In bridge widening projects, the method of stitching is normally employed for connecting existing deck to the new deck. What are the problems associated with this method in terms of shrinkage of concrete?

1 Answer

Answer :

In the method of stitching, it is a normal practice to construct the widening part of the bridge at first and let it stay undisturbed for several months. After that, concreting will then be carried out for the stitch between the existing deck and the new deck. In this way, the dead load of the widened part of bridge is supported by itself and loads arising from the newly constructed deck will not be transferred to the existing deck which is not designed to take up these extra loads.
One of the main concerns is the effect of stress induced by shrinkage of newly widened part of the bridge on the existing bridge. To address this problem, the widened part of the bridge is constructed a period of time (say 6­9 months) prior to stitching to the existing bridge so that  shrinkage  of the new  bridge will take place  within this  period and the effect of shrinkage stress exerted on the new bridge is minimized.
Traffic vibration on the existing bridge causes adverse effect to the freshly placed stitches. To solve this problem, rapid hardening cement is used for the stitching concrete so as to shorten the time of setting of concrete. Moreover, the stitching work is designed to be carried out at nights of least traffic (Saturday night) and the existing bridge may even be closed for several hours (e.g. 6 hours) to let the stitching works to left undisturbed.
Sometimes, longitudinal joints are used in connecting new bridge segments to existing bridges. The main problem associated with this design is the safety concern of vehicles. The change of frictional coefficients of bridge deck and longitudinal joints when vehicles change   traffic   lanes   is   very   dangerous   to   the   vehicles.   Moreover,   maintenance   of longitudinal joints in bridges is quite difficult.
Note: Stitching refers to formation of a segment of bridge deck between an existing bridge and a new bridge.

Related questions

Description : What is sucker deck principle for variable depth bridge decks?

Last Answer : For a variable depth bridge deck, the depth of continuous multi­span bridge deck is increased in pier supports and this absorbs sagging moments in the ... of arches and curved soffit rather than boring uniform deck alignment. Reference is made to Brian Pritchard (1992).

Description : In joints of precast concrete bridge segments, what are the functions of applying epoxy adhesive?

Last Answer : Epoxy adhesive is applied in these joints for the following purposes according to International Road Federation (1977): (i) It seals up the joints completely between precast concrete segments to protect the ... in transferring of shear between the joints in case a large single shear key is used.

Description : In incremental launching method of bridge construction, what are the measures adopted to enhance sufficient resistance of the superstructure during the launching process?

Last Answer : i) During the launching process the leading edge of the superstructure is subject to a large hogging moment. In this connection, steel launching nose typically about 0.6­0.65 times span length is ... . iii)For very long span bridge, temporary piers are provided to limit the cantilever moment.

Description : Should raking piles of a bridge abutment be placed under an embankment?

Last Answer : For a bridge abutment to be supported on raking piles with different orientations, the movement between the ground and the pile group is difficult to predict. For instance, if some of the raking ... experience severe bending moment and damage the piles as recommended by Dr. Edmund C Hambly (1979).

Description : In the design of a simply supported skew bridge, which direction of reinforcement should be provided?

Last Answer : In the conventional design of steel reinforcement for a simply supported skew bridge, a set of reinforcement is usually placed parallel to free edge while the other set is designed parallel ... ). In this way, considerable savings would be obtained from the orthogonal arrangement of reinforcement.

Description : In the construction of a two­span bridge (span length = L) by using span­by­span construction, why is a length of about 1.25L bridge segment is constructed in the first phase of construction?

Last Answer : Basically, there are mainly three reasons for this arrangement: (i) The permanent structure is a statically indeterminate structure. During construction by using span­by­span construction, if the ... 25L from the first pier where there is relatively more space to accommodate prestressing works.

Description : In a curved prestressed bridge, how should the guided bearings in piers of the curved region be oriented with respect to the fixed bearing in abutment?

Last Answer : To determine the orientation of guided bearings, one should understand the movement of curved region of a prestressed bridge. Movement of prestress and creep are tangential to the curvature of the ... large, temporary freedom of movement at the guided bearings has to be provided during construction.

Description : What is “preset” during installation of bridge bearings?

Last Answer : Preset is a method to reduce the size of upper plates of sliding bearings in order to save the material cost. The normal length of a upper bearing plate should be composed of the ... of a certain distance of sliding bearings with respect to upper bearing plates during installation of bearings.

Description : How do engineer determine the number of cells for concrete box girder bridges?

Last Answer : If the depth of a box girder bridge exceeds 1/6 or 1/5 of the bridge width, then it is recommended to be designed as a single cell box girder bridge. However, if the bridge depth is ... improvement in transverse load distribution when the number of cells of box girder is increased to three or more.

Description : Are diaphragms necessary in the design of concrete box girder bridges?

Last Answer : Diaphragms are adopted in concrete box girder bridges to transfer loads from bridge decks to bearings. Since the depth of diaphragms normally exceeds the width by two times, they are usually designed ... In fact, diaphragms also contribute to the provision of torsional restraint to the bridge deck.

Description : Sometimes the side of concrete bridges is observed to turn black in colour. What is the reason for this phenomenon?

Last Answer : In some cases, it may be due to the accumulation of dust and dirt. However, for the majority of such phenomenon, it is due to fungus or algae growth on concrete bridges. After rainfall, the ... help to solve this problem. Reference is made to Sandberg Consulting Engineers Report 18380/X/01.

Description : Polytetrafluoroethylene (PTFE) is commonly used in sliding bearings. Why?

Last Answer : The choice of sliding surface of bearings is of vital importance because the sliding surfaces generate frictional forces which are exerted on the bearings and substructure of the bridge. For ... be designed with dimples to avoid the lubricant from squeezing out under repeated translation movements.

Description : What are the shortcomings of grillage analysis which is commonly used in structural analysis of bridges?

Last Answer : Grillage analysis suffers from the following shortcomings based on E. C. Hambly: (i) For coarse mesh, torques may not be identical in orthogonal directions. Similarly, twists may differ in ... moment in an element depends on the curvatures in the beam's direction and its orthogonal direction.

Description : Under what situation should engineers use pot bearings instead of elastomeric bearings?

Last Answer : In the event of high vertical loads combined with large angle of rotations, rubber bearings are undesirable when compared with pot bearings. For instance, elastomeric ... bearings are better alternatives than elastomeric bearings in such an scenario as suggested by David J. Lee.

Description : What are the functions of grout inside tendon ducts?

Last Answer : Grout in prestressing works serves the following purposes: (i) Protect the tendon against corrosion. (ii) Improve the ultimate capacity of tendon. (iii) Provide a bond between the structural member and the tendon. (iv) In case of failure, the anchorage is not subject to all strain energy.

Description : Why is the span length ratio of end span/approach span to its neighboring inner spans usually about 0.75?

Last Answer : From aesthetic point of view, an odd number of spans with a decrease in length in the direction of abutment is desirable. Moreover, spans of equal length are found to be boring. However, the ... the last span in a continuous bridge while approach span refers top the first span of a bridge.

Description : What are the three major types of reinforcement used in prestressing?

Last Answer : i) Spalling reinforcement Spalling stresses are established behind the loaded area of anchor blocks and this causes breaking away of surface concrete. These stresses are induced by strain incompatibility with ... of action of the load. Reinforcement is needed to resist these lateral tensile forces.

Description : What is the advantage of sliding bearings over roller bearings?

Last Answer : In roller bearing for a given movement the roller bearing exhibit a change in pressure centre from its original position by one­half of its movement based on David J. Lee. However, with sliding ... built in the substructure. It follows that there is no change in pressure center after the movement.

Description : How to determine the size of elastomeric bearings?

Last Answer : For elastomeric bearing, the vertical load is resisted by its compression while shear resistance of the bearing controls the horizontal movements. The design ... and fatigue damage. The vertical stiffness of bearings is obtained by inserting sufficient number of steel plates.

Description : In the design of elastomeric bearings, why are steel plates inserted inside the bearings?

Last Answer : For elastomeric bearing to function as a soft spring, the bearing should be allowed for bulging laterally and the compression stiffness can be increased by limiting the amount of lateral bulging. To ... , the presence of metal plates does not affect the shear stiffness of the elastomeric bearings.

Description : In prestressing work, if more than one wire or strand is included in the same duct, why should all wires/strands be stressed at the same time?

Last Answer : If wires/strands are stressed individually inside the same duct, then those stressed strand/wires will bear against those unstressed ones and trap them. Therefore, the friction of the trapped wires is high and is undesirable.

Description : What are the advantages of assigning the central pier and the abutment as fixed piers?

Last Answer : (i) For abutment pier to be assigned as fixed pier while the bridge is quite long, the longitudinal loads due to earthquake are quite large. As the earthquake loads are resisted by fixed piers, the size of ... Therefore, the size of movement joints can be reduced significantly.

Description : Under what situation shall engineers use jacking at one end only and from both ends in prestressing work?

Last Answer : During prestressing operation at one end, frictional losses will occur and the prestressing force decreases along the length of tendon until reaching the other end. These frictional losses include the ... if the total span length is sufficiently long, jacking from both ends should be considered.

Description : Do you have any major tips on building a deck on the ground, with existing concrete base?

Last Answer : First you got to make sure that the ground is level. I would replace the concrete base of the patio deck. then you will have to decide if you want a wooden deck, structural plastic ( highly ... a base for ventilation so the wood wont rot. From there you can start building the posts and boards.

Description : After pre-stressing process is completed, a loss of stress is due to (A) Shrinkage of concrete (B) Elastic shortening of concrete (C) Creep of concrete (D) All the above

Last Answer : Answer: Option D

Description : If C is creep coefficient, f is original pre-stress in concrete, m is modular ratio, E is Young's modulus of steel and e is shrinkage strain, the combined effect of creep and shrinkage is: (A) (1 - C)mf - eE B) (C - 1)mf + eE (C) (C - 1)mf - eE (D) (1 - C)mf + eE

Last Answer : Answer: Option B

Description : A pre-stressed concrete member is preferred because (A) Its dimensions are not decided from the diagonal tensile stress (B) Large size of long beams carrying large shear force need not be adopted (C) Removal of cracks in the members due to shrinkage (D) All the above

Last Answer : Answer: Option D

Description : Curing (A) Reduces the shrinkage of concrete (B) Preserves the properties of concrete (C) Prevents the loss of water by evaporation (D) All of the above

Last Answer : (D) All of the above

Description : The shrinkage of concrete (A) Is proportional to water content is the mix (B) Is proportional to cement concrete (C) Increases with age of concrete (D) All the above

Last Answer : (D) All the above

Description : The effect of adding calcium chloride in concrete is (i) To increase shrinkage (ii) To decrease shrinkage (iii) To increase setting time (iv) To decrease setting time The correct answer is (A) (i) and (iii) (B) (i) and (iv) (C) (ii) and (iii) (D) (ii) and (iv)

Last Answer : (B) (i) and (iv)

Description : Approximate value of shrinkage strain in concrete, is (A) 0.003 (B) 0.0003 (C) 0.00003 (D) 0.0

Last Answer : Answer: Option B

Description : Shrinkage in concrete can be reduced by using (A) Low water cement ratio (B) Less cement in the concrete (C) Proper concrete mix (D) All the above

Last Answer : Answer: Option D

Description : The property of the ingredients to separate from each other while placing the concrete is called (A) Segregation (B) Compaction (C) Shrinkage (D) Bulking

Last Answer : Answer: Option A

Description : Which of the following losses of pre-stress occurs only in pre-tensioning and not in posttensioning? (A) Elastic shortening of concrete (B) Shrinkage of concrete (C) Creep of concrete (D) Loss due to friction

Last Answer : Answer: Option A

Description : Shrinkage of concrete depends upon (i) Humidity of atmosphere (ii) Passage of time (iii) Stress The correct answer is (A) (i) and (ii) (B) (ii) and (iii) (C) Only (iii) (D) All (i), (ii) an

Last Answer : Answer: Option A

Description : The lower water cement ratio in concrete, introduces (A) Smaller creep and shrinkage (B) Greater density and smaller permeability (C) Improved frost resistance (D) All the above

Last Answer : Answer: Option D

Description : Pick up the correct statement from the following: (A) Sand stones may be divided into calcareous, siliceous and ferruginous sand stones (B) Concrete using sand stones, cracks due to excessive shrinkage (C) Broken bricks produce a concrete having good fire resisting qualities (D) All the above

Last Answer : Answer: Option D

Description : In symmetrically reinforced sections, shrinkage stresses in concrete and steel are respectively (A) Compressive and tensile (B) Tensile and compressive (C) Both compressive (D) Both tensile

Last Answer : Answer: Option D

Description : Which one of the following statements is not correct with respect to PSC beams? (a) Loss due to shrinkage is proportional to water-cement ratio used in concrete (b) Loss due to creep is ... to the modulus of elasticity of concrete (d) Loss due to friction occurs in post tensioned concrete members

Last Answer : (c) Loss due to elastic deformation is directly proportionally to the modulus of elasticity of concrete

Description : The object of curing is to (a) Prevent the loss of water by evaporation. (b) Reduce the shrinkage of concrete (c) Preserve the properties of concrete (d) All of these

Last Answer : (d) All of these

Description : Minimum shear reinforcement is necessary to [ A ] Prevent brittle shear failure [ B ] Prevent failure due to shrinkage and thermal stresses [ C ] Hold the reinforcements in place while pouring concrete [ D ] All the above.

Last Answer : [ D ] All the above.

Description : Shrinkage of concrete is mostly influenced by [ A ] Environmental conditions [ B ] Size of member [ C ] Cement in concrete [ D ] The total amount of water present in concrete

Last Answer : [ D ] The total amount of water present in concrete

Description : The shrinkage strain of concrete is generally taken as [ A ] 0.3 [ B ] 0.03 [ C ] 0.003 [ D ] 0.0003

Last Answer : [ D ] 0.0003

Description : Shrinkage in concrete can be reduced by using (i) Low water cement ratio (ii) More amount of cement in the concrete (iii) Presaturated aggregates [ A ] i [ B ] i and ii [ C ] i and iii [ D ] i, ii and iii

Last Answer : [ C ] i and iii

Description : Slump cone test is used to determine [ A ] Shrinkage of concrete mix [ B ] Creep of concrete [ C ] Workability of concrete mix [ D ] Soundness of concrete

Last Answer : [ C ] Workability of concrete mix

Description : The process of keeping the concrete structure moist is called [ A ] Hydration [ B ] Curing [ C ] Creep [ D ] Shrinkage

Last Answer : [ B ] Curing

Description : The process of hardening of concrete in the presence of water is called [ A ] Creep [ B ] Hydration [ C ] Shrinkage [ D ] Curing

Last Answer : [ B ] Hydration

Description : Provisions for tattoos that are made with yarn under the skin and can be removed at any time ? I want to know if body stitching is a part of the forbidden change in God's creation ; Iblis has ... tattoos or eyebrow flakes ; Which are included in the aforesaid haram. I hope you will clear this issue.

Last Answer : answer:

Description : __________ gas is normally employed in B.E.T. method of finding out the surface area of catalyst. (A) N2 (B) H2 (C) CO2 (D) He

Last Answer : (A) N2

Description : Imagine you are working in an educational institution where people are of equal status. Which method of communication is best suited and normally employed in such a context? (A) Horizontal communication (B) Vertical communication (C) Corporate communication (D) Cross communication

Last Answer : (A) Horizontal communication