Pick up the incorrect statement from the following:
(A) In the stem of a retaining wall, reinforcement is provided near the earth side
(B) In the toe slab of a retaining wall, reinforcement is provided at the bottom of the slab
(C) In the heel slab of a retaining wall, reinforcement is provided at the top of the slab
(D) None of these

1 Answer

Answer :

Answer: Option D

Related questions

Description : The main reinforcement in the heel of a T-shaped R.C. retaining wall is provided on (A) Top face perpendicular to wall (B) Bottom face perpendicular to wall (C) Both top and bottom faces perpendicular to wall (D) None of these

Last Answer : Answer: Option A

Description : The main reinforcement in the toe of a T-shaped R C. retaining wall is provided on (i) Top face parallel to the wall (ii) Top face perpendicular to the wall (iii) Bottom face parallel to the wall (iv) ... (i) and (ii) are correct (C) (iii) and (iv) are correct (D) Only (iv) is correct

Last Answer : Answer: Option D

Description : Pick up the incorrect statement from the following: (A) The retaining wall should be structurally capable to resist the applied earth pressure (B) The section of the retaining wall should be so ... off water from the earth retained, weep holes are provided near the top of the retaining wall

Last Answer : Answer: Option D

Description : In the design of a front counterfort in a counterfort retaining wall, the main reinforcement is provided on (i) Bottom face near counterfort (ii) Top face near counterfort (iii) Bottom face near centre of span (iv) Top ... ) (B) Only (ii) (C) Both (i) and (iv) (D) Both (ii) and (iii)

Last Answer : Answer: Option C

Description : In a cantilever retaining wall without a heel slab (A) Thickness of the stem is kept same throughout (B) Base slab is made 10 cm thicker than the stem (C) Width of the base slab is kept 0.7 time the total height of the wall (D) All the above

Last Answer : Answer: Option D

Description : The thickness of base slab of a retaining wall generally provided, is (A) One half of the width of the stem at the bottom (B) One-third of the width of the stem at the bottom (C) One fourth of the width of the steam at the bottom (D) Width of the stem at the bottom

Last Answer : Answer: Option D

Description : The temperature reinforcement in the vertical slab of a T-shaped R.C. retaining wall is (A) Not needed (B) Provided equally on inner and front faces (C) Provided more on inner face than on front face (D) Provided more on front face than on inner face

Last Answer : Answer: Option D

Description : In a counterfort retaining wall, the main reinforcement in the stem at mid span is provided on (A) Front face only (B) Inner face only (C) Both front face and inner face (D) None of the above

Last Answer : Answer: Option A

Description : In a counterfort retaining wall, the main reinforcement is provided on the (i) Bottom face in front counterfort (ii) Inclined face in front counterfort (iii) Bottom face in back counterfort (iv) Inclined face in back counterfort ... (B) (ii) and (iii) (C) (i) and (iv) (D) (iii) and (iv)

Last Answer : Answer: Option C

Description : The design of heel slab of a retaining wall is based on the maximum bending moment due to: (A) Its own weight (B) Weight of the soil above it (C) Load of the surcharge, if any (D) All the above

Last Answer : Answer: Option D

Description : The stem of a cantilever retaining wall which retains earth level with top is 6 m. If the angle of repose and weight of the soil per cubic metre are 30° and 2000 kg respectively, the effective width of the stem at the bottom, is (A) 51.5 (B) 52.5 (C) 53.5 (D) 54.5

Last Answer : Answer: Option C

Description : The toe projection of foundation slabs is taken (A) As one third of the base (B) As one sixth of overall height of the wall (C) Equal to heel slab (D) Below ground surface

Last Answer : Answer: Option A

Description : The reinforcement in a continuous slab is provided (a) At the top of the slab portion over the intermediate supports. (b) At the bottom of the slab portion over the intermediate supports. (c) All the middle of the slab portion over the intermediate supports (d) All the above

Last Answer : (a) At the top of the slab portion over the intermediate supports.

Description : In T-shaped R C. retaining walls, the main reinforcement in the stem is provided on (A) The front face in one direction (B) The front face in both directions (C) The inner face in one direction (D) The inner face in both directions

Last Answer : Answer: Option C

Description : In counterfort retaining walls, the main reinforcement in the stem at support is (A) Not provided (B) Provided only on inner face (C) Provided only on front face (D) Provided both on inner and front faces

Last Answer : Answer: Option B

Description : In counterfort type retaining walls (i) The vertical slab is designed as a continuous slab (ii) The heel slab is designed as a continuous slab (iii) The vertical slab is designed as a cantilever (iv) The heel slab is designed ... (ii) (B) (i)and(iv) (C) (ii) and (iii) (D) (iii) and (iv)

Last Answer : Answer: Option A

Description : If is the overall height of a retaining wall retaining a surcharge, the width of the base slab usually provided, is (A) 0.3 H (B) 0.4 H (C) 0.5 H (D) 0.7 H

Last Answer : Answer: Option D

Description : Pick up the incorrect statement from the following: Tensile reinforcement bars of a rectangular beam (A) Are curtailed if not required to resist the bending moment (B) Are bent up at suitable ... to serve as shear reinforcement (D) Are maintained at bottom to provide at least local bond stress

Last Answer : Answer: Option C

Description : Pick up the correct statement from the following: (A) The breakwater which can be used as a platform for loading and unloading of cargo is called a mole (B) The brick masonry retaining wall which is ... wall (C) Three types of break waters are generally provided in harbours (D) All of the above

Last Answer : (D) All of the above

Description : In case the factor of safety against sliding is less than 1.5, a portion of slab is constructed downwards at the end of the heel slab, which is known as (A) A key (B) A cut-off wall (C) A rib (D) All the above

Last Answer : Answer: Option D

Description : In a T-beam, the vertical distance between the bottom of the flange and the centre of the tensile reinforcement is (a) Breadth of flange (b) Thickness of flange (c) Breadth of slab (d) Depth of rib

Last Answer : (d) Depth of rib

Description : Distribution reinforcement in a simply supported slab, is provided to distribute (A) Load (B) Temperature stress (C) Shrinkage stress (D) All the above

Last Answer : Answer: Option D

Description : In a limit state method of design, when shear reinforcement is not provided, the calculated shear stress at the critical section of a slab shall not exceed; [ A ] Ks 0.25 v fck [ B ] ks 0.20 v fck [ C ] ks 0.16 v fck [ D ] ks 0.10 v fck

Last Answer : [ A ] Ks 0.25 v fck

Description : Pick up the incorrect statement from the following: (A) The bottom and top ends of slump mould are parallel to each other (B) The axis of the mould is perpendicular to the end faces (C) The ... clean and free from set cement (D) The mould is in the form of a frustum of hexagonal pyramid

Last Answer : Answer: Option D

Description : Pick up the incorrect statement from the following: (A) No deduction is made for the volume occupied by reinforcement (B) No deduction is made for the openings upto 0.1 sq.m (C) No deduction is made for volumes occupied by pipes, not exceeding 100 sq.cm in crosssection (D) None of these

Last Answer : (D) None of these

Description : Pick up the incorrect statement from the following: (A) Tresguet did not provide the top camber for the drainage of surface water (B) Tresguet provided the top camber for the drainage of surface ... (D) Macadam provided a camber to the formation at the dug-up state, to drain percolated water

Last Answer : Answer: Option A

Description : Pick up the incorrect statement regarding a master trap from the following: (A) It is provided in between the lower end of the house drain and the street sewer (B) It is provided a cleaning eye at the ... fitted at the top of the inlet pipe (D) The water seal is less than that of ordinary traps

Last Answer : (D) The water seal is less than that of ordinary traps

Description : The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as (A) Retaining wall (B) Breast wall (C) Parapet wall (D) None of the above

Last Answer : Answer: Option B

Description : Find the correct statement from the followings. (a) For a cantilever slab, the ratio of span to overall depth should not 12. (b) One way slab which carry uniformly distributed load should be designed to ... be designed to resist a hogging moment at the face of the support. (d) All of the above.

Last Answer : (d) All of the above.

Description : Pick up the correct statement from the following: (A) Lateral reinforcement in R.C.C. columns is provided to prevent the longitudinal reinforcement from buckling (B) Lateral reinforcement prevents ... Lateral reinforcement stops breaking away of concrete cover, due to buckling (D) All the above

Last Answer : Answer: Option D

Description : Which one of the following statements regarding septic tanks is wrong? A. A gap of 7.5 cm between the bottom of the covering slab and the top level of scum is provided B. The outlet invert level is kept ... . The minimum width of septic level is 90 cm D. The depth of tank is kept equal to its width

Last Answer : ANS: D

Description : Pick up the correct statement from the following: (A) The roof slabs of multi-storeyed buildings are constructed monolithically to carry the various floor loads (B) The beams of multi-storeyed ... slab is spanned across the secondary beams provided between the main beams (D) All of these

Last Answer : Answer: Option D

Description : When the reservoir is full, the maximum compressive force in a gravity dam is produced (A) At the toe (B) At the heel (C) Within the middle third of base (D) At centre of base

Last Answer : Answer: Option A

Description : The uplift pressure on the face of a drainage gallery in a dam is taken as (A) Hydrostatic pressure at toe (B) Average of hydrostatic pressure at toe and heel (C) Two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel (D) None of the above

Last Answer : Answer: Option C

Description : A rail which is tapered to a toe at one end and has a heel at the other end is called as : a) Stock rail b) Tongue rail c) Wing rail d) Lead rail

Last Answer : b) Tongue rail

Description : Which of the following statements is incorrect? (A) Minimum cross sectional area of longitudinal reinforcement in a column is 0.8% (B) Spacing of longitudinal bars measured along the periphery of ... (D) The number of longitudinal bars provided in a circular column should not be less than four

Last Answer : Answer: Option D

Description : Parapet walls along hill roads, are provided (A) To retain the back filling (B) To prevent the hill from sliding (C) To prevent the wheels of the vehicle from coming on the retaining wall (D) None of these

Last Answer : Answer: Option C

Description : The stepped structure provided for lateral support of a structure, is (A) Retaining wall (B) Breast wall (C) Buttress (D) Parapet wall

Last Answer : Answer: Option C

Description : An R.C.C. beam not provided with shear reinforcement may develop cracks in its bottom inclined roughly to the horizontal at (A) 25° (B) 35° (C) 45° (D) 55°

Last Answer : Answer: Option C

Description : Coulomb's wedge theory assumes that (A) Back fill is dry, cohesionless, homogeneous and isotropic (B) Slip surface is the plane which passes through the heel of the wall (C) Position and direction of the resultant earth pressure are known (D) All the above

Last Answer : (D) All the above

Description : The wall constructed for the stability of an excavated portion of a road on the hill side, is known as (A) Retaining wall (B) Breast wall (C) Parapet wall (D) All the above

Last Answer : Answer: Option B

Description : The wall constructed for the stability of a back filling portion of a road on the downhill side, is known as (A) Retaining wall (B) Breast wall (C) Parapet wall (D) All the above

Last Answer : Answer: Option A

Description : Weep holes are provided in retaining and breast walls (A) To drain off the water from the filling (B) To ventilate the stone masonry (C) To add architectural beauty (D) To increase compaction of the earth retained

Last Answer : Answer: Option A

Description : The effective depth of a T-beam is the distance between the (a) Centre of the flange and the top of the tensile reinforcement (b) Top of the flange and the centre of the tensile ... centre of the tensile reinforcement (d) Centre of the flange and the bottom centre of the tensile reinforcement

Last Answer : (b) Top of the flange and the centre of the tensile reinforcement

Description : In cement concrete pavements, tensile stress is due to: (A) Bending or deflection under wheel loads (B) Difference in temperature of the top and bottom of pavement (C) Contraction of slab during falling temperature (D) All the above

Last Answer : Answer: Option D

Description : Pick up the incorrect statement from the following: (A) Highways are always constructed in straight line (B) Highways may be provided horizontal curves (C) Highways may be provided vertical curves (D) Highways may be provided both horizontal and vertical curves

Last Answer : Answer: Option A

Description : Pick up the incorrect statement from the following: (A) In dog-legged stairs, no space between its flights is provided (B) In open newel stair, a rectangular well is provided (C) In ... forward and backward flights, is provided (D) In geometrical stair, two quarter space landing is provided

Last Answer : Answer: Option D

Description : Pick up the incorrect statement from the following: (A) Horizontal D.P.C. is provided at plinth level in internal walls (B) D.P.C. is provided under door and verandah openings (C) Vertical D.P.C. is not provided in internal walls (D) Cement concrete is a rigid damp-proofing material

Last Answer : Answer: Option B