Power tillers are popularly available in hp range of
q. 6-12 hp
r. 12-20 hp
s. 1-6 hp
t. 20-50 hp

1 Answer

Answer :

q. 6-12 hp

Related questions

Description : Maximum distance covered in a day by a Patrolman should not normally exceed q. 2 km. r. 5 km. s. 10 km. t. 20 km .*

Last Answer : t. 20 km

Description : From distribution main of 50 mm size, number of service pipes of 15 mm size can be taken off are ------ a) 6 b)10 c) 12 e):20*

Last Answer : e):20*

Description : Rails used for A T Welding shall not normally be welded? (i) 20 years old . (ii) 30 years old (iii) 40 years old (iv) 50 years old*

Last Answer : iv) 50 years old*

Description : As per new classification of railway accident, floods breaches & land slides’ is classified in the following class (a) Class J (b) Class K (c) Class Q (d) Class R*

Last Answer : (d) Class R*

Description : Formation width for cuttings for B.G. single line section is (a) 5.40 m (b) 6.20 m (c) 6.25 m* (d) 6.50 m

Last Answer : (c) 6.25 m*

Description : Track structure for CC+8 t+ 2 t loaded trains is:- (a) 52 Kg 90 UTS;PSC 1540 sleepers/ Km.; 250 mm ballast. (b) 60 Kg 90 UTS;PSC 1660 sleepers/ Km.; 300 mm ballast.* (c) 52 Kg 72 UTS;PSC 1540 sleepers/ Km.; 300 mm ballast. (d) 90 R;PSC 1340 sleepers/ Km.; 250 mm ballast.

Last Answer : b) 60 Kg 90 UTS;PSC 1660 sleepers/ Km.; 300 mm ballast.*

Description : From the distribution main of 40 mm size, number of service pipe of 20 mm size can be taken off are ------- a)3 B) 6* c) 10 d) 12

Last Answer : B) 6*

Description : A rural water supply serves a population of 10, 000 at the rate of 50 litres per capita per day . For the chlorine dose of 2 PPM the required amount of bleaching powder with 20% available chlorine will be a. 0.5 kg b. 5 kg * c. 10 kg d. 15 kg

Last Answer : b. 5 kg

Description : The total number of bridges on I.R.is about a)1 Lac b)1.25 Lacs* c)1.50 Lacs d)2 Lacs

Last Answer : b)1.25 Lacs*

Description : What is the time of removal the tensor from the newly executed A T Weld? (i) 15 minutes after pouring. (ii) 20 minutes after pouring* (iii) 25 minutes after pouring. (iv) 30 minutes after pouring.

Last Answer : (ii) 20 minutes after pouring*

Description : Size of cubicle of a booking office is kept as (a) 1.20 x 1.50 m (b) 1.50 x 1.20 m (c) 1.50 x 1.80 m (d) 1.80 x 1.50 m*

Last Answer : (d) 1.80 x 1.50 m*

Description : Cross slope of the formation to have good drainage of Ballast section is a) 1 in 40* b) 1 in 50 c) 1 in 30 d) 1 in 20

Last Answer : a) 1 in 40*

Description : Duration of lone Hooter is: (a) 20 seconds (b) 25 seconds (c) 30 seconds* (d) 50 seconds

Last Answer : (c) 30 seconds*

Description : Number of taps to be provided on ‘A’ category stations on each platform as per norms of minimum essential facilities are (a) 20 taps (b) 15 taps (c) 12 taps* (d) One taps for each bogie

Last Answer : (c) 12 taps*

Description : ormal size of brick used in India is a) 22 x 11.2 x 7 cm* b) 25 x 16 x 8 cm c) 19 x 12 x 9 cm d) 20 x 10 x 5 cm

Last Answer : a) 22 x 11.2 x 7 cm*

Description : Surface preparation for Metallising the abrasives used for final cleaning is a) Chilled iron grit G.24, as defined in BS : 2451 b) Washed salt free angular silica sand of mesh size 12 to 30 with a minimum of 40% retained on a 20 mesh c) either (a) or (b) * d) d) neither (a) or (b)

Last Answer : c) either (a) or (b) *

Description : n Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 12.20 < 30.5 m a) 300 mm b) 600 mm* c) 500 mm d) 450 mm

Last Answer : b) 600 mm*

Description : In cement pressure grouting G.I pipes of diameter …… and ……length, should be fixed in drilled holes a) 12 to 20 mm, 200 mm* b) 12 to 20 mm, 300 mm c) 12 to 25 mm, 500 mm d) 20 to 25 mm, 300 mm

Last Answer : a) 12 to 20 mm, 200 mm*

Description : The pumping system should be capable of supplying the normal quantity of water required in 24 hours in a)12 hours or less b) 16 hours or less c) 20 hours or less* d) 8 hours or less

Last Answer : c) 20 hours or less*

Description : Permissible speed of Turnout with 1 in 12 curved switches a. 40 kmph* b. 25 kmph c. 15 kmph d. 20 kmph

Last Answer : a. 40 kmph*

Description : Formation width for banks for B.G. single line section is (a) 6.10 m (b) 6.50 m (c) 6.85 m* (d) 7.0 m

Last Answer : (c) 6.85 m*

Description : The frequency of a wave travelling at a speed of 500 ms-1 is 25 Hz. Its time period will be ______. (i) 20 s (ii) 0.05 s (iii) 25 s (iv) 0.04 s

Last Answer : (iv) 0.04 s

Description : Plasticity index represents the range of water content between a) Liquid and plastic limit * b) Plastic limit and semi solid limit c) Semisolid Limit and liquid limit d) Liquid limit and solid limit.

Last Answer : a) Liquid and plastic limit *

Description : Numbers of taps on each platform of ‘C’ category station as per norms of minimum essential facility criteria are (a) 6* (b) 8 (c) 12 (d) 15

Last Answer : (a) 6*

Description : Numbers of taps on each platform of ‘B’ category station as per norms of minimum essential facility criteria are (a) 6 (b) 8 (c) 12* (d) 15

Last Answer : (c) 12*

Description : Numbers of taps on each platform of ‘A’ category station as per norms of minimum essential facility criteria are (a) 6 (b) 8 (c) 12 (d) 15*

Last Answer : d) 15*

Description : What is the Shelf life of mould ? (i) 6 months minimum. (ii) 8 months minimum (iii) 9 months minimum* (iv) 12 months minimum

Last Answer : (iii) 9 months minimum*

Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm

Last Answer : c) 450 mm*

Description : Rail Cluster, as temporary arrangement can be used upto a span of a) 3.66m* b) 6.1m c) 12.2m d) 18.3 m

Last Answer : a) 3.66m*

Description : From distribution main of 40 mm size , number of service pipe of 15 mm size can be taken off are--------- a) 3 b) 6 c) 10 d) 12*

Last Answer : d) 12*

Description : Power tillers operate most satisfactory with? 1. Rotary tillage 2. Plough 3. Transport carts 4. reapers

Last Answer : ans 1

Description : Power tillers operate most satisfactory with? A. Rotary tillage C. Plough B. Transport carts D. Reapers

Last Answer : Rotary tillage

Description : Mechanisation in india at various levels can be done in following ways a) by introducing the improved agricultural implements on small scale holding to be operated by bullocks. b) by using small ... tractor and machines on remaining holding to supplement animal power source. d) All of the above

Last Answer : All of the above

Description : The production of tractors and power tillers started in ……. a)1950 b)1940 c)1960 d)2001

Last Answer : 1960

Description : ASPEE are famous for manufacturing: a) Tractor b) Power tillers c) Ploughs d) Sprayers

Last Answer : d) Sprayers

Description : A power tiller is relatively more suitable for : A. Puddling of low land paddy fields with a rotary tiller B. Primary tillage of upland paddy fields with a rotary tillers C. Primary tillage with a mould board plough D. Farm transportation work

Last Answer : A. Puddling of low land paddy fields with a rotary tiller

Description : Rotary tillers are characterized by a) Lower and negative draft b) High power requirement c) Excessive pulverization d) All the above

Last Answer : d) All the above

Description : pecific energy requirement of rotary tillers can be reduce by a) Increasing the bite length b) Decreasing depth to diameter ratio c) Both (a) and (b) d) Excessive reduction in total power requirement

Last Answer : c) Both (a) and (b)

Description : P,Q, & R can complete a piece of job together in 20 days. All the 3 started working at it together and after 8 days P left. Then Q & R together completed a job in 20 more days. P alone could complete the work in. a) 60 b) 50 c) 40 d) 30

Last Answer : B Work done by P,Q & R in 8 days = 1/20 * 8 =2/5 Remaining work = (1 - 2/5) = 3/5 Now 3/5 work is done by Q & R in 20 days Whole work will be done by Q & R in(20*5/3) =100/3 days (P+Q+R ... (Q+R)'s 1 day work =1/20 - 3/100 =5-3/100 =2/100 =1/50 P alone could complete the work in 50 days..

Description : P and Q can do a piece of job in 24 days; Q and R can do it in 30 days while R and P can finish it in 40 days. If P, Q, Rworks together, in how many days will they finish the job? In how many days will each ... finish it, working alone? A) 15,25,35,45 B) 20,30,40,120 C) 20,30,40,50 D) 20,25,30,60 

Last Answer : B Time taken by (P + Q) to finish the job = 24days. (P + Q)'s 1 day's job = 1/24 Time taken by (Q +R) to finish the job = 30days. (Q + R)'s 1 day's job = 1/30 Time taken by (R + P) to finish the ... - {(P + Q)'s 1 day's job } = (1/20 -1/24)=1/120 Hence, R alone can finish the job in 120 days.

Description : Marking on weld should be done which side? (i) Non gauge face side of A.T. weld * (ii) Gauge face side of A.T. weld (iii) On web of non gauge face side of A.T. weld (iv) On web of gauge face side of A.T. weld

Last Answer : (i) Non gauge face side of A.T. weld

Description : Name the paint used in A.T. Welding painting? (i) Black Paint (ii) Bituminous black IS:9862-1981.* (iii) Any type of black paint (iv) None of the above

Last Answer : (ii) Bituminous black IS:9862-1981.*

Description : Name the material which is separated from molten steel during chemical reaction of A.T welding? (i) Aluminium oxide (slag). * (ii) Ferrous Oxide (iii) Aluminium (iv) Ferrous

Last Answer : (i) Aluminium oxide (slag). *

Description : Calculate the power output in horsepower of an 80-kg man that climbs a flight of stairs 3.8 m high in 4.0 s.  a) 744.8 hp  b) 0.998 hp  c) 746 hp  d) 1.998 hp Formula: Power = Fd/t = mgh/t F = W = mg d = h

Last Answer : 0.998 hp

Description : If the SSE/SE/JE/ Br. working in the section is not readily available, another SSE/SE/JE may be authorised by …………….. to witness payment on the section. a) DEN b) SSE/SE/JE/ c) AEN (Bridges)* d) Office clerk

Last Answer : c) AEN (Bridges)

Description : At locations where access to the new bridge construction is available by rail, the launching of girders upto 18.3 m which method is ideal. a) slew in slew out method b) gantry method c) Launching of girders with the help of a BFR*: d) Pantoon method

Last Answer : c) Launching of girders with the help of a

Description : Callendar Hamilton spans are normally available maximum up to a) 60 ft. b) 100 ft. c) 150 ft. d) 200 ft.*

Last Answer : d) 200 ft.*

Description : Granite is obtained from a) Igneous rocks* b) Sedimentary rocks c) Metamorphic r

Last Answer : a) Igneous rocks*

Description : The minimum vertical clearance above R.L. to bottom of ROB near the yard shall be a) 6525 mm* b) 5870 mm c) 2360 mm d) 6250 mm

Last Answer : a) 6525 mm*