Waterfall model is not suitable for ?
Small Projects
Complex Projects
Accommodating change
None of Above

1 Answer

Answer :

Accommodating change

Related questions

Description : Which model is popular for students small projects ? Waterfall Model Spiral Model Quick and Fix model Prototyping Mode

Last Answer : Waterfall Model

Description : The major shortcoming of waterfall model is (A) the difficulty in accommodating changes after requirement analysis. (B) the difficult in accommodating changes after feasibility analysis. (C) the system testing. (D) the maintenance of system.

Last Answer : (A) the difficulty in accommodating changes after requirement analysis.

Description : Project risk factor is considered in ? Spiral Model Waterfall Model Prototyping Model Iterative enhancement Model

Last Answer : Spiral Model

Description : Which is not a software life cycle model? Spiral Model Waterfall Model Prototyping Model Capability maturity Model

Last Answer : Capability maturity Model

Description : List any two differences betweenIncremental model and Spiral model in developing complex software projects. -Technology

Last Answer : Incremental model works on the stage-wise development of a complex project that involves real time data whereas Spiral model works on risk analysis of a real time situation.Spiral model is a combination of both Incremental as well as Waterfall method.

Description : What network model enables engineer managers to schedule, monitor and control large and complex projects by employing three time estimates per activity a. Forecasting b. Program evaluation review technique c. Critical path method d. simulation

Last Answer : b. Program evaluation review technique

Description : What network model enables engineer managers to schedule, monitor and control large and complex projects by using only one time factor per activity a. Forecasting b. Program evaluation review technique c. Critical path method d. simulation

Last Answer : b. Program evaluation review technique

Description : PERT technique of network analysis is mainly useful for (A) Small projects (B) Large and complex projects (C) Research and development projects (D) Deterministic activities

Last Answer : (C) Research and development projects

Description : What is Waterfall Model in Software?

Last Answer : WATERFALL MODEL It is a sequential design process in which progress is seen as flowing steadily downwards.(like waterfall) through the phases of conception,initiation,analysis,design,construction,testing,production/implementation and maintenance.

Description : A simple way of looking at the spiral life-cycle model is as a waterfall model with each phase proceeded by a) Build-and-fix b) Freezing c) Synchronization d) Testing e) Risk analysis

Last Answer : e) Risk analysis

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : What Is Waterfall Model?

Last Answer : The waterfall model is a sequential software development process, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of Conception, Initiation, Analysis, Design (validation), Construction, Testing and maintenance.

Description : Explain the waterfall model. Explain why it is more advantageous than adhoc methods.

Last Answer : Ans Waterfall Model: 1.The waterfall model is a sequential software development process, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of Conception, Initiation, ... approach. b. Iteration is not required. c. It is widely use because it is easy.

Description : What is the advantage of using prototype software development model instead of waterfall model? Also explain the effect of defining a prototype on the overall cost of the software project?

Last Answer : Ans:The waterfall model: This is the classic SDLC model, with a linear and sequential method that has goals for each development phase. The waterfall model simplifies task scheduling, because ... acceptable prototype is finally achieved from which the complete system or product can now be developed.

Description : Requirements can be refined using (A) The waterfall model (B) prototyping model (C) the evolutionary model (D) the spiral model

Last Answer : (B) prototyping model

Description : For a well understood data processing application it is best to use (A) The waterfall model (B) prototyping model (C) the evolutionary model (D) the spiral model

Last Answer : (A) The waterfall model

Description : The model in which the requirements are implemented by category is (A) Evolutionary Development Model (B) Waterfall Model (C) Prototyping (D) Iterative Enhancement Model

Last Answer : (A) Evolutionary Development Model

Description : Explain the waterfall model.

Last Answer : The waterfall model is a traditional method, sometimes called the classic life cycle. This is one of the initial models. As the figure implies stages are cascaded and shall be developed one ... useful in situation where the requirements are fixed and work proceeds to completion in a linear manner.

Description : Continual (Continuous) improvement cycle is based on systematic sequence of -------------- activities. a) SDLC b) PDCA c) waterfall model

Last Answer :  Ans : b.

Description : Which process model is also called as classic life cycle model? (A) Waterfall model (B) RAD model (C) Prototyping model (D) Incremental model

Last Answer : (A) Waterfall model

Description : Which of the following is not included in waterfall model ? (A) Requirement analysis (B) Risk analysis (C) Design (D) Coding

Last Answer : (B) Risk analysis

Description : The quick design of a software that is visible to end users leads to ............ (A) iterative model (B) prototype model (C) spiral model (D) waterfall model 

Last Answer : (B) prototype model

Description : Explain waterfall process model. State its advantages and disadvantages.

Last Answer : The waterfall model is a traditional method, sometimes called the classic life cycle. This is one of the initial models. As the figure implies stages are cascaded and shall be developed one ... 6. Not suitable for the projects where requirements are at a moderate to high risk of changing.

Description : Which of the following is form of semi conductor memory in which it is possible to change the contents of selected memory locations by applying suitable electrical signals? a. CAM b. ROM c. EPROM d. Abacus

Last Answer : EPROM

Description : How do I become less accommodating to others?

Last Answer : Busy people tend to not be abused this way. I hope you don't cancel any plans to do favors for others do you? It's nice to be needed but it is often abused. Then there's the approach of ... into a favor. You only need to be unavailable for a few times before these requests start to taper off.

Description : Does online marriage Bureau accommodating in finding foreordained perfect partner if yes then, Which is the best matrimony site in Pakistan?

Last Answer : Answers is the place to go to get the answers you need and to ask the questions you want

Description : Do it because I said to” is the mantra for project managers who use _____ as the  default approach to resolve conflict. Select one: a. collaborating b. compromising c. accommodating d. forcing e. avoiding

Last Answer : d. forcing

Description : A willingness to accept a raise of $2 an hour rather than $3, to acknowledge partial agreement with a specific viewpoint, and to take a partial blame for an infraction are examples of: (a) avoiding. (b) collaborating. (c) accommodating. (d) compromising.

Last Answer : (d) compromising. 

Description : The conflict-handling orientation that is based on a process of give-and-take and an emphasis on “splitting the difference” is: (a) avoiding. ; (b) collaborating. ; (c) accommodating. ; (d) compromising. 

Last Answer : (d) compromising.

Description : _____ is when one party is willing to be self-sacrificing in order that the relationship can be maintained. (a) Competing ; (b) Accommodating ; (c) Collaborating ; (d) Compromising

Last Answer :  (b) Accommodating ;

Description : Which one of the following conflict-handling orientations represents an attempt to find a win-win solution? (a) avoiding ; (b) collaborating ; (c) accommodating ; (d) compromising

Last Answer : ; (b) collaborating ;

Description : Trying to make someone else accept blame for a problem is an example of which conflict-handling orientation? (a) competing ; (b) avoiding ; (c) accommodating ; (d) compromising

Last Answer : (a) competing ;

Description : Which type of conflict-handling intention results in a person‟s withdrawing from conflict? (a) competing ; (b) avoiding ; (c) accommodating ; (d) compromising

Last Answer : Avoiding

Description : Attempting to find a win-win solution that allows both parties‟ goals to be completely achieved and seeking a conclusion that incorporates the valid insights of both parties is an example of which conflicthandling intention? (a) collaborating ; (b) accommodating ; (c) avoiding ; (d) competing

Last Answer : (a) collaborating ;

Description : The unassertive and uncooperative conflict-handling orientation is: (a) collaborating. ; (b) accommodating. ; (c) avoiding. ; (d) competing.

Last Answer :  (c) avoiding. ;

Description : The conflict-handling orientation that combines assertiveness and cooperation is: (a) collaborating. ; (b) competing. ; (c) avoiding. ; (d) accommodating.

Last Answer : (a) collaborating. ;

Description : Which is not one of the five conflict-handling intentions? (a) Cooperating ; (b) competing ; (c) accommodating ; (d) avoiding

Last Answer : (a) Cooperating ;

Description : Which of the following statements is true regarding contracts? Select one: a. They are the filters through which project members screen information that is shared. b. They do not lend ... information-rich  environment will suffer. e. Contracts promote the growth of a trusting project culture.

Last Answer : b. They do not lend themselves to create an environment of trust.

Description : Projects of complex organizations usually require input from several functional departments, which creates A. Overlapping B. Shared Responsibility C. Both A and B

Last Answer : Both A and B

Description : When complex organizations conduct projects, projects usually require input from several A. Functional departments B. Marketing departments C. Senior management D. Management department

Last Answer : Functional departments

Description : Bar charts are suitable for (A) Minor works (B) Major works (C) Large projects (D) All the Above

Last Answer : (A) Minor works

Description : Data structure suitable for the application is discussed in ? data design architectural design procedural design interface design

Last Answer : data design

Description : An application suitable for sequential processing is a. Processing of grades b. Payroll processing c. Both a and b d. All of above

Last Answer : Both a and b

Description : _______ is suitable for businesses that require comparable upstream and downstream data rates. A) VDSL B) ADSL C) SDSL D) (a) and (b)

Last Answer : SDSL

Description : Which of the following is NOT true about User Datagram Protocol in transport layer? a. Works well in unidirectional communication, suitable for broadcast information. b. It does three way ... File System d. The lack of retransmission delays makes it suitable for real-time applications

Last Answer : b. It does three way handshake before sending datagrams

Description : Which of the following statements is TRUE about CSMA/CD a. IEEE 802.11 wireless LAN runs CSMA/CD protocol b. Ethernet is not based on CSMA/CD protocol c. CSMA/CD is not suitable for a high propagation delay network like satellite network d. There is no contention in a CSMA/CD network

Last Answer : CSMA/CD is not suitable for a high propagation delay

Description : Find the best suitable topology for large businesses which must capable to control and coordinate the operation of distributed branch outlets? a. Ring b. Local area c. Hierarchical d. Star

Last Answer : d. Star

Description : Identify the non suitable medium for 802.3 ethernet? a. A thin coaxial cable b. A twisted pair cable c. A microwave link d. A fiber optical cable

Last Answer : c. A microwave link

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A) Algorithmic model (B) Expert judgment (C) Top down (D) Analogy

Last Answer : (D) Analogy

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A)Algorithmic model (B)Expert judgment (C)Top down (D)Analogy

Last Answer : (D)Analogy