Which of the following is not included in waterfall model ? (A) Requirement analysis (B) Risk analysis (C) Design (D) Coding

1 Answer

Answer :

(B) Risk analysis

Related questions

Description : The major shortcoming of waterfall model is (A) the difficulty in accommodating changes after requirement analysis. (B) the difficult in accommodating changes after feasibility analysis. (C) the system testing. (D) the maintenance of system.

Last Answer : (A) the difficulty in accommodating changes after requirement analysis.

Description : The quick design of a software that is visible to end users leads to ............ (A) iterative model (B) prototype model (C) spiral model (D) waterfall model 

Last Answer : (B) prototype model

Description : A simple way of looking at the spiral life-cycle model is as a waterfall model with each phase proceeded by a) Build-and-fix b) Freezing c) Synchronization d) Testing e) Risk analysis

Last Answer : e) Risk analysis

Description : Which process model is also called as classic life cycle model? (A) Waterfall model (B) RAD model (C) Prototyping model (D) Incremental model

Last Answer : (A) Waterfall model

Description : The most important feature of spiral model is (A) requirement analysis. (B) risk management. (C) quality management. (D) configuration management.

Last Answer : (B) risk management.

Description : Requirement Development, Organizational Process Focus, Organizational Training, Risk Management and Integrated Supplier Management are process areas required to achieve maturity level (A) Performed (B) Managed (C) Defined (D) Optimized

Last Answer : (C) Defined

Description : Project risk factor is considered in ? Spiral Model Waterfall Model Prototyping Model Iterative enhancement Model

Last Answer : Spiral Model

Description : ………….. Phase is a time consuming phase and yet a very crucial phase A) Feasibility Study B) Requirement Phase C) Analysis Phase D) Testing Phase

Last Answer : C) Analysis Phase

Description : Which one of the following statements, related to the requirements phase in Software Engineering, is incorrect ? (A) Requirement validation is one of the activities in the requirements phase. (B) ... . (D) Function points is one of the most commonly used size metric for requirements. 

Last Answer : (C) “Modelling-oriented approach” is one of the methods for specifying the functional specifications. 

Description : Which one of the following is not a step of requirement engineering ? (A) Requirement elicitation (B) Requirement analysts (C) Requirement design (D) Requirement documentation

Last Answer : (C) Requirement design

Description : The software ................. of a program or a computing system is the structure or structures of the system, which comprise software components, the externally visible properties of those components, and the relationships among them. (A) Design (B) Architecture (C) Process (D) Requirement

Last Answer : (B) Architecture

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : Structured charts are a product of (A) requirements gathering (B) requirements analysis (C) design (D) coding

Last Answer : (C) design

Description : ………………… approach reduces time and effort required for design and lesser risk in database management. A) Single global database B) Top-down approach C) Multiple databases D) None of the above

Last Answer : C) Multiple databases

Description : State True or False. 1. Term of reference is the final output of Feasibility Study 2. Design specification report is the final output of System Analysis A) 1-true, 2-true B) 1-false, 2-true C) 1-true, 2-false D) 1-false, 2-false

Last Answer : A) 1-true, 2-true

Description : ………………. is responsible for all aspects of data processing, operation research, organization and method, system analysis and design investments. A) Management Services Director B) Data Processing Manager C) Computer Manager D) Both B and C

Last Answer : A) Management Services Director

Description : A context diagram is used A) as the first step in developing a detailed DFD of a system B) in systems analysis of very complex systems C) as an aid to system design D) as an aid to programmer

Last Answer : A) as the first step in developing a detailed DFD of a system

Description : Statement of scope and objectives, opportunities and performance criteria …………. A) Problem definition B) System analysis C) System Design D) Documentation

Last Answer : A) Problem definition

Description : State True or False. i) Master Development Plan basically is a schedule of various applications to be comprised. ii) It consists of start and finish dates of a system analysis, design implementation and maintenance activities. ... B) i-False, ii-True C) i-True, ii-False D) i-False, ii-False

Last Answer : A) i-True, ii-True

Description : The main ingredient of the report documenting the ……………… is the cost benefit analysis. A) System Analysis B) Feasibility Study C) System Analyst D) System Design

Last Answer : B) Feasibility Study

Description : To create vehicle of information to provide evidence in the development process and to monitor the process. This is one of the objectives of A) Analysis B) Design C) Development D) Documentation

Last Answer : D) Documentation

Description : ……….. includes review of the existing procedures and information flow. A) Feasibility Study B) Feasibility report C) System Design D) System analysis

Last Answer : A) Feasibility Study

Description : Which is not a step of requirement engineering? (A) Requirements elicitation (B) Requirements analysis (C) Requirements design (D) Requirements documentation

Last Answer : (C) Requirements design

Description : Which of the following is an initial mandatory requirement for pursuing research? (A) Developing a research design (B) Formulating a research question (C) Deciding about the data analysis procedure (D) Formulating a research hypothesis

Last Answer : (B) Formulating a research question

Description : Which method is not included in seven Project Selection Methods?  A. Financial Analysis B. Strategic Alignment C. Weighted Scoring Model D. Straight line Model (Ans.)

Last Answer : D. Straight line Model (Ans.)

Description : Which of the following is not a lossy compression technique ? (A) JPEG (B) MPEG (C) FFT (D) Arithmetic coding

Last Answer : (D) Arithmetic coding

Description : Which of the following is used for the boundary representation of an image object? (A) Quad Tree (B) Projections (C) Run length coding (D) Chain codes

Last Answer : (D) Chain codes

Description : From the given data below: a b b a a b b a a b which one of the following is not a word in the dictionary created by LZ-coding (the initial words are a, b)? (1) a b (2) b b (3) b a (4) b a a b 

Last Answer : (4) b a a b 

Description : In the spiral model ‘risk analysis’ is performed (A) In the first loop (B) in the first and second loop (C) In every loop (D) before using spiral model

Last Answer : (C) In every loop

Description : Based on the identification of objectives, input, output and file content, the vital document is called … A) System Definition B) System Document C) System Requirement Document D) System Subject

Last Answer : B) System Document

Description : Software Configuration Management is the discipline for systematically controlling (A) the changes due to the evolution of work products as the project proceeds. (B) the changes due to defects (bugs) being found and then fixed. (C) the changes due to requirement changes (D) all of the above

Last Answer : (D) all of the above

Description : Requirements prioritization and negotiation belongs to: (A) Requirements validation (B) Requirements elicitation (C) Feasibility Study (D) Requirement reviews

Last Answer : (B) Requirements elicitation

Description : An ideal sort is an in-place-sort whose additional space requirement is ............... (A) O(log2n) (B) O(nlog2n) (C) O(1) (D) O(n)

Last Answer : Answer: C

Description : What is Waterfall Model in Software?

Last Answer : WATERFALL MODEL It is a sequential design process in which progress is seen as flowing steadily downwards.(like waterfall) through the phases of conception,initiation,analysis,design,construction,testing,production/implementation and maintenance.

Description : Waterfall model is not suitable for ? Small Projects Complex Projects Accommodating change None of Above

Last Answer : Accommodating change

Description : Which is not a software life cycle model? Spiral Model Waterfall Model Prototyping Model Capability maturity Model

Last Answer : Capability maturity Model

Description : Which model is popular for students small projects ? Waterfall Model Spiral Model Quick and Fix model Prototyping Mode

Last Answer : Waterfall Model

Description : What Is Waterfall Model?

Last Answer : The waterfall model is a sequential software development process, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of Conception, Initiation, Analysis, Design (validation), Construction, Testing and maintenance.

Description : Explain the waterfall model. Explain why it is more advantageous than adhoc methods.

Last Answer : Ans Waterfall Model: 1.The waterfall model is a sequential software development process, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of Conception, Initiation, ... approach. b. Iteration is not required. c. It is widely use because it is easy.

Description : What is the advantage of using prototype software development model instead of waterfall model? Also explain the effect of defining a prototype on the overall cost of the software project?

Last Answer : Ans:The waterfall model: This is the classic SDLC model, with a linear and sequential method that has goals for each development phase. The waterfall model simplifies task scheduling, because ... acceptable prototype is finally achieved from which the complete system or product can now be developed.

Description : Requirements can be refined using (A) The waterfall model (B) prototyping model (C) the evolutionary model (D) the spiral model

Last Answer : (B) prototyping model

Description : For a well understood data processing application it is best to use (A) The waterfall model (B) prototyping model (C) the evolutionary model (D) the spiral model

Last Answer : (A) The waterfall model

Description : The model in which the requirements are implemented by category is (A) Evolutionary Development Model (B) Waterfall Model (C) Prototyping (D) Iterative Enhancement Model

Last Answer : (A) Evolutionary Development Model

Description : Explain the waterfall model.

Last Answer : The waterfall model is a traditional method, sometimes called the classic life cycle. This is one of the initial models. As the figure implies stages are cascaded and shall be developed one ... useful in situation where the requirements are fixed and work proceeds to completion in a linear manner.

Description : Continual (Continuous) improvement cycle is based on systematic sequence of -------------- activities. a) SDLC b) PDCA c) waterfall model

Last Answer :  Ans : b.

Description : Explain waterfall process model. State its advantages and disadvantages.

Last Answer : The waterfall model is a traditional method, sometimes called the classic life cycle. This is one of the initial models. As the figure implies stages are cascaded and shall be developed one ... 6. Not suitable for the projects where requirements are at a moderate to high risk of changing.

Description : What is System Analysis? A) The design of the screen the user will see and use to enter or display data B) System analysis defines the format and type of data the program will use C) System Analysis involves creating formal model of the problem to be solved D) None of the above

Last Answer : Answer : C

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : State true or false. i) Jpanel is a class included in awt package. ii) Anonymous classes are mostly used for event handling. iii) Names of anonymous classes must be unique iv) JOptionPane is an inner class A) i-false ... ) i-false, ii-true, iii-false, iv-false D) i-true, ii-false, iii-false, iv-true

Last Answer : C) i-false, ii-true, iii-false, iv-false

Description : What would happen if "String[]args" is not included as argument in the main method. A) No error B) Compilation error C) Program won't run D) Program exit

Last Answer : C) Program won't run