Among the following, which one is the last step in Data Processing for Rapid Prototyping? a.Model slicing b.Part orientation c.Tool path generation d.Support generation

1 Answer

Answer :

c.Tool path generation

Related questions

Description : Among the following, which one is the earliest step in Data Processing for RapidPrototyping? a.Model slicing b.Part orientation c.Tool path generation d.Support generation

Last Answer : b.Part orientation

Description : In the context of rapid prototyping and additive manufacturing, tessellation refers to theprocess of slicing the CAD model of the part into layers. a.Droplet Deposition Manufacturing b.Used-Deposition Modeling c.Laminated-Object Manufacturing d.Stereolithography

Last Answer : d.Stereolithography

Description : Which of the following is the last step of the rapid prototyping process? a.3D Modeling b.Data Conversion c.Building d.Postprocessing

Last Answer : d.Postprocessing

Description : Which one is NOT related to rapid prototyping definition? a.Layer by layer b.Physical model c.From 3D CAD data d.Production line

Last Answer : d.Production line

Description : For rapid prototyping 3D CAD model should be converted into______file a.SGC b.SLA c.STL d.SLS

Last Answer : c.STL

Description : ____ is defined as the set of technologies that can construct physical solid models from CAD data a.Rapid Production b.Rapid prototyping c.Lean Manufacturing d.Artificial intelligence

Last Answer : b.Rapid prototyping

Description : Which of the following is the firststep of the rapid prototyping process? a.3D Modeling b.Data Conversion c.Building d.Postprocessing

Last Answer : a.3D Modeling

Description : Which of the following are problems with the current rapid prototyping and additivemanufacturing technologies? a.Limited material variety b.Inability to convert a solid part into layers c.Poor machinability of the starting material d.The inability of the designer to design the part

Last Answer : a.Limited material variety

Description : Of all of the current material addition rapid prototyping technologies, which one is the mostwidely used? a.Ballistic particle manufacturing b.Selective laser sintering c.Solid ground curing d.Stereolithography

Last Answer : d.Stereolithography

Description : Machining is never used for rapid prototyping because it takes too long. a.TRUE b.FALSE c. d.

Last Answer : b.FALSE

Description : Which of the following is least important in design during rapid prototyping? a.Machine size b.Tolerance c.Material d.CAD software

Last Answer : b.Tolerance

Description : Which of the following advantage does not possess by the rapid prototyping process over thetraditional prototyping process? a.It consumes less time b.Gives better quality c.Reduces product launch time d.It's cheaper

Last Answer : d.It's cheaper

Description : Process of converting STL file model in to layers is called________in RP a.chopping b.slicing c.cutting d.trimming

Last Answer : b.slicing

Description : During the execution of a CNC part program block NO20 GO2 X45.0 Y25.0 R5.0the type of tool motion will be a.circular Interpolation – clockwise b.circular Interpolation – counter clockwise c.linear Interpolation d.rapid feed

Last Answer : a.circular Interpolation – clockwise

Description : Which of the following is the process of the pre-processing stage? a.Remove support b.Checking 3D CAD data c.De-powdering loose material d.Dip in a binder to strengthen the part

Last Answer : b.Checking 3D CAD data

Description : Slicing a part is easier in ______ a.B-rep method b.STL method c.CSG method d.PRT method

Last Answer : b.STL method

Description : Which CAD software cannot be used to create data for the prototyping machine? a.CREO b.CATIA c.NX Unigraphics d.Adobe Illustrator

Last Answer : d.Adobe Illustrator

Description : The tool of an NC machine has to move along a circular arc from (5, 5) to (10, 10) while performing an operation. The centre of the arc is at (10, 5). Which one of the following NC tool path command performs the ... b.N010 GO3 X10 Y10 X5 Y5 R5 c.N010 GO1 X5 Y5 X10 Y10 R5 d.N010 GO2 X5 Y5 X10 Y10 R5

Last Answer : a.N010 GO2 X10 Y10 X5 Y5 R5

Description : n an NC machining operation, the tool has to be moved from point (5, 4) to point (7, 2) alonga circular path with centre at (5, 2). Before starting the operation, the tool is at (5, 4). The G and N codes for this motion ... 0 I5.0 J2.0 c.N010 GO1 X7.0 Y2.0 I5.0 J2.0 d.N010 GOO X7.0 Y2.0 I5.0 J2.0

Last Answer : b.N010 GO2 X7.0 Y2.0 I5.0 J2.0

Description : Which one of the process is subtractive prototyping? a.5 axis CNC Milling b.Fused Deposition Modeling c.Multi-Jet Modeling d.Stereolithography Apparatus

Last Answer : a.5 axis CNC Milling

Description : What is the format for the prototyping machine file? a..prt b..slt c..stl d..iges

Last Answer : c..stl

Description : Which of the following is NOT true?Image formed by reflection through a plane mirror is a.of same size b.same orientation c.is at same distance from the mirror d.virtual

Last Answer : b.same orientation

Description : Computer will perform the data processing functions in a.NC b.CNC c.DNC d.None of the mentioned

Last Answer : b.CNC

Description : Which of the following is an advantage of using an expert system development tool? a) imposed structure b) knowledge engineering assistance c) rapid prototyping d) all of the mentioned

Last Answer : d) all of the mentioned

Description : From the following which is the step of machine cell design? a.Divide parts into part families b.Select type of machine cell c.Prepare a composite part d.All of the above

Last Answer : d.All of the above

Description : For a well understood data processing application it is best to use (A) The waterfall model (B) prototyping model (C) the evolutionary model (D) the spiral model

Last Answer : (A) The waterfall model

Description : In “Product Life Cycle” a stage represents rapid growth of product sale known as_____. a.Saturation stage b.Mature stage c.Growth stage d.Introduction stage

Last Answer : c.Growth stage

Description : Which one of the following is not a direct rapid tooling method? a.LOM Composite b.Direct AIM (ACES Injection Molding) c.Sand Molding d.Injection molding

Last Answer : d.Injection molding

Description : Which one of the following is not a rapid indirect tooling method? a.Vacuum Casting b.Investment Casting c.Laser-Engineered Net Shaping d.Injection molding

Last Answer : c.Laser-Engineered Net Shaping

Description : G00 Preparatory code is used for a.Rapid Travel Execution b.Rapid Travel Positioning c.Rapid Travel sequencing d.Rapid clockwise interpolation

Last Answer : b.Rapid Travel Positioning

Description : STL files contains ______ a.mass properties of the model b.geometrical data c.drawing data d.all of the above

Last Answer : b.geometrical data

Description : Which of the following can not be the input of CAD solid model? a.Physical mockup b.2D surface data c.Tooling d.3D CAD data

Last Answer : c.Tooling

Description : Choose the correct sequence to generate prototype a.3D CAD data - CAD solid model - STL file - RP prototype b.CAD solid model - 3D CAD data - RP prototype - STL file c.STL file - 3D CAD data - CAD solid model - RP prototype d.3D CAD data - STL file - CAD solid model - RP prototype

Last Answer : a.3D CAD data - CAD solid model - STL file - RP prototype

Description : A computer model of a part design on a CAD system is called which of the following? a.Computer Prototype b.Geometric Prototype c.Solid Prototype d.Virtual Prototype

Last Answer : d.Virtual Prototype

Description : If all the processing equipment and machines are arranged according to the sequence ofoperations of a product the layout is known as a.Product layout b.Process layout c.Fixed-position layout d.GT layout

Last Answer : a.Product layout

Description : Which of the following is one of the design process steps? a.Build b.Concept c.Pre-processing d.Transfer to machine

Last Answer : b.Concept

Description : Which of the following is the process in the RP cycle? a.Post-processing b.Transfer to machine c.Pre-processing d.All of the above

Last Answer : d.All of the above

Description : is/are the phase/s of finite element method a.Pre-processing b.Solution c.Post Processing d.None

Last Answer : c.Post Processing

Description : From which of the following is not the main element of Flexible manufacturing system a.Work handling system b.Material handling system c.Tool handling system d.Main frame computer

Last Answer : a.Work handling system

Description : From the following which is not the application of AGV. a.Truck loading and unloading b.To change the tool c.Material transfer d.Paper roll transfer

Last Answer : b.To change the tool

Description : In laminated object manufacturing (LOM), which of the following cutting strategy ispreferable? a.Directional scanning b.Zigzag tool paths c.Contouring and spiral paths d.Boundary cutting tool paths

Last Answer : d.Boundary cutting tool paths

Description : The lost motion in CNC machine tool is on account of a.Backlash in gearing b.Wind-up of drive shafts c.Deflection of machine tool members d.All the above

Last Answer : a.Backlash in gearing

Description : What is the full form of ATC? a.Automatic tool changer b.Arranged tool changer c.Automatic tool controller d.Arranged tool controller

Last Answer : a.Automatic tool changer

Description : The machine tool, in which calculation and setting of the operating conditions like depth ofcut, feed, speed are done during the machining by the control system itself, is called a.Computer Numerical Control System b.Direct Numerical Control System c.Machining Center System d.Adaptive Control System

Last Answer : d.Adaptive Control System

Description : Automatic tool change in CNC Machine code a.M05 b.M06 c.M07 d.M09

Last Answer : b.M06

Description : In CNC machining tool radius compensation turning the left mode ON programming contourdone by a.G40 b.G41 c.G42 d.G43

Last Answer : b.G41

Description : The distance of a given tool tip from the surface of workpiece is known as….. a.Tool length b.Tool length offset H c.Cutter radius d.Compensation

Last Answer : b.Tool length offset H

Description : In the lathe it is the peripheral speed of the work piece cutting speed of tool is expressed inm/min, V is a.= 𝜋𝐷𝑁/1000 b.= 𝜋𝐷/1000 c.= 𝐷𝑁/1000 d.=𝜋𝐷𝑁/10

Last Answer : a.= 𝜋𝐷𝑁/1000

Description : A CNC Lathe is usually a machine tool with Z axes is….. a.Line Joining origin and vertical movement b.Line perpendicular to Y axis c.Both A & B d.Line Joining Chuck centre & tail stock centre

Last Answer : d.Line Joining Chuck centre & tail stock centre

Description : In how many ways CNC machine tool systems can be classified? a.2 b.3 c.4 d.5

Last Answer : b.3