Gantt chart is used for : (A) inventory control (B) material handling (C) production schedule (D) machine repair schedules

1 Answer

Answer :

Gantt chart is used for :  production schedule

Related questions

Description : Which of the following is an advantage of a Gantt chart?

Last Answer : Need Answer

Description : What is a visual representation of a project’s planned activities against a calendar called? a. A Gantt chart. b. A critical path network. c. A product flow diagram. d. A Pareto chart.

Last Answer : a. A Gantt chart.

Description : If you would like to see a list of resources and the tasks that people are assigned to.  What view best displays this information?  A.Resource Sheet  B. Task Usage  C. Gantt Chart  D.: Resource Usage

Last Answer : C. Gantt Chart

Description : Risk Event Graph is having following on X axis  A.Gantt Chart  B.Work Break Down Structure  C.Project Life Cycle  D.Splitting

Last Answer : C.Project Life Cycle

Description : Creating a work plan requires three steps: identify the tasks that need to be  accomplished, estimate the time that it will take to complete the tasks, and record the task  completion time in a Gantt Chart.

Last Answer : Ans: False

Description : What is a visual representation of a project’s planned activities against a calendar called?  a. A Gantt chart.  b. A critical path network.  c. A product flow diagram.  d. A Pareto chart.

Last Answer : a. A Gantt chart.

Description : The statistical tool that depicts a project’s tasks and the relationships between those tasks is  known as (A) milestone (B) goal (C) Gantt chart (D) PERT chart

Last Answer : (D) PERT chart

Description : A horizontal bar chart that shows project tasks against a calendar is called (A) milestone (B) goal (C) Gantt chart (D) PERT chart

Last Answer : (C) Gantt chart

Description : A Gantt chart is used to show a project timeline diagrammatically. A. True B. Fa lse

Last Answer : A. True

Description : This/These Management Guru/s, formulated a bar chart that measures planned and completed work along each stage of project A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Henry Gant

Description : This/These Management Guru/s, formulated a bar chart that measures planned and completed work along each stage of project A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Henry Gantt

Description : Gantt chart (or Bar chart) is helpful in (A) Efficient utilisation of manpower and machines (B) Preparing production schedule (C) Efficient despatching of products (D) Inventory control

Last Answer : (B) Preparing production schedule

Description : A compact estimate about the amount of materials handling between various work stations is obtained from the (A) Gantt chart (B) Bin chart (C) String diagram (D) Travel chart

Last Answer : (D) Travel chart

Description : Time and progress chart of a construction, is also known as (A) Bar chart (B) Gantt chart (C) Modified Mile stone chart (D) All the above

Last Answer : (D) All the above

Description : What Is A Gantt Chart?

Last Answer : A Gantt Chart is a way of illustrating multiple, time-based activities on a horizontal time-line.

Description : Explain how Gantt chart is used in project planning with proper example. 

Last Answer : Use of Gantt Chart in Project Planning: Gantt Chart is a project planning tool that can be used to represent the timing of tasks required to complete a project. Because Gantt chats are simple to ... a chart, which are used to record the actual operating times and delays of workers and machines.

Description : Explain the GANTT chart used in PPC. Enlist advantages and disadvantages of it

Last Answer : Gantt chart used in production planning and control. Gantt Chart is a project planning tool that can be used to represent the timing of tasks required to complete a project. Because Gantt chats ... time to maintain. 4. Lack of adequate depiction interrelationship between the separate tasks.

Description : Explain GANTT chart and its application for project tracking with an example. 

Last Answer : When creating software project schedule, we begin with a set of tasks. If automated tools are used, the work breakdown is input as a task network or task outline. Effort, duration and start date are then ... can also use Gantt charts to get an overview of how things are rolling on the work front. 

Description : What is the default view of a new project in MS project?  A. Gantt View B. Resource Graph  C. Network View  D.: Workbook View

Last Answer : A. Gantt View

Description : Which of the following is displayed as an S curve?  A. Gantt B. Cost baseline C. Critical path D. Schedule baseline

Last Answer : B. Cost baseline

Description : This/These Management Guru/s, is known for ‘14 Principles of Management’ A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Henri Fayol

Description : This/These Management Guru/s, studied job motions in standardization and method study, observing bricklayers. A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Frank and Lillian Gilbreth

Description : This/These Management Guru/s, increased worker efficiency by redesigning shovels used by steel-workers A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Frederick Taylor

Description : Management Guru/s, is known for ‘14 Principles of Management’ A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Henri Fayol

Description : This/These Management Guru/s, studied job motions in standardization and method study, observing bricklayers. A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Frank and Lillian Gilbreth

Description : This/These Management Guru/s, increased worker efficiency by redesigning shovels used by steel-workers A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Frederick Taylor

Description : Gantt charts are used for streamlining the (A) Inventory control (B) Production schedule (C) Sales forecasting (D) Quality control

Last Answer : (B) Production schedule

Description : The most suitable refrigerant for a commercial ice plant is : (A) brine (B) NH3 (C) Freon (D) air

Last Answer : Ammonia NH3

Description : Dew point temperature is constant as long as there is : (A) no change in moisture content of the air (B) no change in volume of air (C) no change in dry bulb and wet bulb temperature (D) no change in relative and specific humidity of air

Last Answer : Dew point temperature is constant as long as there is : no change in moisture content of the air

Description : The comfort conditions in air conditioning are : (A) 22 ºC dry bulb temperature and 60% relative humidity (B) 25 ºC dry bulb temperature and 100% relative humidity (C) 20º C dry bulb temperature and 75% relative humidity (D) 15º C bulb temperature and 80% relative humidity

Last Answer : The comfort conditions in air conditioning are : 22 ºC dry bulb temperature and 60% relative humidity 

Description : Air is normally dehumidified by : (A) injecting water (B) passing steam (C) heating (D) cooling

Last Answer : 1

Description : A fluid in equilibrium cannot sustain : (A) tensile stress (B) compressive stress (C) shear stress (D) bending stress

Last Answer : A fluid in equilibrium cannot sustain : shear stress 

Description : Euler’s dimensionless number relates the following : (A) Inertial force and gravity (B) Viscous force and Inertial force (C) Pressure force and Inertial force (D) Pressure force and viscous force

Last Answer : Euler’s dimensionless number relates the following : Pressure force and Inertial force

Description : Power transmitted through a pipe is maximum when the loss of head due to friction is : (A) one-half of the total head supplied (B) one-third of the total head supplied (C) one-fourth of the total head supplied (D) zero

Last Answer : Power transmitted through a pipe is maximum when the loss of head due to friction is : one-third of the total head supplied 

Description : The efficiency of a centrifugal pump is maximum when its blades are : (A) straight (B) bent forward (C) bent backward (D) bent forward first and then backward

Last Answer : The efficiency of a centrifugal pump is maximum when its blades are : bent backward

Description :  In axial flow fans and turbines, fluid enters and leaves as follows : (A) radially, axially (B) axially, radially (C) axially, axially (D) radially, radially

Last Answer : In axial flow fans and turbines, fluid enters and leaves as follows : (A) radially, axially (B) axially, radially (C) axially, axially (D) radially, radially

Description : Military type of organisation is known as : (A) line organisation (B) functional organisation (C) line and staff organisation (D) line, staff and functional organisation 

Last Answer : Military type of organisation is known as : line organisation

Description : A systematic job improvement sequence will consist of : (A) motion study (B) time study (C) job enrichment (D) all of these

Last Answer : A systematic job improvement sequence will consist of : (A) motion study (B) time study (C) job enrichment (D) all of these

Description : Production cost refers to prime cost plus : (A) factory overheads (B) factory and administration overheads (C) factory, administration and sales overheads (D) factory, administration, sales overheads and profit

Last Answer : Production cost refers to prime cost plus : factory overheads

Description : In inventory control theory, the economic order quantity is : (A) average level of inventory (B) optimum lot size (C) capacity of a warehouse (D) lost size corresponding to break-even analysis

Last Answer : In inventory control theory, the economic order quantity is : optimum lot size 

Description : In value engineering, the term value refers to : (A) manufacturing cost of the product (B) selling price of the product (C) total cost of the product (D) utility of the product

Last Answer : In value engineering, the term value refers to : utility of the product

Description : The main object of scientific layout is : (A) to produce better quality of product (B) to utilise maximum floor area (C) to minimise production delays (D) all of these

Last Answer : The main object of scientific layout is : (A) to produce better quality of product (B) to utilise maximum floor area (C) to minimise production delays (D) all of these

Description :  A twist drill is a : (A) side cutting tool (B) front cutting tool (C) end cutting tool (D) none of these

Last Answer :  A twist drill is a : end cutting tool 

Description : Tool life is most affected by : (A) cutting speed (B) tool geometry (C) feed and depth (D) microstructure of material being cut

Last Answer : Tool life is most affected by : cutting speed 

Description : The usual ratio of forward and return stroke in shaper is : (A) 2:1 (B) 1:2 (C) 2:3 (D) 3:2

Last Answer : The usual ratio of forward and return stroke in shaper is :  3:2

Description : Binding material used in cemented carbide tools is : (A) Nickel (B) Cobalt (C) Chromium (D) Silicon

Last Answer : Binding material used in cemented carbide tools is : Cobalt 

Description : Angle between the shear plane and work surface is known as : (A) lip angle (B) rake angle (C) cutting angle (D) shear angle

Last Answer : Angle between the shear plane and work surface is known as : shear angle

Description : Material having highest cutting speed is : (A) Cast iron (B) Bronze (C) Aluminium (D) High carbon steel

Last Answer : Material having highest cutting speed is : Aluminium

Description : If the rotating mass of a rim type flywheel is distributed on another rim type flywheel whose mean radius is half the mean radius of the former, then the energy stored in the latter at the same speed will be : ... at the first one (C) One fourth of the first one (D) One and half times the first one

Last Answer : If the rotating mass of a rim type flywheel is distributed on another rim type flywheel whose mean radius is half the mean radius of the former, then the energy stored in the latter at the same speed will be : One fourth of the first one

Description : The train value of a gear train is : (A) equal to velocity ratio (B) reciprocal of velocity ratio (C) always greater than unity (D) none of the above

Last Answer : The train value of a gear train is : reciprocal of velocity ratio