A pile is being driven with a drop hammer weighing 1800 kg and having a free fall of 1.00 m. If the
penetration with last blow is 5 mm, the load carrying capacity of the pile, -according to the
Engineering News formula, is
(A) 100 tonnes
(B) 50 tonnes
(C) 20 tonnes
(D) 10 tonnes
penetration with last blow is 5 mm, the load carrying capacity of the pile, -according to the
Engineering News formula, is
(A) 100 tonnes
(B) 50 tonnes
(C) 20 tonnes
(D) 10 tonnes