Which of the following is least important in design during rapid prototyping? a.Machine size b.Tolerance c.Material d.CAD software

1 Answer

Answer :

b.Tolerance

Related questions

Description : ____ is defined as the set of technologies that can construct physical solid models from CAD data a.Rapid Production b.Rapid prototyping c.Lean Manufacturing d.Artificial intelligence

Last Answer : b.Rapid prototyping

Description : In the context of rapid prototyping and additive manufacturing, tessellation refers to theprocess of slicing the CAD model of the part into layers. a.Droplet Deposition Manufacturing b.Used-Deposition Modeling c.Laminated-Object Manufacturing d.Stereolithography

Last Answer : d.Stereolithography

Description : Which one is NOT related to rapid prototyping definition? a.Layer by layer b.Physical model c.From 3D CAD data d.Production line

Last Answer : d.Production line

Description : For rapid prototyping 3D CAD model should be converted into______file a.SGC b.SLA c.STL d.SLS

Last Answer : c.STL

Description : Which CAD software cannot be used to create data for the prototyping machine? a.CREO b.CATIA c.NX Unigraphics d.Adobe Illustrator

Last Answer : d.Adobe Illustrator

Description : Which of the following are problems with the current rapid prototyping and additivemanufacturing technologies? a.Limited material variety b.Inability to convert a solid part into layers c.Poor machinability of the starting material d.The inability of the designer to design the part

Last Answer : a.Limited material variety

Description : Of all of the current material addition rapid prototyping technologies, which one is the mostwidely used? a.Ballistic particle manufacturing b.Selective laser sintering c.Solid ground curing d.Stereolithography

Last Answer : d.Stereolithography

Description : Which of the following is the last step of the rapid prototyping process? a.3D Modeling b.Data Conversion c.Building d.Postprocessing

Last Answer : d.Postprocessing

Description : Which of the following is the firststep of the rapid prototyping process? a.3D Modeling b.Data Conversion c.Building d.Postprocessing

Last Answer : a.3D Modeling

Description : Machining is never used for rapid prototyping because it takes too long. a.TRUE b.FALSE c. d.

Last Answer : b.FALSE

Description : Among the following, which one is the last step in Data Processing for Rapid Prototyping? a.Model slicing b.Part orientation c.Tool path generation d.Support generation

Last Answer : c.Tool path generation

Description : Which of the following advantage does not possess by the rapid prototyping process over thetraditional prototyping process? a.It consumes less time b.Gives better quality c.Reduces product launch time d.It's cheaper

Last Answer : d.It's cheaper

Description : What is the format for the prototyping machine file? a..prt b..slt c..stl d..iges

Last Answer : c..stl

Description : A computer model of a part design on a CAD system is called which of the following? a.Computer Prototype b.Geometric Prototype c.Solid Prototype d.Virtual Prototype

Last Answer : d.Virtual Prototype

Description : CAD/CAM is the relationship between a.science and engineering b.manufacturing and marketing c.design and manufacturing d.design and marketing

Last Answer : c.design and manufacturing

Description : A system that automates the drafting process with interactive computer graphics iscalled a.Computer Aided Engineering (CAE) b.Computer Aided Design (CAD) c.Computer Aided Manufacturing (CAM) d.Computer Aided Instruction (CAI)

Last Answer : b.Computer Aided Design (CAD)

Description : The STL files translate the part geometry from a CAD system to________ a.CNC machine b.VMC machine c.RP machine d.CAPP machine

Last Answer : c.RP machine

Description : Which of the following is the process of the pre-processing stage? a.Remove support b.Checking 3D CAD data c.De-powdering loose material d.Dip in a binder to strengthen the part

Last Answer : b.Checking 3D CAD data

Description : Which one of the process is subtractive prototyping? a.5 axis CNC Milling b.Fused Deposition Modeling c.Multi-Jet Modeling d.Stereolithography Apparatus

Last Answer : a.5 axis CNC Milling

Description : Which of the following can not be the input of CAD solid model? a.Physical mockup b.2D surface data c.Tooling d.3D CAD data

Last Answer : c.Tooling

Description : Choose the correct sequence to generate prototype a.3D CAD data - CAD solid model - STL file - RP prototype b.CAD solid model - 3D CAD data - RP prototype - STL file c.STL file - 3D CAD data - CAD solid model - RP prototype d.3D CAD data - STL file - CAD solid model - RP prototype

Last Answer : a.3D CAD data - CAD solid model - STL file - RP prototype

Description : Input of RP data is ______ a.CAM data b.CAPP data c.CAD data d.All of the above

Last Answer : c.CAD data

Description : From following, the alternative name for RP is ________ a.Additive Manufacturing b.Layer Manufacturing c.Direct CAD Manufacturing d.All of the above

Last Answer : d.All of the above

Description : In a CAD package, mirror image of a 2D point P (5, 10) is to be obtained about a line whichpasses through the origin and makes an angle of 45° counterclockwise with the X-axis. The coordinates of the transformed point will be a.(7.5, 5) b.(10, 5) c.(7.5, -5) d.(10, -5)

Last Answer : b.(10, 5)

Description : Which two disciplines are tied by a common database? a.documentation and geometric modeling b.CAD and CAM c.drafting and documentation d.none of the mentioned

Last Answer : b.CAD and CAM

Description : In a 2-D CAD package, clockwise circular arc of radius, 5, specified from P1 (15,10)to P2 (10,15)will have its center at a.(10, 10) b.(15, 10) c.(15, 15) d.(10, 15)

Last Answer : a.(10, 10)

Description : In a simple and visual method of Cell design, the priorities in classifying may be in the order a.Rotational or non rotational †Material †Size †Shape b.Material †Rotational or non ... non rotational †Material †Shape d.Shape †Rotational or non rotational †Material †Size

Last Answer : a.Rotational or non rotational – Material – Size – Shape

Description : During the execution of a CNC part program block NO20 GO2 X45.0 Y25.0 R5.0the type of tool motion will be a.circular Interpolation – clockwise b.circular Interpolation – counter clockwise c.linear Interpolation d.rapid feed

Last Answer : a.circular Interpolation – clockwise

Description : From the following which is the step of machine cell design? a.Divide parts into part families b.Select type of machine cell c.Prepare a composite part d.All of the above

Last Answer : d.All of the above

Description : Which of the following is one of the design process steps? a.Build b.Concept c.Pre-processing d.Transfer to machine

Last Answer : b.Concept

Description : The following is basically a material flow simplification technique a.A simple and visual method of cell design b.Family formation by classification and codification c.Cell formation using Production Flow Analysis d.All of the above

Last Answer : c.Cell formation using Production Flow Analysis

Description : In “Product Life Cycle” a stage represents rapid growth of product sale known as_____. a.Saturation stage b.Mature stage c.Growth stage d.Introduction stage

Last Answer : c.Growth stage

Description : Which one of the following is not a direct rapid tooling method? a.LOM Composite b.Direct AIM (ACES Injection Molding) c.Sand Molding d.Injection molding

Last Answer : d.Injection molding

Description : Which one of the following is not a rapid indirect tooling method? a.Vacuum Casting b.Investment Casting c.Laser-Engineered Net Shaping d.Injection molding

Last Answer : c.Laser-Engineered Net Shaping

Description : G00 Preparatory code is used for a.Rapid Travel Execution b.Rapid Travel Positioning c.Rapid Travel sequencing d.Rapid clockwise interpolation

Last Answer : b.Rapid Travel Positioning

Description : The machine tool, in which calculation and setting of the operating conditions like depth ofcut, feed, speed are done during the machining by the control system itself, is called a.Computer Numerical Control System b.Direct Numerical Control System c.Machining Center System d.Adaptive Control System

Last Answer : d.Adaptive Control System

Description : Secondary code of the Opitz system is for_________ a.Design attributes b.Manufacturing attributes c.Production operation type & sequence d.Maintenance flow

Last Answer : c.Production operation type & sequence

Description : Supplementary code of the Opitz system is for_________ a.Design attributes b.Manufacturing attributes c.Production operation type & sequence d.Maintenance flow

Last Answer : b.Manufacturing attributes

Description : Form code of the Opitz system is for_________ a.Design attributes b.Manufacturing attributes c.Production operation type & sequence d.Maintenance flow

Last Answer : a.Design attributes

Description : Which of the following technique of grouping does not consider the design and shape aspect? a.A simple and visual method of cell design b.Family formation by classification and codification c.Cell formation using Production Flow Analysis d.All of the above

Last Answer : c.Cell formation using Production Flow Analysis

Description : ____ is the bridge between design and manufacturing a.Production planning b.Process Planning c.Product design d.None of the above

Last Answer : b.Process Planning

Description : If the production is done according to change in various product design easily then suchmanufacturing system is called as flexible system. a.TRUE b.FALSE c.D d.

Last Answer : b.FALSE

Description : The technology is defined as the sophistication of a plant ,any equipment or any machine etc a.TRUE b.FALSE c.D d.

Last Answer : b.FALSE

Description : ____ is a general purpose, programmable machine possessing certain human like characteristics a.Robot b.Manipulator c.Gripper d.None of the above

Last Answer : a.Robot

Description : From the following in which FMS layout machine tools are kept along a straight line. a.Loop layout b.In line layout c.Ladder layout d.Open field layout

Last Answer : b.In line layout

Description : ____ is a highly automated group of GT machine cell. a.Flexible manufacturing system b.Group technology c.Automated system d.None of the above

Last Answer : a.Flexible manufacturing system

Description : In which layout manufacturing is done according to machine arrangement a.GT layout b.Product layout c.Process layout d.Hybrid layout

Last Answer : c.Process layout

Description : Which of the following is the process in the RP cycle? a.Post-processing b.Transfer to machine c.Pre-processing d.All of the above

Last Answer : d.All of the above

Description : The lost motion in CNC machine tool is on account of a.Backlash in gearing b.Wind-up of drive shafts c.Deflection of machine tool members d.All the above

Last Answer : a.Backlash in gearing

Description : In finish machining of an island on a casting with CNC milling machine, an end mill with 10 mm diameter is employed. The corner points of the island are represented by (0, 0), (0, 30), (50, 30) and (50, 0). By applying cutter radius right ... , 5), (5, 5) d.(5, 5), (45, 5), (45, 25), (5, 25), (5, 5)

Last Answer : a.(-5, 0), (-5, 35), (55, 35), (55,-5), (-5,-5)