Time and progress chart of a construction, is also known as
(A) Bar chart
(B) Gantt chart
(C) Modified Mile stone chart
(D) All the above

1 Answer

Answer :

(D) All the above

Related questions

Description : A horizontal bar chart that shows project tasks against a calendar is called (A) milestone (B) goal (C) Gantt chart (D) PERT chart

Last Answer : (C) Gantt chart

Description : This/These Management Guru/s, formulated a bar chart that measures planned and completed work along each stage of project A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Henry Gant

Description : This/These Management Guru/s, formulated a bar chart that measures planned and completed work along each stage of project A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Henry Gantt

Description : Gantt chart (or Bar chart) is helpful in (A) Efficient utilisation of manpower and machines (B) Preparing production schedule (C) Efficient despatching of products (D) Inventory control

Last Answer : (B) Preparing production schedule

Description : Consider the following statements: In the bar chart planning 1. Interdependence of the operations cannot be portrayed. 2. Progress of work can be measured. 3. Spare time of the activities can be determined. 4. ... and 4 are correct (C) 2, 3 and 4 are correct (D) 1, 2 and 4 are correct

Last Answer : (B) 1 and 4 are correct

Description : A bar chart is commonly used because (a) It is simple to draw and easy to understand (b) It indicates at a glance the overall progress of the project (c) It shows critical ... critical activities (d) It incorporates uncertainties for delay in estimation of time required for completion of activities.

Last Answer : (a) It is simple to draw and easy to understand

Description : Which of the following is a weakness of bar chart? (A) Interdependencies of activities (B) Project progress (C) Uncertainties (D) All of the above

Last Answer : (D) All of the above

Description : The statistical tool that depicts a project’s tasks and the relationships between those tasks is  known as (A) milestone (B) goal (C) Gantt chart (D) PERT chart

Last Answer : (D) PERT chart

Description : Creating a work plan requires three steps: identify the tasks that need to be  accomplished, estimate the time that it will take to complete the tasks, and record the task  completion time in a Gantt Chart.

Last Answer : Ans: False

Description : Which of the following is an advantage of a Gantt chart?

Last Answer : Need Answer

Description : What is a visual representation of a project’s planned activities against a calendar called? a. A Gantt chart. b. A critical path network. c. A product flow diagram. d. A Pareto chart.

Last Answer : a. A Gantt chart.

Description : If you would like to see a list of resources and the tasks that people are assigned to.  What view best displays this information?  A.Resource Sheet  B. Task Usage  C. Gantt Chart  D.: Resource Usage

Last Answer : C. Gantt Chart

Description : Risk Event Graph is having following on X axis  A.Gantt Chart  B.Work Break Down Structure  C.Project Life Cycle  D.Splitting

Last Answer : C.Project Life Cycle

Description : What is a visual representation of a project’s planned activities against a calendar called?  a. A Gantt chart.  b. A critical path network.  c. A product flow diagram.  d. A Pareto chart.

Last Answer : a. A Gantt chart.

Description : A Gantt chart is used to show a project timeline diagrammatically. A. True B. Fa lse

Last Answer : A. True

Description : A compact estimate about the amount of materials handling between various work stations is obtained from the (A) Gantt chart (B) Bin chart (C) String diagram (D) Travel chart

Last Answer : (D) Travel chart

Description : What Is A Gantt Chart?

Last Answer : A Gantt Chart is a way of illustrating multiple, time-based activities on a horizontal time-line.

Description : Explain how Gantt chart is used in project planning with proper example. 

Last Answer : Use of Gantt Chart in Project Planning: Gantt Chart is a project planning tool that can be used to represent the timing of tasks required to complete a project. Because Gantt chats are simple to ... a chart, which are used to record the actual operating times and delays of workers and machines.

Description : Explain the GANTT chart used in PPC. Enlist advantages and disadvantages of it

Last Answer : Gantt chart used in production planning and control. Gantt Chart is a project planning tool that can be used to represent the timing of tasks required to complete a project. Because Gantt chats ... time to maintain. 4. Lack of adequate depiction interrelationship between the separate tasks.

Description : Explain GANTT chart and its application for project tracking with an example. 

Last Answer : When creating software project schedule, we begin with a set of tasks. If automated tools are used, the work breakdown is input as a task network or task outline. Effort, duration and start date are then ... can also use Gantt charts to get an overview of how things are rolling on the work front. 

Description : Gantt chart is used for : (A) inventory control (B) material handling (C) production schedule (D) machine repair schedules

Last Answer : Gantt chart is used for :  production schedule

Description : Mile Stone charts were invented in the year of (A) 1910 (B) 1920 (C) 1930 (D) 194

Last Answer : (D) 1940

Description : Select the incorrect statement. (A) The progress of work in low level method of mound construction is very slow (B) Barge method of mound construction is economical (C) In low level method ... (D) In staging method of mound construction, the work is not interrupted even during stormy weather

Last Answer : (B) Barge method of mound construction is economical

Description : The first method invented for planning projects, was (A) Bar chart method (B) Milestone chart (C) Critical path method (CPM) (D) Programme Evaluation and Review Technique (PERT)

Last Answer : (A) Bar chart method

Description : For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is (A) 1 (B) 2 (C) 3 (D) 4

Last Answer : (A) 1

Description : Pick up the incorrect statement from the following: (A) The various functions under each activity, are shown by one bar on Bar Charts (B) Bar chart establishes the interdependency of one event on another (C) Only approximate percentage of the completed work is reported (D) None of these

Last Answer : (B) Bar chart establishes the interdependency of one event on another

Description : Critical path method (A) Is an improvement upon bar chart method (B) Provides a realistic approach to daily problems (C) Avoids delays which are very common in bar charts (D) All the above

Last Answer : (D) All the above

Description : For the construction of buildings, the subheads of the estimate are (A) Earthwork, Concrete work, Brick work (B) Brickwork, Stone work, Roofing (C) Brickwork Flooring, Wood work, Steel work (D) All the above

Last Answer : (D) All the above

Description : Pick up the correct statement from the following: (A) Acid test is done to find out the weathering quality of stones (B) Attrition test is done to find out the rate of wear of stones which are used ... (C) Crushing test is done to find out the compressive strength of the stone (D) All the above

Last Answer : Answer: Option D

Description : Which of the following stone is best suited for construction of piers and abutments of a railway bridge? (A) Granite (B) Sand stone (C) Lime stone (D) Quartze

Last Answer : Answer: Option A

Description : The pressure acting on the stones in stone masonry construction should be (A) Along the direction of bedding planes (B) At 45° to the direction of bedding planes (C) At 60° to the direction of bedding planes (D) Perpendicular to the direction of bedding planes

Last Answer : Answer: Option D

Description : Which of the following is the unit of distance in navigation? (1) Knot (2) Nautical mile (3) Bar (4) Angstrom

Last Answer : (2) Nautical mile Explanation: A nautical mile is based on the circumference of the earth, and is equal to one minute of latitude. It is slightly more than a statute (land measured) mile (1nautical mile = 1.1508 statute miles).

Description : Am I responsible for lawn damage to a home over 1/4 mile away (1/2 km) caused by a truck delivering construction materials to my house?

Last Answer : I’d say the truck’s insurance should fix it.

Description : The Gadsen purchase of 50,000 square mile of land was primarily for the construction of _________. (a) University Town (b) Railways (c) Canals

Last Answer : (b) Railways

Description : This/These Management Guru/s, is known for ‘14 Principles of Management’ A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Henri Fayol

Description : Management Guru/s, is known for ‘14 Principles of Management’ A. Frederick Taylor B. Henry Gantt C. Frank and Lillian Gilbreth D. Henri Fayol

Last Answer : Henri Fayol

Description : Find the central angles of the components of a data given below, when represented in a pie chart ? `{:(bar("Component Food Education Rent Clothing Sav

Last Answer : Find the central angles of the components of a data given below, when represented in a pie chart ? `{:( ... Rs.) 3600 2400 2100 1200 1500 10800")):}`

Description : If a bar chart showed that 4 students received an A on the test 3 students received a B and 1 student received a C the shortest bar on the chart would be for the B column.?

Last Answer : No, the shortest bar would be C

Description : If a bar chart consists of one or more hortizontal barswhat does a column chart consist of?

Last Answer : Feel Free to Answer

Description : What is created when you use F11 shortcut key while creating a chart in MS Excel: a) A default chart b) A 2 dimensional column chart c) A 2 dimensional bar chart d) A 3 dimensional line chart e) None of The Above

Last Answer : b) A 2 dimensional column chart

Description : When to use percentage component bar chart?

Last Answer : Ans: We use percentage component bar chart when we want to make the comparison in components holding the difference of total constants.

Description : When you prefer to use component bar chart?

Last Answer : Ans: Component bar chart is preferred when the total magnitude of data is subdivided into different parts or components.

Description : Give preference to use multiple bar chart.

Last Answer : Ans: It is easy to understand and in more than one variable it is convenient way to express the data simply while simple bar chart is only suitable for one variable.

Description : When we use simple bar chart, multiple bar chart, component bar chart & percentage component bar chart?

Last Answer : Ans: A simple bar chart is used when there is only one variable classified on spatial, qualitative or temporal, in more than one interrelated variables we sue multiple bar chart, simple component ... is used when we want to make a comparison in components holding the difference of total constants.

Description : 89. Each vertical bar in cusum status chart represents a) The value of Ci+ and Ci– b) The value of Ci– c) The value of Ci+ d) Neither the value of Ci+ nor Ci–

Last Answer : The value of Ci+ and Ci–

Description : 84. Each vertical bar in cusum status chart represents a) The value of Ci+ and Ci– b) The value of Ci– c) The value of Ci+ d) Neither the value of Ci+ nor Ci–

Last Answer : The value of Ci+ and Ci–

Description : The energy data entered into____ a) spreadsheet. b) bar chart c) histogram d) all of the above

Last Answer : spreadsheet

Description : what is the next step of monitoring process? a) visual presentation. b) Bar chart c) study and analysis. d) none of the above

Last Answer : bar chart

Description : What is the default view of a new project in MS project?  A. Gantt View B. Resource Graph  C. Network View  D.: Workbook View

Last Answer : A. Gantt View

Description : Which of the following is displayed as an S curve?  A. Gantt B. Cost baseline C. Critical path D. Schedule baseline

Last Answer : B. Cost baseline