which of the following requires the longest amount of time in college? -General Knowledge

1 Answer

Answer :

The answer is B. Sport Physician.

Related questions

Description : Which Automation rating requires the longest time to reposition a product? a. 1 b. 3 c. 7 d. 9 e. 10

Last Answer : e. 10

Description : What course requires a passing grade in the class to earn college credit?

Last Answer : Need answer

Description : Assertion `:-` Mostly aquatic animals are ammonotelic. Reason `:-` Ammonia is the most toxic form and requires large amount of water for its eliminati

Last Answer : Assertion `:-` Mostly aquatic animals are ammonotelic. Reason `:-` Ammonia is the most toxic form and ... . D. If both Assertion & Reason are false.

Description : Bit map terminal A) support display containing multiple windows B) require considerable amount of video RAM C) requires tremendous amount of copying and hence low performance D) all of above

Last Answer : Answer : D

Description : Which crops grown in alluvial soil requires huge amount of water

Last Answer : Rice

Description : Which crop requires maximum amount of nitrogen ? (A) Potato (B) Wheat (C) Barley (D) Sugarcane

Last Answer : (D) Sugarcane

Description : Air-refrigeration cycle (A) Is the most efficient of all refrigeration cycles (B) Has very low efficiency (C) Requires relatively large quantities of air to achieve a significant amount of refrigeration (D) Both (B) and (C)

Last Answer : (D) Both (B) and (C)

Description : Fixed capital investment of a chemical plant is the total amount of money needed to supply the necessary plant and manufacturing facilities plus the working capital for operation of the facilities. Which of ... (B) Equipment installation cost (C) Cost for piping (D) Equipment insulation cost

Last Answer : (D) Equipment insulation cost

Description : What is the longest amount of time you've spent in complete solitude?

Last Answer : I don’t remember, but here is a vignette from The Martian where they talk about it. https://www.youtube.com/watch?v=Wygmxzp6VzY

Description : What is the longest amount of time that you went with out food?

Last Answer : Between lunch and supper.

Description : Whats the longest amount of time you have been without a shower or bath?

Last Answer : 3 or 4 days and it was horrible

Description : In a PERT network, slack time is _____. (a) The end point that represents the completion of a major activity (b) The time or resources required to progress from one event to another ( ... without delaying the whole Project (d) The longest or most time-consuming sequence of events and activities 

Last Answer : (c) The amount of time an individual activity can be delayed without delaying the whole Project