Cross slope of the formation to have good drainage of Ballast section is  a) 1 in 40*
b) 1 in 50
c) 1 in 30
d) 1 in 20

1 Answer

Answer :

a) 1 in 40*

Related questions

Description : In case of LWR track, full ballast section as specified in LWR Manual should be provided up to ……….. from the bridge abutment. a) 200 m b) 50 m c) 300 m d) 100 m*

Last Answer : d) 100 m

Description : Formation width for cuttings for B.G. single line section is (a) 5.40 m (b) 6.20 m (c) 6.25 m* (d) 6.50 m

Last Answer : (c) 6.25 m*

Description : For laying a Railway track the prepared surface ready to receive the ballast is called a) Sub ballast b) Formation* c) Blanket d) Cushion

Last Answer : b) Formation*

Description : 1. Which of the statements with regard to formation is correct (1) One of the Functions of the formation is to facilitate drainage (2) Width of bank for double railway line is 12.155 meters (3) Width of cutting for double railway track is 11. ... a) 2, 3, 5 b) 3, 4, 5* c) 2, 3, 4 d) 2, 4, 5

Last Answer : b) 3, 4, 5*

Description : Rails used for A T Welding shall not normally be welded? (i) 20 years old . (ii) 30 years old (iii) 40 years old (iv) 50 years old*

Last Answer : iv) 50 years old*

Description : Formation width for bank for M.G. double line section is (a) 8.50 m (b) 8.84 m (c) 9.65 m (d) 9.81 m*

Last Answer : (d) 9.81 m*

Description : Formation width for banks for B.G. single line section is (a) 6.10 m (b) 6.50 m (c) 6.85 m* (d) 7.0 m

Last Answer : (c) 6.85 m*

Description : Tilting of rails is done at a slope of a. 1 in 30 b. 1 in 25 c. 1 in 20* d. 1 in 15

Last Answer : c. 1 in 20*

Description : Stone generally preferred for railway ballast is a) Sandstone b) Dolomite c) Marble d) Basalt or trap granite*

Last Answer : d) Basalt or trap granite*

Description : Wing walls and return walls are provided to retain a) earth on approaches b) ballast c) track on approaches d) none

Last Answer : a) earth on approaches

Description : Track structure for CC+8 t+ 2 t loaded trains is:- (a) 52 Kg 90 UTS;PSC 1540 sleepers/ Km.; 250 mm ballast. (b) 60 Kg 90 UTS;PSC 1660 sleepers/ Km.; 300 mm ballast.* (c) 52 Kg 72 UTS;PSC 1540 sleepers/ Km.; 300 mm ballast. (d) 90 R;PSC 1340 sleepers/ Km.; 250 mm ballast.

Last Answer : b) 60 Kg 90 UTS;PSC 1660 sleepers/ Km.; 300 mm ballast.*

Description : Minimum depth of ballast cushion below the bottom of sleeper at the rail seat on BG group A route should be :- (a) 350 mm. (b) 250 mm. (c) 300 mm.* (d) 325 mm.

Last Answer : (c) 300 mm.*

Description : The side slope of formation in embankment /cutting depends on a) Shearing strength of soil and its angle of repose* b) Angle of repose c) Bearing capacity of the soil d) Optimum moisture content of the soil

Last Answer : a) Shearing strength of soil and its angle of repose*

Description : The side slope of formation in embankment is a) 2 : 1* b) 1: 1 c) 1:5 d) 1:3

Last Answer : a) 2 : 1*

Description : For effective drainage, the finished surface of flat roof should have a minimum slope of (A) 1 in 20 (B) 1 to 50 (C) 1 in 10 (D) 1 in 5

Last Answer : Answer: Option A

Description : Height of crucible is kept from top surface of mould? (i) 30 mm (ii) 40 mm (iii) 50 mm* (iv) 60 mm

Last Answer : (iii) 50 mm*

Description : There should not be any combination joint on level crossing proper and its approaches up to a) 15 meters b) 30 meters c) 40 meters d) 50 meters

Last Answer : d) 50 meters

Description : Elastomeric bearings are made of natural or synthetic rubber of shore hardness of approximately. a) 30 to 40 b) 50 to 70* c) 40 to 50 d) 60 to 70

Last Answer : b) 50 to 70

Description : Speed restriction required for using CC cribs as temporary arrangement is a) 20 kmph* b) 40 kmph c) 35 kmph d) 30 kmph

Last Answer : a) 20 kmph*

Description : What is speed restriction on deep screening site done by BCM and tamped by machine followed with DGS? (a) 20 (b) 30 (c) 40* (d) 10

Last Answer : (c) 40*

Description : If h1 and h2 are the differences in level between ground and the formation levels, m is the slope of the sloping sides. D is the distance between the cross sections then, Prismoidal correction for a level section is (A) D/2m(h1 - h2) (B) D/3m(h1 - h2) (C) D/6m(h1 - h2)2 (D) D/6m(h1 - h2)3

Last Answer : (C) D/6m(h1 - h2)2

Description : If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is (A) B + d + Sd (B) Bd + Sd2 (C) B × d - Sd1/2 (D) ½ (Bd + Sd2

Last Answer : (B) Bd + Sd2

Description : The centre to centre spacing formation width for double line section is (a) 4725 mm (b) 5025 (c) 5330* (d) 5500

Last Answer : c) 5330*

Description : Formation width for bank for B.G. double line section is (a) 10.82 m (b) 11.0 m (c) 11.58 m (d) 12.155 m*

Last Answer : (d) 12.155 m*

Description : A four wheel truck or whose operating weight is 12000 kg is pulled along a road having a rising slope of 2% at a uniform speed. Assume grade resistance factor = 10 kg/tonne. The tension in the tow cable is 720 kg. The ... will be (A) 20 kg/tonne (B) 30 kg/tonne (C) 40 kg/tonne (D) 50 kg/tonne

Last Answer : (C) 40 kg/tonne

Description : Duration of lone Hooter is: (a) 20 seconds (b) 25 seconds (c) 30 seconds* (d) 50 seconds

Last Answer : (c) 30 seconds*

Description : For rolling mark 60 kg/Sail/X/2010 the first testing in the field after initial testing of rails in rail manufacturing plant, will be done. (i) After test free period of 25%. (ii) After passage of every 40 ... period.* (iii) After passage of 200 GMT. (iv) On the basis of annual GMT of the section.

Last Answer : (ii) After passage of every 40 GMT traffic during test free period.*

Description : The bottom of side drains should be below the formation level by at least------------ a) 45 cm b )30 cm* c) 15 cm d) 60 cm

Last Answer : b )30 cm*

Description : In a temporary signaling arrangements for a bridge work in BG section, speed board shall be placed in advance of 30 m from the a) C.L. of the bridge b) Termination Board c) Start of the bridge/work spot* d) Caution Board

Last Answer : c) Start of the bridge/work spot*

Description : .In a temporary signaling arrangements for a bridge work in BG section, caution board shall be placed in advance of ……. m from start of the bridge/ work spot. a) 30 m b) 1200 m* c) 677 m d) 1000 m

Last Answer : b) 1200 m*

Description : Cross sectional area of catch water drain should not be more than a) 0 .75 square meter* b) 0. 90 square meter c) 0. 80 square meter d). 50 square meter

Last Answer : a) 0 .75 square meter*

Description : Minimum rail section recommended for section having traffic more than 20 GMT is (a) 90 UTS (b) 52 Kg. (c) 60 Kg.* (d) None of the above.

Last Answer : (c) 60 Kg.

Description : What is the difference between rail flange of 60 kg & 52 rail section a. 20 mm b. 18 mm c. 14 mm* d. 16 mm

Last Answer : c. 14 mm

Description : Torch is kept at height from top surface of rail head? (i) 30 to 55 mm (ii) 35 to 40 mm (iii) 40 to 45 mm

Last Answer : (iii) 40 to 45 mm

Description : The shape factor of standard rolled beam section varies from  (A) 1.10 to 1.20  (B) 1.20 to 1.30  (C) 1.30 to 1.40  (D) 1.40 to 1.50 

Last Answer : (A) 1.10 to 1.20 

Description : Minimum depth of ballast prescribed of Broad Gauge trunk lines of Indian Railways, is A. 20 cm B. 25 cm C. 30 cm D. 35 cm

Last Answer : B [25 cm]

Description : Two linked genes a and b show 20% recombination. the individuals of a dihybrid cross between ++/++ × ab/ab shall show gametes (a) ++ : 80 : : ab : 20 (b) ++ : 50 : : ab : 50 (c) ++ : 40 : : ab : 40 : : + a : 10 : : + b : 10 (d) ++ : 30 : : ab : 30 : : + a : 20 : : + b : 20.

Last Answer : (c) ++ : 40 : : ab : 40 : : + a : 10 : : + b : 10

Description : From the distribution main of 40 mm size, number of service pipe of 20 mm size can be taken off are ------- a)3 B) 6* c) 10 d) 12

Last Answer : B) 6*

Description : Permissible speed of Turnout with 1 in 8.5 curved switches a. 40 kmph b. 25 kmph* c. 15 kmph d. 20 kmph

Last Answer : b. 25 kmph*

Description : Permissible speed of Turnout with 1 in 12 curved switches a. 40 kmph* b. 25 kmph c. 15 kmph d. 20 kmph

Last Answer : a. 40 kmph*

Description : A series of closely spaced contour lines represent a (a) Steep slope* (b) Gentle slope (c) Uniform slope (d) Plane surface

Last Answer : (a) Steep slope*

Description : Contour interval on a map sheet denotes (a) Vertical distance of contour lines above the datum plane (b) Vertical distance between two successive contour lines (c) Slope distance between two successive contour lines (d) Horizontal distance between two successive contour lines

Last Answer : (b) Vertical distance between two successive contour lines

Description : Last flag man is deputed at which distance from last detonator during protection of welding site . (i) 30 mts (ii) 50 mts (iii) 45 (iv) 60 mts

Last Answer : (iv) 60 mts

Description : Standard bag of cement in ……… kg a) 52 kg b) 30.5kg c) 10.7kg d) 50 kg*

Last Answer : d) 50 kg*

Description : Power tillers are popularly available in hp range of q. 6-12 hp r. 12-20 hp s. 1-6 hp t. 20-50 hp

Last Answer : q. 6-12 hp

Description : Size of cubicle of a booking office is kept as (a) 1.20 x 1.50 m (b) 1.50 x 1.20 m (c) 1.50 x 1.80 m (d) 1.80 x 1.50 m*

Last Answer : (d) 1.80 x 1.50 m*

Description : From distribution main of 50 mm size, number of service pipes of 15 mm size can be taken off are ------ a) 6 b)10 c) 12 e):20*

Last Answer : e):20*

Description : What is the time of removal the tensor from the newly executed A T Weld? (i) 15 minutes after pouring. (ii) 20 minutes after pouring* (iii) 25 minutes after pouring. (iv) 30 minutes after pouring.

Last Answer : (ii) 20 minutes after pouring*

Description : Thickness of Lining/Charge is kept? (i) 20 mm. (ii) 25 mm* (iii) 30 mm (iv) As decided by the site supervisor

Last Answer : (ii) 25 mm*

Description : After AT Welding First train is to be passed after ? (i) 20 Minutes from pouring of weld metal. (ii) 35 Minutes from pouring of weld metal. (iii) 30 Minutes from pouring of weld metal.* (iv) 25 Minutes from pouring of weld metal.

Last Answer : (iii) 30 Minutes from pouring of weld metal.*