When paralleling two AC generators, the frequency of the incoming machine immediately prior to closing its breaker should be ____________.  A. controlled by placing the governor switch in the automatic position B. adjusted with the voltage regulator C. slightly greater than the bus frequency D. slightly less than the bus frequency

1 Answer

Answer :

Answer: C

Related questions

Description : When paralleling two AC generators, the frequency of the machine coming online, immediately prior to closing its breaker, should be ____________. A. slightly less than the oncoming generator frequency B. the ... bus frequency C. slightly greater than the bus frequency D. the same as the bus voltage

Last Answer : Answer: C

Description : Prior to closing the breaker when paralleling two AC generators, the recommended practice is to have the frequency of the incoming machine _____________. A. slightly less than the line frequency B. the same as the line frequency C. slightly greater than the line frequency D. all of the above

Last Answer : Answer: C

Description : When paralleling two AC generators, the frequency (cycles) of the incoming generator, just prior to closing the circuit breaker, should be _____________. A. slightly less than the frequency of the generator on ... C. slightly more than the frequency of the generator on the line D. all of the above

Last Answer : Answer: C

Description : You are attempting to parallel two AC generators and the synchroscope pointer stops at a position other than 0° prior to closing the circuit breaker. This indicates ___________. A. the frequency of ... be closed after breaker has been reset D. there is an existing cross current between generators

Last Answer : Answer: A

Description : Why is it a good practice to have the frequency of the incoming alternator adjusted slightly higher than that of the loaded alternator when paralleling two alternators? A. This allows the oncoming machine to ... line. C. The reverse power relay is prevented from activating. D. All of the above.

Last Answer : Answer: D

Description : You are attempting to parallel two AC generators and the synchroscope pointer stops at a position other than 0°. If you close the circuit breaker at this moment _____________. A. the incoming ... hazardous condition will be created by the incoming machine being at a higher frequency than the bus

Last Answer : Answer: C

Description : You are attempting to parallel two AC generators, and the synchroscope pointer is revolving fast in the clockwise direction. This indicates that the frequency of the incoming machine is _____________. A. higher ... at any pointer position D. the same as the bus frequency but out of phase with it

Last Answer : Answer: A

Description : You are attempting to parallel two AC generators, and the synchroscope pointer is revolving in the fast direction. This indicates that the frequency of the incoming machine is _____________. A. higher ... the same as the bus frequency and the circuit breaker may be closed at any pointer position

Last Answer : Answer: A

Description : You are attempting to parallel two AC generators and the synchroscope pointer is revolving in the slow direction. This indicates that the frequency of the incoming machine is _____________. A. higher than ... same as the bus frequency, and the circuit breaker may be closed at any pointer position

Last Answer : Answer: B

Description : Which of the synchroscope illustrations depicts the appropriate direction of rotation and position for closing the circuit breaker when paralleling AC generators? EL-0053 A. A B. B C. C D. D

Last Answer : Answer: D

Description : Equal power factors on paralleled AC generators are maintained by an automatic _____________. A. voltage regulator B. reverse power relay C. reverse current relay D. governor control switch

Last Answer : Answer: A

Description : When paralleling two alternators the synchronizing lamps grow dim and are totally darkened as the synchroscope pointer approaches the 0° position. This indicates the ____________. A. alternator voltages ... alternator is in phase with the bus voltage D. synchroscope pointer is defective or broken

Last Answer : Answer: C

Description : When paralleling two AC generators, the synchroscope selector switch and frequency meter switch should be set up to sense the frequency of the _____________. A. bus B. generator on the line C. oncoming generator D. bus transfer relay

Last Answer : Answer: C

Description : Prior to starting an AC generator prime mover, the voltage regulator cutout switch should be placed in the __________. A. manual position B. bus neutral position C. raise voltage position D. transfer position

Last Answer : Answer: A

Description : You are paralleling two alternators. The synchronizing lamps grow dim and are totally darkened as the synchroscope pointer approaches the 0° position. This indicates that the ____________. A. alternator ... be closed C. incoming alternator is running too slowly D. synchroscope is defective or broken

Last Answer : Answer: B

Description : When paralleling two alternators using three synchronizing lamps, the flickering of all three lamps becomes progressively slower and slower. This means the ______________. A. frequency of the incoming ... the bus D. terminal voltage of the incoming alternator is approaching that of the bus

Last Answer : Answer: A

Description : The instantaneous reduction in voltage of an AC generator, resulting from an increase in load, and prior to the automatic voltage regulator correcting the situation, is called voltage ____________. A. droop B. drop C. dip D. regulation

Last Answer : Answer: C

Description : The frequency of an alternator is controlled from the main switchboard by adjusting the _____________. A. frequency meter B. voltage regulator C. governor control D. sychroscope switch

Last Answer : Answer: C

Description : A diesel driven emergency generator is prevented from being paralleled with the ship's service generators by __________. A. an electrical interlock system B. an automatic paralleling trip switch C. the synchronizing oscilloscope D. the reverse current relay

Last Answer : Answer: A

Description : Voltage generated by most AC generators is fed from the machine to the bus by means of ____________. A. brushes on a commutator B. brushes on slip rings C. slip rings on a commutator D. direct connections from the stator

Last Answer : Answer: D

Description : While paralleling two (2) AC generators using synchronizing lamps only, both lamps will go dark when the generators are ____________. A. running at the same speed B. grounded C. of the same polarity D. in phase

Last Answer : Answer: D

Description : The frequency of an AC generator is adjusted by means of the ____________. A. main alternator field rheostat B. exciter field rheostat C. prime mover governor control D. equalizing reactor

Last Answer : Answer: C

Description : When securing an AC generator, you should FIRST ___________. A. open the generator circuit breaker B. switch the voltage regulator to 'manual' C. decrease the field excitation to minimum D. reduce the load on the unit

Last Answer : Answer: D

Description : When two AC generators are being paralleled, the breaker should be closed with the synchroscope pointer rotating in the ____________. A. 'slow' direction, just before the 12 o'clock position B. 'fast' ... just before the 12 o'clock position D. 'slow' direction, just after the 12 o'clock position

Last Answer : Answer: C

Description : An AC generator operating in parallel loses its excitation without tripping the circuit breaker. This will __________. A. not affect the faulty generator due to the compensation of the other generators B. ... between the armature and the bus D. cause high currents to be induced in the field windings

Last Answer : Answer: D

Description : Which of the following problems will occur if the circuit breaker of the incoming alternator is closed and it is 180° out of phase with the loaded alternator when paralleling? A. The rotor of the ... The rotor of the incoming alternator will stop. D. Both alternators will parallel 180° out of phase.

Last Answer : Answer: B

Description : Regarding an AC generator connected to the main electrical bus; as the electric load and power factor vary, a corresponding change is reflected in the generator armature reaction. These changes in ... . governor speed droop setting B. voltage regulator C. balance coil D. phase-balance relay

Last Answer : Answer: B

Description : Which of the following actions must be carried out prior to closing the alternator circuit breaker according to the graph shown in the illustration? EL-0002 A. Increase the alternator voltage. B. Decrease the line voltage. C. Increase the line voltage. D. Decrease the line frequency.

Last Answer : Answer: A

Description : The voltage developed by an AC generator is controlled by varying the ____________. A. speed of the prime mover B. AC excitation to the field C. DC excitation to the field D. DC excitation of the voltage regulator

Last Answer : Answer: C

Description : A switchboard for an AC electrical system requires the use of which of the following devices? A. Frequency meter. B. Ohmmeter. C. Induction voltage regulator. D. Current transformer governor.

Last Answer : Answer: A

Description : Voltage failure of an AC generator may be caused by ____________. A. failure of the exciter generator B. a tripped bus circuit breaker C. high mica segments on the stator bus bar D. excessive prime mover speed

Last Answer : Answer: A

Description : The kilowatt load can be adjusted on a paralleled generator by using the _____________. A. field rheostat B. governor control C. automatic voltage regulators D. hand tachometer

Last Answer : Answer: B

Description : The power factor at which a paralleled AC generator operates is usually adjusted by the _____________. A. connected load B. prime mover speed C. field excitation D. generator's rated voltage

Last Answer : Answer: C

Description : The device labeled 'REG SW' in the illustration is used to ___________. EL-0003 A. shift from the automatic voltage regulator to the manual voltage regulator B. shift the governor control from manual to ... device 'REG ADJ' or device 'MAN ADJ' D. supply regulated control power to the switchboard

Last Answer : Answer: A

Description : Undervoltage trips are frequently installed on switchboard circuit breakers to trip ____________. A. out generators in the event of severe arcing or sparking B. out generators when there is reversal of power ... , but continues to run D. out generators when there is low voltage in the main circuit

Last Answer : Answer: D

Description : A reverse-current relay will prevent AC generator motorization by ____________. A. automatically redirecting the load B. automatically speeding up the prime mover C. tripping the panel board main switch D. tripping the generator circuit breaker

Last Answer : Answer: D

Description : A constant output voltage from an AC generator is maintained by the _____________. A. prime mover governor B. exciter generator C. voltage regulator D. reverse power relay

Last Answer : Answer: C

Description : Before any work on electrical or electronic equipment is performed, which of the following precautions should be carried out? A. De-energize the applicable switchboard bus. B. Bypass the interlocks. C. ... supply circuit breaker in the open position. D. Station a man at the circuit supply switch.

Last Answer : Answer: C

Description : Automatic voltage regulators provided on switchboards function to _____________. A. regulate the AC load on the generator B. protect the switchboard from high voltage C. govern prime mover speed to control voltage D. vary the field excitation to the generators

Last Answer : Answer: D

Description : Two AC generators of the same capacity are operating in parallel. One with a zero speed droop setting and the other with a 5% speed droop. If its capacity is not exceeded, the unit whose ... B. maintain the frequency of the system C. have poor sensitivity characteristics D. have poor power response

Last Answer : Answer: B

Description : Kilowatt load is divided between two AC generators operating in parallel by _____________. A. adjusting the governor controls B. varying the excitation voltage C. increasing both prime mover speeds simultaneously D. decreasing both prime mover speeds simultaneously

Last Answer : Answer: A

Description : When paralleling two alternators, the synchronizing lamps remain lit as the synchroscope pointer approaches the 0°. This indicates the _____________. A. incoming alternator is running too fast B. alternator ... apart C. synchroscope is defective or broken D. alternator power factors are in phase

Last Answer : Answer: C

Description : The division of the kilowatt load between two AC generators operating in parallel is controlled by the settings and characteristics of the _____________. A. voltage regulators B. field rheostats C. reverse power relays D. prime mover governors

Last Answer : Answer: D

Description : The speed of a series wound winch motor is controlled by ____________. A. varying the voltage applied to the motor B. the weight of the load on the cargo boom C. overcurrent protection devices in the motor D. a hydraulic speed-limiting governor

Last Answer : Answer: A

Description : The frequency of an AC generator is controlled by the _____________. A. rheostat B. governor C. exciter D. capacitor

Last Answer : Answer: B

Description : The voltage of an operating AC turbogenerator is raised or lowered by adjusting the _____________. A. exciter generator governor controls B. synchronizing switch C. phase sequence switch D. generator field exciter

Last Answer : Answer: D

Description : A shore power circuit breaker should be closed only _____________. A. when the ship's generators have been directly paralleled to those on shore B. in a shipyard C. if a quick disconnect coupling is used D. when the ship's generators have been removed from the bus

Last Answer : Answer: D