Description : Which of the following is the last step of the rapid prototyping process? a.3D Modeling b.Data Conversion c.Building d.Postprocessing
Last Answer : d.Postprocessing
Description : Which of the following is the firststep of the rapid prototyping process? a.3D Modeling b.Data Conversion c.Building d.Postprocessing
Last Answer : a.3D Modeling
Description : ____ is defined as the set of technologies that can construct physical solid models from CAD data a.Rapid Production b.Rapid prototyping c.Lean Manufacturing d.Artificial intelligence
Last Answer : b.Rapid prototyping
Description : Of all of the current material addition rapid prototyping technologies, which one is the mostwidely used? a.Ballistic particle manufacturing b.Selective laser sintering c.Solid ground curing d.Stereolithography
Last Answer : d.Stereolithography
Description : Which of the following are problems with the current rapid prototyping and additivemanufacturing technologies? a.Limited material variety b.Inability to convert a solid part into layers c.Poor machinability of the starting material d.The inability of the designer to design the part
Last Answer : a.Limited material variety
Description : In the context of rapid prototyping and additive manufacturing, tessellation refers to theprocess of slicing the CAD model of the part into layers. a.Droplet Deposition Manufacturing b.Used-Deposition Modeling c.Laminated-Object Manufacturing d.Stereolithography
Description : Machining is never used for rapid prototyping because it takes too long. a.TRUE b.FALSE c. d.
Last Answer : b.FALSE
Description : Which one is NOT related to rapid prototyping definition? a.Layer by layer b.Physical model c.From 3D CAD data d.Production line
Last Answer : d.Production line
Description : Among the following, which one is the last step in Data Processing for Rapid Prototyping? a.Model slicing b.Part orientation c.Tool path generation d.Support generation
Last Answer : c.Tool path generation
Description : Which of the following is least important in design during rapid prototyping? a.Machine size b.Tolerance c.Material d.CAD software
Last Answer : b.Tolerance
Description : For rapid prototyping 3D CAD model should be converted into______file a.SGC b.SLA c.STL d.SLS
Last Answer : c.STL
Description : Which one of the process is subtractive prototyping? a.5 axis CNC Milling b.Fused Deposition Modeling c.Multi-Jet Modeling d.Stereolithography Apparatus
Last Answer : a.5 axis CNC Milling
Description : Which CAD software cannot be used to create data for the prototyping machine? a.CREO b.CATIA c.NX Unigraphics d.Adobe Illustrator
Last Answer : d.Adobe Illustrator
Description : What is the format for the prototyping machine file? a..prt b..slt c..stl d..iges
Last Answer : c..stl
Description : In “Product Life Cycle†a stage represents rapid growth of product sale known as_____. a.Saturation stage b.Mature stage c.Growth stage d.Introduction stage
Last Answer : c.Growth stage
Description : Which of the following is not the advantage of CNC machines? a.Higher flexibility b.Improved quality c.Reduced scrap rate d.Improved strength of the components
Last Answer : d.Improved strength of the components
Description : Which materials possess highest melting temperature? a.ABS b.PLA c.Nylon d.INF
Last Answer : c.Nylon
Description : Which material possess the maximum strength? a.ABS b.PLA c.Nylon d.INF
Description : If the scaling factors values Sx and Sy < 1 then a.It reduces the size of object b.It increases the size of object c.It stunts the shape of an object d.None
Last Answer : a.It reduces the size of object
Description : Which one of the following is not a direct rapid tooling method? a.LOM Composite b.Direct AIM (ACES Injection Molding) c.Sand Molding d.Injection molding
Last Answer : d.Injection molding
Description : Which one of the following is not a rapid indirect tooling method? a.Vacuum Casting b.Investment Casting c.Laser-Engineered Net Shaping d.Injection molding
Last Answer : c.Laser-Engineered Net Shaping
Description : G00 Preparatory code is used for a.Rapid Travel Execution b.Rapid Travel Positioning c.Rapid Travel sequencing d.Rapid clockwise interpolation
Last Answer : b.Rapid Travel Positioning
Description : During the execution of a CNC part program block NO20 GO2 X45.0 Y25.0 R5.0the type of tool motion will be a.circular Interpolation – clockwise b.circular Interpolation – counter clockwise c.linear Interpolation d.rapid feed
Last Answer : a.circular Interpolation – clockwise
Description : Which of the following is an advantage of using an expert system development tool? a) imposed structure b) knowledge engineering assistance c) rapid prototyping d) all of the mentioned
Last Answer : d) all of the mentioned
Description : From the following which is the benefits of AS/RS a.Less product damage b.Good and easy housekeeping in FMS c.Reduce labour cost d.All of the above
Last Answer : d.All of the above
Description : Which material gives finest surface finish in RP? a.ABS b.PLA c.Nylon d.INF
Last Answer : b.PLA
Description : ________ command gives an array of object in 3D modeling a.Extrude b.Revolve c.Pattern d.All of the above
Last Answer : c.Pattern
Description : In ship manufacturing, the type of layout preferred is a.Product layout b.Process layout c.Fixed-position layout d.GT layout
Last Answer : c.Fixed-position layout
Description : The following type of layout is preferred for low volume production of non-standard products a.Product layout b.Process layout c.Fixed-position layout d.GT layout
Last Answer : b.Process layout
Description : The following type of layout is preferred to manufacture a standard product in large quantity a.Product layout b.Process layout c.Fixed-position layout d.GT layout
Last Answer : a.Product layout
Description : If all the processing equipment and machines are arranged according to the sequence ofoperations of a product the layout is known as a.Product layout b.Process layout c.Fixed-position layout d.GT layout
Description : Which layout is mostly used for the batch type of production? a.Product layout b.Process layout c.In line layout d.None of the above
Description : ____ is the bridge between design and manufacturing a.Production planning b.Process Planning c.Product design d.None of the above
Last Answer : b.Process Planning
Description : In which layout manufacturing is done according to product's characteristics? a.Process layout b.GT layout c.Product layout d.Both A & B
Last Answer : d.Both A & B
Description : In which layout manufacturing is done according to machine arrangement a.GT layout b.Product layout c.Process layout d.Hybrid layout
Last Answer : c.Process layout
Description : Which layout is mostly used for batch type of production? a.Product layout b.Process layout c.In line layout d.None of the above
Description : Form which of the following is the objective of cellular manufacturing. a.Reduced manufacturing lead time b.Increased in quality c.Reduced setup time d.All of the above
Description : By changing the dimensions of the viewport, the and ofthe objects being displayed can be manipulated. a.Number of pixels and image quality b.X co-ordinate and Y co-ordinate c.Size and proportions d.All of these
Last Answer : c.Size and proportions
Description : The main advantage of using long handle weeders is b. Less area of coverage c. Cheaper cost of weeder d. None of above
Last Answer : Ans - a. Less drudgery to operator
Description : The time duration of useful life of any product is known as a product's life cycle. a.TRUE b.FALSE c. d.
Description : Which of the following is not the method of part family formation a.Visual inspection method b.Automatic product sorting c.Parts classification & coding d.Production flow analysis
Last Answer : b.Automatic product sorting
Description : If the production is done according to change in various product design easily then suchmanufacturing system is called as flexible system. a.TRUE b.FALSE c.D d.
Description : In “Product Life Cycle†a stage represents a new and previously unknown product forbuyers known as_____. a.Mature stage b.Introduction stage c.Decline stage d.None of the above
Last Answer : b.Introduction stage
Description : Which of the following is a stage of Product Life Cycle? a.Introduction stage b.Growth stage c.Mature stage d.All of the above
Description : The tensor product technique constraints surfaces by two curves. a.2 b.1 c.3 d.4
Last Answer : b.1
Description : Scaling of a polygon is done by computing a.The product of (x, y) of each vertex b.(x, y) of end points c.Center coordinates d.Only a
Last Answer : d.Only a
Description : From the following which is the types of Automated Guided Vehicle (AGV). a.Driver less train b.Pallet trucks c.Unit load carriers d.All of the above
Description : If the size of the elements is small, the final solution is expected to be accurate. a.more b.less c.depends on other factors d.can't say
Last Answer : a.more
Description : Panning is a technique in which users can change the size of the area to beviewed in order to see more detail or less detail. a.TRUE b.FALSE c. d.
Description : A use computer to automatically generate process plans is? a.Lower-level strategies b.Intermediate strategies c.Higher-level strategies d.Morden-level strategies
Last Answer : c.Higher-level strategies