For constructing a terrazzo floor, Pick up the incorrect statement from the following:
(A) A base course is prepared as in cement concrete flooring
(B) A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface
is made smooth by trowelling
(C) Glass strips are driven into the layer according to the pattern required
(D) After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with
soft material