10 J I & G 6 d. Prepare a PERT chart, estimate the duration of the project and identify the  critical path.

Last Answer : PERT Diagram based on Activity on Arrow  .  E  D 5 G B 5 9 J, 6 A 6 F,12 I ,5 8 c 12 H 8 OR  PERT Diagram based on Activity on Node …………………….6 marks a. Critical Path: A-B-F-G-J …………………….1 mark  b. Estimated Project Duration: 41 weeks

Description : I'm curious. What would you estimate to be the average price for a 12 pack of Coca Cola where you live? Include the recycling fee if any.

Last Answer : $4 for a 12 pack of any of the Coke products (suburban Atlanta) at Kroger.

Description : Why Estimate the sum of 12.3 and 9.75?

Last Answer : because it is hard to do the math

Description : The energy required per unit mass to grind limestone particles of very large size to 100 μm is 12.7 kWh/ton. An estimate (using Bond's law) of the energy to grind the particles from a very large size to 50 μm is (A) 6.35 kWh/ton (B) 9.0 kWh/ton (C) 18 kWh/ton (D) 25.4 kWh/ton

Last Answer : (C) 18 kWh/ton

Description : Petri is working for Nokia in Finland. He has completed 10 months of his 12-month project, budgeted at $800,000. His earned value analysis shows that variance at  completion is $75,000. What is the estimate at completion value ... : a. 725,000 b. -725,000 c. -$875,000 d. $875,000 e. $800,000

Last Answer : d. $875,000

Description : The concrete roof of a house is 10 m by 8 m and 10 cm thick (4"). Estimate the total heat the roof would absorb over the 12 day?  a. 1.3 x 108 J  b 2.3 x 108 J  c. 3.3 x 108 J  d. 4.3 x 108 J formula: ΔQ = ΔQ/Δtx Δt

Last Answer : 1.3 x 108 J

Description : The likely estimate on equivalent power wastage for a leakage from 7 bar compressed air system through 1.6 mm orifice size is ____ a) 0.2 kW b) 3.0 kW c) 0.8 kW d) 12 kW

Last Answer : c) 0.8 kW