Description : Implementing management measures to correct any variances, which may have occurred _____. a] Recording c] Checking b] Controlling. d] Allocating
Last Answer : controlling
Description : _____ energy costs to specific departments (energy/Accounting Centres) a] Recording c] Allocating b] Checking d] Determining
Last Answer : allocating
Description : _____ energy performance/ efficiency. a] Allocating c] Allocating b] Checking d] Determining
Last Answer : determining
Description : Particular M&T system will involve the following: a] Checking c] Determining b] Allocating d] All of the above
Last Answer : all of the above
Description : One of the following is not the element of energy monitoring & targeting system a) Recording the energy consumption b) comparing the energy consumption C)Controlling the energy consumption d) Reducing the production
Last Answer : Reducing the production
Description : 68. One of the following is not the element of energy monitoring & targeting system a) Recording the energy consumption b) Comparing the energy consumption c) Controlling the energy consumption d) Reducing the production
Description : The following is not an element of M & T system a) Recording b) Analyzing c) Controlling d) Complaining
Last Answer : Complaining
Description : _____one is not the essential elements of M&T system. a] Recording c] Analyzing b] Source d] Checking
Last Answer : source
Description : ____ energy consumption to an appropriate standard or benchmark. a] Setting target c] Comparing. b] Reporting d] Allocating
Last Answer : comparing
Description : ________ to reduce or control energy consumption. a] Determining c] Highlighting b] Recording d] Setting Targets
Last Answer : setting targets
Description : Desertification can be checked by – (1) plugging gullies (2) checking over-grazing (3) contour ploughing (4) forming shelter belts
Last Answer : (2) checking over-grazing Explanation: Overgrazing is the major cause of desertification worldwide. Plants of semi-arid areas are adapted to being eaten by sparsely scattered, large, ... food and water availability. Such regular stock movement prevented overgrazing of the fragile plant cover.
Description : If tube feeding is continuous, the placement of the feeding tube should be checked a) every shift. Each nurse caring for the patient is responsible for verifying that the tube is located ... is unnecessary to check placement. Even though the feedings are continuous, the placement must be assessed.
Last Answer : a) every shift. Each nurse caring for the patient is responsible for verifying that the tube is located in the proper area for continuous feeding.
Description : You have just checked a 1/500-ampere fuse with an ohmmeter and find it is open. Checking the replacement fuse shows the replacement fuse is open also. Why would the replacement fuse indicate open?
Last Answer : The ohmmeter causes more than 1/500 ampere through the fuse when you check the fuse, thus it opens the fuse.
Description : 65. While the nurse was checking the BP of the client, the wife was intently observing the nurse. The wife asks the nurse how to ensure accurate measurement of BP reading. Identify all the ... The client should rest quietly for 5 minutes before reading and can talk while BP is being checked
Last Answer : A. 1, 2, 3, and 4
Description : Desertification can be checked by (1) plugging gullies (2) checking over-grazing (3) contour ploughing (4) forming shelter belts
Last Answer : checking over-grazing
Description : A star rating, ranging from ________ in the asending order of energy efficiency.imp A) 1 to 4. C) 1 to 5 B) 1 to 6. D) 1 to 10
Last Answer : 1 to 5
Description : Higher the number of stars, ________ will be the efficiency or EER a) Lesser c) Greater b) Likewise e) average
Last Answer : Greater
Description : Traditionally, waste heat of low temperature range ________ has not been used for electricitygeneration despite efforts by ORC companies, mainly because the Carnot efficiency is rather low. a) 0-250 °C b) 0-150 °C c) 0-200 °C d) 0-120 °C
Last Answer : 0-120 °C
Description : The hyperboloid shape also aids in accelerating the upward convective air flow, improving ________ efficiency. • Performance • Cooling • Heating • All of the above
Last Answer : cooling
Description : Explain the different recording techniques used in method study. Also outline process chart for checking diameter of 50mm of shaft.
Last Answer : Different recording techniques used in method study: Process charts are used to record the data systematically so that none of the information needed for study and analysis is missed. A. Chart indicating ... area. However, there is no indication of the direction or speed of motion.
Description : A Project control system: 1. Monitors and controls the project's schedule, costs, scope, budgets etc 2. Is a mechanism which reacts to the current project status in order to endure ... 4. Is a system for controlling and executing project documentation in an uniform and timely manner
Last Answer : 1. Monitors and controls the project's schedule, costs, scope, budgets etc
Description : A mean for monitoring and controlling organization's strategic projects is A. Project Monitoring process B. Project Portfolio Process C. Project Portfolio Plan D. Project Portfolio Phase
Last Answer : B. Project Portfolio Process
Description : The inventory should ordinarily be maintained at the site of the dead stock and should be checked once in______ year by the ________ a) A year, Head of the circle b) Two year, Head of the office c) A year, head of the office/ any other office selected by the head of the circle d) None of these
Last Answer : c) A year, head of the office/ any other office selected by the head of the circle
Description : is the identification of energy consumption level, which is desirable as a management objective to work towards energy conservation a) Recording b) Targeting c) Analysing d) Monitoring
Last Answer : Targeting
Description : Comparing energy consumption to the set target on a regular basis is called as _____. a]Reporting c] Determining b] Recording d] monitoring
Last Answer : monitoring
Description : Explain the two types of memory management techniques, which are used for allocating memory. -Technology
Last Answer : Memory ManagementIt is the act of managing computer's primary memory or main memory. Main memory is a large array of words or bytes where each ward or byte has its ... your system configuration and requirement. Partitioned allocation divides primary memory of computer into multiple memory.
Description : What are the factors taken into consideration when allocating CPU to a process in o.s?
Last Answer : What are the factors taken into consideration when allocatingCPU to a process in o.s?
Description : Following is(are) the responsibility(ies) of the project manager. (A) Budgeting and cost control (B) Allocating resources (C) Tracking project expenditure
Last Answer : (C) Tracking project expenditure
Description : Shauna has recently been appointed as a project manager for Project SkyNorth, which is regarded as an important project in her organization. During the project planning meeting, ... b. Matrix organization c. Functional organization d. Projectized organization e. Hierarchical organization
Last Answer : d. Projectized organization
Description : Following is(are) the responsibility(ies) of the project manager. (A)Budgeting and cost control (B)Allocating resources (C)Tracking project expenditure (D)All of the above
Last Answer : (D)All of the above
Description : It is a process of ………………………… to develop computer that meets necessities a. Managing b. Allocating c. timing resources d. all the above
Last Answer : d. all the above
Description : In which of these areas might you face pressures? A. Working with colleagues from different functional areas within the organisation B. Meeting reporting deadlines C. Allocating bonuses D. all of the above
Last Answer : D. all of the above
Description : In which of these areas might you face pressures? A. Working with colleagues from different functional areas within the organisation B. Meeting reporting deadlines C. Allocating bonuses D. All of the above
Last Answer : D. All of the above
Description : ___________ involves allocating resources by detailing what activities haveto be done, the order in which they are to be completed, who is to do each,and when they are to be complete(d) (a) Benchmarking ; (b) Budgeting ; (c) Scheduling ; (d) Competitor intelligence
Last Answer : (b) Budgeting ;
Description : Allocating extrinsic rewards for behaviour that has been previously intrinsically rewarded tends to decrease the overall level of motivation, and is called: (a) Reward Evaluation Theory ; (b) Extrinsic Evaluation Theory ; (c) Cognitive Evaluation Theory (d) Intrinsic Evaluation Theory
Last Answer : (c) Cognitive Evaluation Theory
Description : Rearranging and allocating space in memory to provide for multiple computing tasks is called (1) Networking (2) Multiprogramming (3) Multitasking (4) Memory Management
Last Answer : Memory Management
Description : The main factor controlling a decision to increase the occlusal height of teeth for extensive oral reconstruction is whether, A. the inter occlusal distance will be physiologically ... the aesthetic appearance of the patient will improve sufficiently to warrant the planned reconstruction
Last Answer : A. the inter occlusal distance will be physiologically acceptable after treatment
Description : The main factor controlling a decision to increase the occlusal height of teeth for extensive oral reconstruction is whether, A. The inter occlusal distance will be physiologically ... . The aesthetic appearance of the patient will improve sufficiently to warrant the planned reconstruction
Last Answer : A. The inter occlusal distance will be physiologically acceptable after treatment
Description : The term ________ means that IP provides no error checking or tracking. IP assumes the unreliabilityof the underlying layers and does its best to get a transmission throughto its destination,but with ... ) reliable delivery B) connection-oriented delivery C) best-effort delivery D) noneof the above
Last Answer : best-effort delivery
Description : . ________ is the recording system which enables sender to leave messages for receiver by telephone. (a) E-Mail ; (b) Voice Mail ; (c) Videoconferencing ; (d) Teleconferencing
Last Answer : (b) Voice Mail ;
Description : The process of copying data from a memory location is called a.reading b.writing c.controlling d.hand shaking
Last Answer : a.reading
Description : The process of putting data into a storage location is called a.reading b.writing c.controlling d.hand shaking
Last Answer : b.writing
Description : Numerical control a.applies only to milling machines b.is a method for producing exact number of parts per hour c.is a method for controlling by means of set of instructions d.None of the mentioned
Last Answer : c.is a method for controlling by means of set of instructions
Description : What Are The Controlling Activities Of Maintenance Management Include?
Last Answer : Controlling activities of maintenance management include the following: 1. Work Control 2. Inventory Control 3. Cost Control 4. Quality Control. Work control is done using work order ... Control is done by the supervision and testing final outcomes following a predetermined control procedure.
Description : Which of the following is the process of the pre-processing stage? a.Remove support b.Checking 3D CAD data c.De-powdering loose material d.Dip in a binder to strengthen the part
Last Answer : b.Checking 3D CAD data
Description : ____ the result including any variances from the targets which have been set. a] Reporting c] Determining b] Recording d] Highlighting
Last Answer : reporting
Description : The percentage of energy saved at the current rate of use, compared to the reference year rate of use, is called a) Energy Utilization b) Energy Performance c) Energy Efficiency d) None
Last Answer : Energy Performance
Description : The percentage of energy saved at the current rate of use ,compared to the refference year rate of use is called…….. a) Energy Utilization b) Energy Performance c) Energy Efficiency d) None
Description : Future energy use is likely to vary if you change____ of your business a) Labour. b) Funds c) Aspects d) Efficiency
Last Answer : Aspects
Description : According to -energy audit means verification, monitoring, analysis of use of energy including submission of technical report containing recommendations for improving energy efficiency with cost benefit analysis ... act 2001 b) Industrial act 1946 c) Factory act 1947 d) none of act
Last Answer : Energy conservation act 2001