Pick up the correct statement from the following:
(A) The breakwater which can be used as a platform for loading and unloading of cargo is called
a mole
(B) The brick masonry retaining wall which is used for loading and unloading of cargo is called
quay wall
(C) Three types of break waters are generally provided in harbours
(D) All of the above

1 Answer

Answer :

(D) All of the above

Related questions

Description : Pick up the correct statement from the following: (A) An artificial barrier which makes the enclosed area safe for anchorage of ships, is known as break water (B) The break water whose inside is used ... wall is governed by the length of the largest vessel likely to be berthed (D) All the above

Last Answer : (D) All the above

Description : A dock: (A) Is a marine structure for berthing of vessels for loading and unloading cargo and passengers (B) Is provided with a dock gate (C) Is provided with an arrangement to pump out water when required (D) All the above

Last Answer : (D) All the above

Description : Pick up the correct statement from the following: (A) A mortar joint having a concave finishing in brick masonry, is called keyed joint (B) A mortar joint projecting beyond the face of a masonry wall, is ... (C) A mortar joint having a recess in it, is called ruled joint (D) All the above

Last Answer : Option D

Description : Find the correct statement from the followings. (a) For a cantilever slab, the ratio of span to overall depth should not 12. (b) One way slab which carry uniformly distributed load should be designed to ... be designed to resist a hogging moment at the face of the support. (d) All of the above.

Last Answer : (d) All of the above.

Description : Pick up the correct statement from the following: (A) English bond is used for brick masonry to support heavy loads (B) Double-Flemish bond is suitable for brick masonry to give uniform face ... The stretcher bond is used for the construction of half brick masonry brick (D) All the above

Last Answer : Answer: Option D

Description : The position of the neutral axis in reinforced brick masonry is independent of the loading and is at a depth of

Last Answer : (a) One-third of the effective depth

Description : Pick up the incorrect statement from the following: (A) In the stem of a retaining wall, reinforcement is provided near the earth side (B) In the toe slab of a retaining wall, reinforcement is ... slab of a retaining wall, reinforcement is provided at the top of the slab (D) None of these

Last Answer : Answer: Option D

Description : Pick up the incorrect statement from the following: (A) The retaining wall should be structurally capable to resist the applied earth pressure (B) The section of the retaining wall should be so ... off water from the earth retained, weep holes are provided near the top of the retaining wall

Last Answer : Answer: Option D

Description : Weep holes are provided in retaining and breast walls (A) To drain off the water from the filling (B) To ventilate the stone masonry (C) To add architectural beauty (D) To increase compaction of the earth retained

Last Answer : Answer: Option A

Description : The thickness of base slab of a retaining wall generally provided, is (A) One half of the width of the stem at the bottom (B) One-third of the width of the stem at the bottom (C) One fourth of the width of the steam at the bottom (D) Width of the stem at the bottom

Last Answer : Answer: Option D

Description : The type of bond provided in brick masonry for carrying heavy loads is (A) Single Flemish bond (B) Double Flemish bond (C) English bond (D) Zigzag bond

Last Answer : Answer: Option C

Description : The stretcher bond in brick masonry can be used only when the thickness of wall is (A) 90 mm (B) 180 mm (C) 190 mm (D) 280 mm

Last Answer : Answer: Option A

Description : The frog of the brick in a brick masonry is generally kept on (A) Bottom face (B) Top face (C) Shorter side (D) Longer side

Last Answer : Answer: Option B

Description : In which of the following operations Continuous Path System is used (A) Pick and Place (B) Loading and Unloading (C) Continuous welding

Last Answer : C

Description : The main reinforcement in the toe of a T-shaped R C. retaining wall is provided on (i) Top face parallel to the wall (ii) Top face perpendicular to the wall (iii) Bottom face parallel to the wall (iv) ... (i) and (ii) are correct (C) (iii) and (iv) are correct (D) Only (iv) is correct

Last Answer : Answer: Option D

Description : In the design of a front counterfort in a counterfort retaining wall, the main reinforcement is provided on (i) Bottom face near counterfort (ii) Top face near counterfort (iii) Bottom face near centre of span (iv) Top ... ) (B) Only (ii) (C) Both (i) and (iv) (D) Both (ii) and (iii)

Last Answer : Answer: Option C

Description : In a counterfort retaining wall, the main reinforcement is provided on the (i) Bottom face in front counterfort (ii) Inclined face in front counterfort (iii) Bottom face in back counterfort (iv) Inclined face in back counterfort ... (B) (ii) and (iii) (C) (i) and (iv) (D) (iii) and (iv)

Last Answer : Answer: Option C

Description : Pick up the correct statement from the following: (A) A combined footing is so proportioned that centre of gravity of supporting area coincides with centre of gravity of two column loads (B) A ... in shape (C) Trapezoidal shaped footings may be provided under any loading (D) All the above

Last Answer : Answer: Option D

Description : What should be done to ensure that you are at the correct job assignment before loading or unloading?

Last Answer : Feel Free to Answer

Description : When a wave strikes a vertical breakwater in deep water, it is reflected back and on meeting another advancing wave of similar amplitude merges and rises vertically in a wall of water. This phenomenon is called (A) Surf (B) Clapotis (C) Fetch (D) Swell

Last Answer : (B) Clapotis

Description : A heavy stone is suitable for (A) Arches (B) Rubble masonry (C) Roads (D) Retaining walls

Last Answer : Answer: Option D

Description : Draw a neat labeled sectional view showing different components of building from foundation to parapet, for a load bearing brick masonry wall.

Last Answer : Draw a neat labeled sectional view showing different components of building from foundation to parapet, for a load bearing brick masonry wall.

Description : As compared to wall type breakwater, mound type breakwater (A) Requires skilled labour (B) Requires low maintenance cost (C) Requires less material (D) Results in less damage due to gradual failure

Last Answer : (D) Results in less damage due to gradual failure

Description : Pick out the wrong statement. (A) Packed towers are preferred for vacuum operation, because the pressure drop through the packing is less and they (packings) also lessen the ... of liquid, problem of channelling, loading & flooding is generally encountered in packed towers

Last Answer : (C) Diameter of randomly packed tower is normally more than 1.2 metres

Description : If H is the height of the wave expected, then the height of the breakwater is generally taken as (A) 1.2 H to 1.25 H above the datum (B) 1.2 H to 1.25 H above the low water level (C) 1.2 H to 1.25 H above the high water level (D) 1.2 H to 1.25 H above the mean sea level

Last Answer : (C) 1.2 H to 1.25 H above the high water level

Description : Expansion Joints in masonry walls are provided in wall lengths usater than (A) 10 m (B) 20 m (C) 30 m (D) 40 m

Last Answer : Answer: Option D

Description : An ideal ware house, is provided (A) Water proof masonry walls (B) Water proof roof (C) Few windows which remain generally closed (D) All the above

Last Answer : Answer: Option D

Description : If is the overall height of a retaining wall retaining a surcharge, the width of the base slab usually provided, is (A) 0.3 H (B) 0.4 H (C) 0.5 H (D) 0.7 H

Last Answer : Answer: Option D

Description : Parapet walls along hill roads, are provided (A) To retain the back filling (B) To prevent the hill from sliding (C) To prevent the wheels of the vehicle from coming on the retaining wall (D) None of these

Last Answer : Answer: Option C

Description : The main reinforcement in the heel of a T-shaped R.C. retaining wall is provided on (A) Top face perpendicular to wall (B) Bottom face perpendicular to wall (C) Both top and bottom faces perpendicular to wall (D) None of these

Last Answer : Answer: Option A

Description : In a counterfort retaining wall, the main reinforcement in the stem at mid span is provided on (A) Front face only (B) Inner face only (C) Both front face and inner face (D) None of the above

Last Answer : Answer: Option A

Description : The temperature reinforcement in the vertical slab of a T-shaped R.C. retaining wall is (A) Not needed (B) Provided equally on inner and front faces (C) Provided more on inner face than on front face (D) Provided more on front face than on inner face

Last Answer : Answer: Option D

Description : The stepped structure provided for lateral support of a structure, is (A) Retaining wall (B) Breast wall (C) Buttress (D) Parapet wall

Last Answer : Answer: Option C

Description : Construction joints are generally provided in concrete (A) Roads (B) Retaining walls (C) Lining of canals (D) All the above

Last Answer : Answer: Option D

Description : Which one of the following activities is not correct as applicable to brick corbels? (A) The maximum projection of the corbel should not be more than the thickness of the wall (B) The ... to carry heavy concentrated loads (D) Stretcher bond is generally used for the construction of brick corbel

Last Answer : Answer: Option D

Description : The type of bond in a brick masonry containing alternate courses of stretchers and headers, is called (A) Flemish bond (B) English bond (C) Stretcher bond (D) Header bond

Last Answer : Answer: Option B

Description : Pick up the correct statement from the following:  (A) Deposition of calcium carbonate on the inside of the well pipe, causes incrustation of the  pipe  (B) Incrustation of the pipe reduces the discharge  (C) Acidic waters cause corrosion of the pipes  (D) All the above 

Last Answer : (D) All the above 

Description : From the following which is not the application of AGV. a.Truck loading and unloading b.To change the tool c.Material transfer d.Paper roll transfer

Last Answer : b.To change the tool

Description : From Which of the following is application of robot. (A) Welding (B) Machine loading & unloading (C) Both (A) & (B) (D) None of the above

Last Answer : C

Description : Electronic Stability Program is use to a) Assist in braking b) Reducing loss of traction c) Use in ECU d) for proper loading and unloading of weight in vehicle

Last Answer : b) Reducing loss of traction

Description : Which of these is not an essential feature of a market (a) Buyers ; (b) Sellers ; (c) Commodity ; (d) Building with loading and unloading facilities

Last Answer : (d) Building with loading and unloading facilities

Description : Pick up the correct statement from the following: (A) The artificial barrier constructed to enclose "n area for safe anchorage, is called break water (B) The smoothened surface at the top end of ... fending (C) The effective berthing lengths of inclined guays can be adjusted (D) All the above

Last Answer : (D) All the above

Description : Stucco paints are suitable for (A) Stone masonry (B) Brick walls (C) Both (A) and (B) (D) Neither (A) nor (B)

Last Answer : Answer: Option C

Description : For one cubic metre of brick masonry, number of bricks required, is (A) 400 (B) 425 (C) 450 (D) 500

Last Answer : Answer: Option D

Description : In brick masonry the bond produced by laying alternate headers and stretchers in each course is known as (A) English bond (B) Double Flemish bond (C) Zigzag bond (D) Single Flemish bond

Last Answer : Answer: Option B

Description : Number of bricks required for one cubic metre of brick masonry is (A) 400 (B) 450 (C) 500 (D) 550

Last Answer : Answer: Option C

Description : The strength of brick masonry in 1:6 cement mortar, is (A) 20 tonnes/m2 (B) 40 tonnes/m2 (C) 50 tonnes/m2 (D) 60 tonnes/m

Last Answer : Answer: Option C

Description : To obtain good bonding in brick masonry (A) First class bricks are used (B) Vertical joints in alternate courses are kept in plumb line (C) Bats are used where necessary (D) All the above

Last Answer : Option D

Description : The minimum strength of the mortar used in load bearing brick masonry, is (A) 50 N/cm2 (B) 100 N/cm2 (C) 150 N/cm2 (D) 200 N/cm2

Last Answer : : Option B