Which one of the major inputs for the economical developement of any country. A) management. B) Energy. C) Power. D) planning

1 Answer

Answer :

ENERGY

Related questions

Description : Energy is one of the major inputs for the _ _ _ of any country. A) Environmental developement. B) political development. C) Economical development. D) None of the above

Last Answer : Economical development.

Description : The major inputs for the economic development of any country is ____ A. Energy C. Energy management B. Energy audit D. Energy saving

Last Answer : Energy

Description : The fundamental goal of energy management is to produce_ _ _ . A) least cost and least environmental effect. B) economical management. C) goods and services. D) none of the above

Last Answer : goods and services.

Description : To balance the total energy inputs with its use which , serves to identify all the energy streams in a faculty is __ A. Energy management C. Energy saving B. Energy audit D. Energy

Last Answer : Energy management

Description : Correct objectives of energy audit a) Identifying the quality and cost of various energy inputs. b) Relating energy inputs and production output c) Highlighting wastage in major areas. d) All of the above.

Last Answer : All of the above

Description : _ is the key to a systematic approach for decision making in the area of energy management. A) Energy audit. B) Energy management. C) Management. D) Planning

Last Answer : Energy audit.

Description : Energy audit is the first step towards systematic effort for _____________. a) Realting energy inputs and production. C) Conversation of energy. b) Reducing the amount of energy input. D) None of the above. .

Last Answer : Conversation of energy

Description : Explain the following levels of planning in the regional economical development: -Geography

Last Answer : (i) Block Level Planning: In block-level planning, each district is divided into blocks consisting of about 100 villages with a population of about 60,000. This planning was aimed at ... secondly, the block level is Panchayat Samiti and thirdly the district level is called Zila Parishad.

Description : Out of electric heater and heat pump, which is economical in operation ?

Last Answer : Heat pump.

Description : The most economical channel section for the fluid flow is the one for which the discharge is maximum for a given cross-sectional area. Vertical velocity distribution in an open channel for laminar flow can be assumed to be (A) Parabolic (B) Hyperbolic (C) Straight line (D) None of these

Last Answer : (A) Parabolic

Description : Which of the following processes serve as inputs to each other?  A. Executing, and Monitoring and Controlling B. Executing and Closing C. Planning, and Monitoring and Controlling D. Executing and Initiation

Last Answer : A. Executing, and Monitoring and Controlling

Description : Need of farm mechanization is to... a) for timely operations of agriculture activities b) to increase the production and productivity of food grains. c) efficient utilisation of inputs, water and other natural resources. d) all of the above

Last Answer : all of the above

Description : Project management is the second major component of the planning phase of the  systems development life cycle (SDLC), and it includes three steps: creating the work  plan, staffing the project, and controlling and directing the project.

Last Answer : Ans: True

Description : What are the 5 major processes of project management?  A. Closing, Executing, Planning, Monitoring and Controlling, Initiating (Ans.)  B. Starting, Closing, Managing, Planning, ... Finishing, Monitoring and Controlling, Executing, Planning D. Starting, Finishing, Executing, Managing, Closing

Last Answer : A. Closing, Executing, Planning, Monitoring and Controlling, Initiating (Ans.)

Description : A prerequisite of effective time management is:  1. Knowing the dictated project completion date  2. Having the most advanced software package for project planning, scheduling and control  3. ... and the  person responsible for each of them  4. Having a well staffed scheduling department

Last Answer : 1. Knowing the dictated project completion date

Description : Which of the following represent the three major categories of risks faced by a business organisation? a) Business risks, personnel risks, budget risks b) Project risks, technical risks, ... ) Planning risks, technical risks, personnel risks d) Management risks, technical risks, design risks

Last Answer : b) Project risks, technical risks, business risks

Description : Which of the following inputs has the greatest potential to increase productivity? (a) labor ; (b) management ; (c) capital ; (d) None of the above 

Last Answer : (b) management ;

Description : In the case of developing country which sector assumes a critical importance in view of the ever increasing needs A. Energy sector C. Energy audit sector B. Energy management sector D. Energy saving sector

Last Answer : Energy sector

Description : Identify the major problem of Jhumming cultivation. (a) Single crop dominance (b) Modern inputs (c) High cost

Last Answer : Jhumming : The 'slash and burn' agriculture is known as 'Milpa' in Mexico and Central America, 'Conuco' ... inputs (c) High cost (d) Low production

Description : Energy is one of the major input for the economic development of any country. A) true B) false

Last Answer : TRUE

Description : Energy is one of the_ _ _ for the economic development of any country. A) minor input. B) major input. C) none of the above. D) all of the above

Last Answer :  major input

Description : Apart from the availability of raw material location of an industry is also dependent on the availability of: (1) enviornmental protection and vegetation (2) man power and energy source (3) transport and bio energy (4) water and inputs

Last Answer : (2) man power and energy source Explanation: Some of the factors which affect the industrial location are as follows: availability of raw materials, avail-ability of labour, availability of ... that is indispensable for industry. Besides, availability of power/electricity is also a deciding factor.

Description : Apart from the availability of raw material location of an industry is also dependent on the availability of: (1) enviornmental protection and vegetation (2) man power and energy source (3) transport and bio energy (4) water and inputs

Last Answer :  man power and energy source

Description : Energy audit is a kind of scientific management method of ...... a) Energy b) Power c) Force d) Fuel

Last Answer : Energy

Description : For rural electrification and domestic cooking, the most appropriate and economical would be (a) biogas (b) nuclear energy (c) electricity (d) wind mills

Last Answer : Ans:(a)

Description : If variable part of annual cost on account of interest and depreciation on the capital outlay is equal to the annual cost of electrical energy wasted in the conductors, the total annual cost will be minimum and the ... (b) Ohm's law (c) Kirchhoffs law (d) Faraday's law (e) none of the above

Last Answer : (a) Kelvin's law

Description : Are natural gas generators economical to power a house?

Last Answer : Home power generator is good solution during snowfall. Different kind of power generators are available. these generators basically varies in sizes depending upon the size of the home and the electrical appliances you want to lit on. choose the best one and buy. You can find them @ www.Amazon.com/

Description : The iron ore deposits of Dammel-Nissar is of high quality but why it is not excavated? A. Due to lack of men power B. Ore deposits is in low quantity C. Ore lies under hard rocks D. Not economical due to transportation problem

Last Answer : ANSWER: D

Description : The iron ore deposits of Dammel-Nissar is of high quality but why it is not excavated? A. Due to lack of men power B. Ore deposits is in low quantity C. Ore lies under hard rocks D. Not economical due to transportation problem

Last Answer : ANSWER: D

Description : To pump water from a water reservoir 3 m deep and maximum water level at 135 m, a pump is  installed to lift water up to R.L. 175 m at a constant rate of 36,00,000 litres per hour. If the length  of the ... the water horse power of the pump is  (A) 400  (B) 450  (C) 500 (D) 600

Last Answer : (D) 600

Description : The expanded production of fertilizers, textiles & buildings require some A. power production B. domestic production of the necessary capital goods C. economical growth D. none of these

Last Answer : B. domestic production of the necessary capital goods

Description : It is always economical to improve the power factor of an electric installation to (a) zero (b) unity (c) a little less than unity (d) a little more than unity 

Last Answer : To  a  little  less  than  unity.

Last Answer : For a consumer the most economical power factor is generally 0.95 lagging .

Description : Why is that my laptop (and my previous laptops) have always had power inputs on the left side and it seems that over the years invariably whatever outlet I need to plug into is on the right ?

Last Answer : answer:Observer bias-you notice annoying events more than convenient ones. I think an actual sidedness / asymmetry is highly unlikely here. Fwiw my lapop's power is on the right. Or you have left- ... ;) This problem won't go away until power becomes transmitted wirelessly, cutting the last wire'.

Description : Fundamental goal of_ _ _ is to produce goals and provide services. A) Energy audit. B) Management. C) Energy management. D) None of the above

Last Answer : Energy management.

Description : Energy audit is the key to a systematic approach for decision making in the area of_ _ _ A) Energy audit. B) Energy management. C) Management. D) All of the above

Last Answer : Energy management

Description : Definition of energy management given by _ _ _ . A) Cape hart B) Turner C) Kennedy. D) All of the above

Last Answer : All of the above

Description : The fundamental goal of energy management is to produce goods and provide services with_ _ _ A) least cost and least environmental effect. B) high cost and least environmental effect. C) least cost and least environmental effect. D) none of the above

Last Answer : least cost and least environmental effect

Description : To minimize energy cost " is an objective of which of the following a) Bureau of energy efficiency (BEE) b) Standard and labelling standard (HVAC) c) Energy Management d) None of the above

Last Answer : Energy Management 

Description : is the key to a systematic approach for decision making in the area of energy management. a) Energy Audit c) Energy management b) Efficiency d) None of the above

Last Answer : Energy Audit

Description : The tool used for performance assessment and logical evaluation of avenues for improvement in Energy management and audit is a) Fuel substitution c) Energy pricing b) Monitoring and verification d) Bench marking

Last Answer : Bench marking

Description : The Objective of Energy Management includes a. Minimising Energy Costs b. Minimising Environmental Degradation c. Minimissing waste d. All of the above

Last Answer :  All of the above

Description : system to reduce the amount of energy input into the system without negatively affecting the output(s)‖. Is the definition of? a. Energy conservation c. Energy policy b. Energy management d. Energy Audit

Last Answer : Energy Audit

Description : The objective of energy management includes a) Minimising energy costs b) Minimising waste c) Minimising environmental degradation d) All the above

Last Answer :  All the above

Description : The energy management function is generally vested in – (a) Senior Management (b) One energy manager or co-ordinator (c) Distributed among number of middle manager (d) (b) & (c) together

Last Answer : (b) & (c) together

Description : The judicious and effective use of energy to maximise profits and enhance competitive positions‖. This can be the definition of: a) Energy conservation b) Energy management c) Energy policy d) Energy Audit

Last Answer : Energy management

Description : The tool used for performance assessment and logical evaluation of avenues for improvement in Energy management and audit is a) Fuel substitution b) Monitoring and verification c) Energy pricing d) Bench marking 23. Infrared thermometer is used

Last Answer : Bench marking

Description : An energy policy does not include a) Target energy consumption reduction b) Time period for reduction c) Declaration of top management commitment d) Future production projection

Last Answer : Future production projection

Description : The objective of energy management includes a) Minimising energy costs b) Minimising waste c) Minimising environmental degradation d) All the above

Last Answer : all of the above

Description : is the Objective of the energy management from the following :- a) To give each product a label b) To evolve minimum energy consumption c) To minimize environmental effects d) To achieve optimum energy procurement

Last Answer :  To evolve minimum energy consumption