What is the current price at the current exchange rate?

1 Answer

Answer :

450,000+ VAT minimum. Rather, count on it because there is an extra cost for the plot, paving, fencing, planning. In the end, it is already moving well over a million or so, especially as material prices have doubled in about a year and a half.

Related questions

Description : Which of the following statements about septic shock are true? A. A circulating myocardial depressant factor may account for the cardiac dysfunction sometimes seen with shock due to sepsis or ... animal studies that demonstrate a significant improvement in survival with the use of such agents.

Last Answer : Answer: AB DISCUSSION: Shock due to sepsis or SIRS frequently manifests as a hyperdynamic cardiovascular response, consisting of an elevated CI and a decreased SVR or SVRI. Occasionally, ... been encouraging thus far in human clinical trials, despite the promising results from many animal studies

Description : The amount of energy reaching per square meter of earth’s atmosphere is called

Last Answer : solar constant.

Description : The cost of preparing a cricket ground of rectangular shape at 70 paisa per square meter is Rs.508.20. Find the perimeter of the field if its sides are in the ratio 3:2 a) 121m b) 96m c) 55m d) 110m

Last Answer : d) 110m

Description : Requirement of water for platform washing is a)5 litre per square metre per day * b)10 litre per square meter per day c) 15 litre per square metre per day d)20 litre per square metre per day

Last Answer : a)5 litre per square metre per day *

Description : External shunts are sometimes used with ammeters to _______. A. increase meter sensitivity B. permit shunts with larger resistances to be utilized C. prevent damage to the meter movement from heat generated by the shunt D. enable the construction of a compact meter with a virtually unlimited range

Last Answer : Answer: C

Description : Describe with block diagram; the construction of single phase electronic energy meter. 

Last Answer : Construction of Single Phase Electronic Energy Meter: 1. CT reduces current to reasonable value for current scaling network. 2. Voltage & current scaling networks reduce proportionally the ... The ADC converts the square wave frequency analog output to display the energy in Watt-hour.

Description : Describe the construction of orifice plate flow meter. 

Last Answer : It is variable head flow meter in which the differential pressure is developed by using orifice plate by inserting it in the path of the fluid flow.  Orifice meter is as ... measurement of differential pressure. Thus differential pressure (p1-p2) is directly proportional to the flowrate.

Description : Draw the construction diagram of clip on meter and state its principle. 

Last Answer : Construction diagram of clip on meter:  A Clamp on meter works on the principle of Faradays laws of electromagnetic induction. When their primary conductor is connected to a.c. ... magenetic core & induces an emf in it according to the faraday's laws of electromagnetic induction. 

Description : Draw ultrasonic flow meter and explain its construction.

Last Answer : Construction : Figure shows the construction of time difference type ultrasonic flow meter. This consists of two transmitters and two receivers. These are separated by distance l and mounted as shown in ... receiver B, this do not favor the wave as it is opposite to the direction of flow.

Description : What is the per square foot price to build a house in NC?

Last Answer : So much of this depends on the many, many options for supplies, decorative pieces, everything that goes into building a house. If you have chair rails and crown molding and cool brick on the outside and onyx ... how much their houses cost. I rather think they'd be willing to help you figure it out.

Description : What is the average Price per square foot for leasing out office space in San Jose CA?

Last Answer : I suggest you contact a realtor to answer this question. I cantell you property prices and rents are high in this area. Peopleoften move out of the area and commute to afford to work there.

Description : Roof replacement price per square foot?

Last Answer : Depending on what year replacement roof you are looking for, the lowest being 20 year replacement is going for around $1.53 per square foot. This price includes the removal of the old roof as well.

Last Answer : 0.23 s per square meter.

Last Answer : 4.6 ganda per 1 sqm.

Last Answer : 10.8 square feet per 1 square meter.

Description : What is the answer of one side of a rectangle is 7 feet longer than the width and the area is 78 square meter?

Last Answer : The answer depends on what the questions is. It could be what is the longer side or what is the shorter side, or what is the ratio of the sides or even what day of the week way New Year's Day 2018!The sides of the rectangle are 7.829 metres and 9.963 metres, approx.

Description : What is the Difference between cubic square meter and loaded meter?

Last Answer : Hello

Description : A rectangle table has an area of 4/5 square meter . The length of the table is 8/3?

Last Answer : Gg

Description : What is the amount of radiant energy received each second over each square meter that is at right angles to the sun’s rays at the top of the atmosphere?  a. 1400 J  b. 6000 J  c. 10000 J  d. 800 J

Last Answer : 1400 J

Description : A goat is tied to one corner of a square plot of side 12 meter by a rope 7 meter long. Find the area it can graze? (a) 38.5 sq.m (b) 155 sq.m (c) 144 sq.m (d) 19.25 sq.m

Last Answer : (a) 38.5 sq.m

Description : Cross sectional area of catch water drain should not be more than a) 0 .75 square meter* b) 0. 90 square meter c) 0. 80 square meter d). 50 square meter

Last Answer : a) 0 .75 square meter*

Description : The pressure placed on a square with 1/2 meter sides is 1000 Pascals. How much force is being applied to the square?

Last Answer : ANSWER: 250 NEWTONS

Description : The construction of optical square is based, on the principle of optical (A) Reflection (B) Refraction (C) Double refraction (D) Double reflection

Last Answer : (D) Double reflection

Description : While estimating the qualities for the construction of a building, the correct metric unit is (A) Metre for length (B) Cubic metre for area (C) Square metres for volume (D) Litre for capacity

Last Answer : (D) Litre for capacity

Description : Pick up the correct statement from the following: (A) The cost of square rooms is less (B) The expenditure on the foundation and roof for the double storeyed building is nearly half of that ... cost of construction of a house may be minimised by restricting the height floors (D) All the above

Last Answer : Answer: Option D

Description : The Gadsen purchase of 50,000 square mile of land was primarily for the construction of _________. (a) University Town (b) Railways (c) Canals

Last Answer : (b) Railways

Description : What is the price for the OSHA 10 hour and how does a construction worker acquire it.?

Last Answer : Check these websites: # OSHA Outreach Training Program - FAQs OSHA does not accredit organizations or individuals, does not certify ... http://www.osha.gov/dte/outreach/faqs.html # OSHA 10 Hour Training ... w/ course review for study; Start ... http://www.oshacampus.com/osha-10-hour-training.cfm

Description : During the construction period, price variation clause in contracts caters to (A) Increase in rates of only important materials (B) Variation in cost in materials element, labour element and petrol-oil-lubricant ... ) Variation in total cost of the project on an ad hoc basis (D) Rate of inflation

Last Answer : (B) Variation in cost in materials element, labour element and petrol-oil-lubricant element

Description : The value of acceleration due to gravity is 980 cm/sec2. Its value in meter per (hour)2 will be a.1.27 x 108 b.127 c.1270 d.1.27 x 107 e.1270000

Last Answer : a. 1.27 x 108

Description : A jet of water of cross-sectional area 20 sq. cm impinges on a plate at an angle of 60? with a velocity of 10 m/sec. Neglecting the friction between the jet and plate (density of water 1000/9.81 kgm-1 sec2 per cubic meter), the ... a.15 - 20 kg b.20 - 25 kg c.5 - 10 kg d.25 - 30 kg e.10 - 15 kg

Last Answer : a. 15 - 20 kg

Description : A closed iron tank 12 m long 9 m wide and 4 m deep is to be made . Determine the cost of iron sheet used at the rate of rs 5 per meter , sheet being 2 m wide. -Maths 9th

Last Answer : This answer was deleted by our moderators...

Description : How many grams per cubic meter density of Mercury ?

Last Answer : The density of Mercury is the second highest among the densities of the solar system , 5.43 g / cm6; Which is slightly less than the earth.

Description : A potentiometer wire of length 10 m and resistance `10 Omega` per meter is connected in serice with a resistance box and a 2 volt battery. If a potent

Last Answer : A potentiometer wire of length 10 m and resistance `10 Omega` per meter is connected in serice with a ... Omega` C. `190 Omega` D. `90 Omega`

Description : What is speed of sound in meter per second?

Last Answer : The speed of sound is dependent on the temperature and not onthe air pressure. At 20 degrees celsius the speed of sound is 343m/s.

Description : What is the value in meter per second of the acceleration of gravity?

Last Answer : 9.8

Description : What is the value in meter per second of the acceleration of gravity?

Last Answer : 9.8

Description : Tape speed is measured in A) Feet per second B) Inch per second C) Meter per second D) Centimeter per second

Last Answer : Answer : B

Description : The speed of sound is _____. A. 300 meter per second B. 315 meter per second C. 340 meter per second D. 362 meter per second

Last Answer : ANSWER: C

Description : The speed of sound is _____. A. 300 meter per second B. 315 meter per second C. 340 meter per second D. 362 meter per second

Last Answer : ANSWER: C

Description : The speed of sound in air at sea level is approximately------? A. 300 meter per second B. 320 meter per second C. 340 meters per second (Answer) D. 370 meter per second

Last Answer : C. 340 meters per second (Answer)

Description : Force per meter on two wires carrying a current of 1 A placed 1 m apart is equal to A. 6.7 × 10-11 N B. 9.0 × 109 N C. 2.0 × 10-7 N D. 3.0 × 10-4 N

Last Answer :  2.0 × 10-7 N

Description : Calculate the shaft diameter on rigidity basis if torsional moment is 196000N-mm, length of shaft is 1000mm. Permissible angle of twist per meter is 0.5’ and take G=79300N/mm2. a) None of the listed b) 41.2mm c) 35.8mm d) 38.8mm

Last Answer : b) 41.2mm

Description : Tape speed is measured in a. Feet per second b. Inch per second c. Meter per second d. Centimeter per second

Last Answer : Inch per second

Description : A trolley wire weighs 1.2 kg per meter length. The ends of the wire are attached to two poles 20  meters apart. If the horizontal tension is 1500 kg find the dip in the middle of the span  (A) 2.5 cm  (B) 3.0 cm  (C) 4.0 cm  (D) 5.0 cm 

Last Answer : (C) 4.0 cm

Description : If the velocities of flow of a stream of 10 m depth recorded by a current meter at depths of 2 m and 8 m are 0.7 m and 0.3 m respectively, the discharge per unit width of the stream in cubic metres, is (A) 2 (B) 3 (C) 4 (D) 5

Last Answer : Answer: Option D

Description : The units of dynamic or absolute viscosity are (A) Metres² per sec (B) kg sec/meter (C) Newton-sec per meter (D) Newton-sec² per meter

Last Answer : Answer: Option C

Description : The unit of viscosity is (A) Metres² per sec (B) kg-sec/metre (C) Newton-sec per metre² (D) Newton-sec per meter

Last Answer : Answer: Option B

Description : The aggregates required for one kilometre length of water bound macadam road per meter width and for 10 mm thickness is (A) 8 cubic meter (B) 10 cubic meter (C) 12 cubic meter (D) 15 cubic meter

Last Answer : Answer: Option C

Description : A bayabas falls from a branch 5m above the ground with what speed in meter per second does it strike the ground assume g = 10m/s².  a. 11m/s  b. 12m/s  c. 13m/s  d. 10m/s ∫KE = mV2/2gc

Last Answer : 10m/s

Description : A rectangular grassy plot 110 m by 65 m has a gravel path 2.5 m wide all round it on the inside. Find the cost of gravelling the path at 80 paise per sq. Meter 1).Rs.680 2).Rs.860 3).Rs.608 4).None.

Last Answer : 1).Rs.680 Exp: overall area of the grassy plot is 110 x 65 =7150 sq. meters.The area of the grassy plot after applying the gravel path is 105 x 60=6300 sq. meters.Area of the gravel path is 7150 – 6300 = 850 sq.mtrs.Hence x 0.80=Rs.680 .