The design period in years for pumping plants, is A. 1 B. 2 to 3 C. 3 to 5 D. 5 to 10

1 Answer

Answer :

ANS: D

Related questions

Description : The design period of sewage treatment works in normally A. 5 – 10 years B. 15 – 20 years C. 30 – 40 years D. 40 – 50 years

Last Answer : ANS: B

Description : Q No: 191 Design period of 40 to 50 years is adopted for A. Branch sewers B. Main sewers C. Trunk sewers D. All the above

Last Answer : ANS: D

Description : The digested sludge from septic tanks, is removed after a maximum period of A. 3 years B. 3.5 years C. 4 years D. 5 years

Last Answer : ANS: A

Description : In normal conditions, the period for sludge digestion, is A. 10 days B. 20 days C. 30 days D. 60 days

Last Answer : ANS: C

Description : The ratio of design discharge to the surface area of a sedimentation tank is called A. Surface loading B. Overflow rate C. Overflow velocity D. All of these

Last Answer : ANS: D

Description : When drainage to sewage ratio is 20, the peak dry weather flow is A. 20% of the design discharge B. Slightly less than 5% of the design discharge C. Slightly more than 5% of the design discharge D. None of these

Last Answer : ANS: B

Description : You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at A. Full depth B. Half full C. Two third full D. Three fourth full

Last Answer : ANS: B

Description : For design purposes, the normal rate of infiltration of ground water into the sewer, is A. 500 litres/km/cm B. 1000 litres/km/cm C. 1500 litres/km/cm D. 2000 litres/km/cm

Last Answer : ANS: D

Description : It is customary to design a sewer for D.W.F. on the basis of A. Average demand B. Twice the average demand C. Thrice the average demand D. Four times the average demand

Last Answer : ANS: C

Description : For design of sewers, percentage of sewage discharge is assumed A. 65 to 70% B. 70 to 75% C. 75 to 80% D. 85%

Last Answer : ANS: C

Description : Pick up the correct statement from the following: A. The sewer pipes of sizes less than 0.4 m diameter are designed as running full at maximum discharge B. The sewer pipes of sizes greater than 0.4 m ... discharge C. The minimum design velocity of sewer pipes is taken as 0.8 m/sec D. All the above

Last Answer : ANS: D

Description : The recommended detention period for grit chambers is A. 1 minute B. 2 minutes C. 3 minutes D. 5 minutes

Last Answer : ANS: A

Description : The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is A. 5 m B. 5.5 m C. 6.5 m D. 7 m

Last Answer : ANS: D

Description : The dimensions of a rectangular settling tank are: length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is A. 204 cu.m B. 208 cu.m C. 212 cu.m D. 216 cu.m

Last Answer : ANS: D

Description : In detritus tanks, A. Flow velocity is kept 0.09 m/sec B. Detention period is kept 3 to 4 minutes C. Organic and inorganic materials are separated D. All the above

Last Answer : ANS: D

Description : WASTE WATER ENGINEERING Objective Questions with Answers Q No: 161 The quantity of liquid waste which flows in sewers during the period of rainfall, is known A. Sanitary sewage B. Industrial waste C. Storm sewage D. None of these

Last Answer : ANS: C

Description : In case of Imhoff tanks, A. The shape is rectangular B. Detention period is 2 hours C. The velocity of flow is restricted to 0.30 m/minute D. All the above

Last Answer : ANS: D

Description : In a grit chamber of a sewage treatment plant, A. Flow velocity 0.15 m to 0.3 m/sec is kept B. Depth of 0.9 m to 1.20 m is kept C. One minute of detention period is kept D. All the above

Last Answer : ANS: D

Description : Pick up the incorrect statement from the following: A. Septic tanks are horizontal continuous flow type of sedimentation tanks B. Septic tanks are generally provided a detention period of 12 to 36 hours C ... covered and high vent shafts are provided for the escape of foul gases D. None of these

Last Answer : ANS: D

Description : The detention period for plain sedimentation water tanks, is usually A. 4 to 8 hours B. 8 to 16 hours C. 16 to 24 hours D. 24 to 36 hours

Last Answer : ANS: A

Description : Pick up the correct statement from the following: A. The maximum rate of storm runoff is called peak drainage discharge B. Rational method of estimating peak run off, may be used precisely for ... entire area starts contributing to the runoff, is called the time of concentration D. All the above

Last Answer : ANS: D

Description : For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is A. 16 m B. 20 m C. 24 m D. 30 m

Last Answer : ANS: C

Description : The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is A. 30 minutes B. 1 hour C. 1 hour and 30 minutes D. 2 hours

Last Answer : ANS: D

Description : 11. Acid regression stage of sludge digestion at a temperature 21°C extends over a period of A. 15 days B. 30 days C. 60 days D. 90 days

Last Answer : ANS: D

Description : Aerobic activity is maximum A. In freshly produced sewage B. At sewer pipes C. In sewer treatment plants D. None of these

Last Answer : ANS: A

Description : The grit chambers of sewage treatment plants, are generally cleaned after A. 2 days B. 7 days C. 12 days D. 14 days

Last Answer : ANS: D

Description : In 1000 kg of sewage, the total solids approximate A. 0.5 to 1.0 kg B. 1 kg to 2.0 kg C. 5 kg to 7.5 kg D. 7.5 kg to 10 kg

Last Answer : ANS: A

Description : In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept A. 10.0 B. 5.0 C. 2.0 D. 0.25

Last Answer : ANS: D

Description : For the survival of fish in a river stream, the minimum dissolved oxygen is prescribed A. 3 ppm B. 4 ppm C. 5 ppm D. 10 ppm

Last Answer : ANS: B

Description : The minimum diameter of sewer to be adopted is A. 10 cm B. 12.5 cm C. 15 cm D. 25 cm

Last Answer : ANS: C

Description : The minimum recommended diameter of sewers, is A. 5 cm B. 10 cm C. 15 cm D. 20 cm

Last Answer : ANS: C

Description : In a city the ratio of the drainage to sewage is 20, the percentage discharge passing through non-monsoon periods, is A. 5 B. 10 C. 15 D. 20

Last Answer : ANS: D

Description : The spacing of bars of perforations of fine screens used for the treatment of sewage, is A. 2 to 3 mm B. 3 to 5 mm C. 5 to 8 mm D. 8 to 10 mm

Last Answer : ANS: A

Description : The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope A. 1 in 5 B. 1 in 10 C. 1 in 15 D. 1 in 20

Last Answer : ANS: B

Description : The moisture content of sludge is reduced from 90% to 80% in a sludge digestion tank. The percentage decrease in the volume of sludge, is A. 25 % B. 50 % C. 10 % D. 5 %

Last Answer : ANS: B

Description : For a peak discharge of 0.0157 cumec, with a velocity of 0.9 m/sec, the diameter of the sewer main, is A. 10 cm B. 12 cm C. 15 cm D. 18 cm

Last Answer : ANS: C

Description : For house drainage minimum gradient is A. 1 in 60 B. 1 in 80 C. 1 in 10 D. 1 in 400

Last Answer : ANS: A

Description : The normal values of over flow rates for secondary sedimentation tanks, ranges between A. 25,000 to 35,000 litres/sqm/day B. 40,000 to 50,000 litres/sqm/day C. 50,000 to 60,000 litres/sqm/day D. 80,000 to 10,000 litres/sqm/day

Last Answer : ANS: A

Description : The rate of accumulation of sludge per person per year, is A. 10 litres B. 15 litres C. 20 litres D. 25 litres

Last Answer : ANS: C

Description : A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is A. 2.30 m B. 2.40 m C. 2.45 m D. 2.50 m

Last Answer : ANS: C

Description : The minimum diameter of a sewer is kept A. 10 cm B. 15 cm C. 20 cm D. 25 cm

Last Answer : ANS: B

Description : Q No: 101 are available in size Stoneware sewers A. 10 cm B. 15 cm C. 20 cm D. All the above

Last Answer : ANS: D

Description : If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is A. 2 hours B. 4 hours C. 6 hours D. 8 hours

Last Answer : ANS: D

Description : In sewers the velocity of flow should not be A. More than the self-cleansing velocity B. Less than the self-cleansing velocity C. Less than 10 m/sec D. More than 20 m/sec

Last Answer : ANS: B

Description : The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is A. 1 in 100 upward B. 1 in 500 upward C. 1 in 100 downward D. 1 in 503 upward

Last Answer : ANS: C

Description : The Brake Horse power of the motor (efficiency 60%) required for a pump of capacity 0.075 cumec for a total lift of 12 m, is A. 10 B. 15 C. 20 D. 25 Q No: 44 Aerobic bacterias A. ... presence of free oxygen B. Consume organic matter as their food C. Oxidise organic matter in sewage D. All the above

Last Answer : ANS: D

Description : The drainage area of a town is 12 hectares. Its 40% area is hard pavement ( K = 0.85), the 40% area is unpaved streets (K = 0.20) and the remaining is wooded areas (K = 0.15). Assuming the time of concentration ... 60) the maximum run off is A. 0.10 cumec B. 0.12 cumec C. 0.15 cumec D. 0.20 cumec

Last Answer : ANS: C

Description : The standard B.O.D. of water is taken for A. 1 day B. 2 days C. 3 days D. 5 days

Last Answer : ANS: D

Description : The width of a rectangular sewer is twice its depth while discharging 1.5 m/sec. The width of the sewer is A. 0.68 m B. 0.88 m C. 1.36 m D. 1.76 m

Last Answer : ANS: C

Description : If the grit in grit chambers is 4.5 million litres per day, its cleaning is done A. Manually B. Mechanically C. Hydraulically D. Electrically

Last Answer : ANS: A