Paint is the mixture of …….
a) Binder, Pigment & Solvent*
b) Binder & Pigment
c) Binder & Solvent
d) None of the above

1 Answer

Answer :

a) Binder, Pigment & Solvent*

Related questions

Description : Name the paint used in A.T. Welding painting? (i) Black Paint (ii) Bituminous black IS:9862-1981.* (iii) Any type of black paint (iv) None of the above

Last Answer : (ii) Bituminous black IS:9862-1981.*

Description : Second coat of paint is done after minim. of (i) 2 Hrs after first coat (ii) 4 Hrs after first coat (i) 6 Hrs after first coat (iv) 8 Hrs. after first coat

Last Answer : (iv) 8 Hrs. after first coat

Description : Paint Aluminium confirms to IS

Last Answer : 2339

Description : Paint Zinc chromate Red oxide primer confirms to IS

Last Answer : 2074

Description : Paint Zinc chromate primer confirms to IS

Last Answer : 104

Description : Shelf life of Paint aluminium when paste and oil are mixed a) Oneday* b) 1 year c) 6 month d) None of the above

Last Answer : a) Oneday*

Description : Shelf life of Paint Red Oxide Ready mixed (IS : 123) a) 4 month b) 1 year* c) 6 month d) None of the above

Last Answer : b) 1 year*

Description : While painting with Aluminium paint, a little quantity of ………..shall be added to the paint while doing the first coat to distinguish it from the second coat a) little blue paint* b) lamp black c) red paint d) green paint

Last Answer : a) little blue paint*

Description : While painting with red oxide paint, a little quantity of ………..shall be added to the paint while doing the first coat to distinguish it from the second coat a) little blue paint b) lamp black* c) red paint d) green paint

Last Answer : b) lamp black*

Description : Elcometer is used to measure the ……….. a) cross level b) Gauge c) Thickness of paint* d) All the above

Last Answer : c) Thickness of paint*

Description : In areas where there is severe corrosion Finishing coat will be a) Two coats of aluminium paint to IS : 2339* b) One coat of zinc chromate priming to IS : 104 e) Two cover coats of red oxide paint to IS :123 f) One coat of zinc chrome - red oxide priming to IS : 2074

Last Answer : a) Two coats of aluminium paint to IS : 2339*

Description : In areas where there is no severe corrosion Finishing coat will be a) Two coats of aluminium paint to IS : 2339 b) One coat of zinc chromate priming to IS : 104 c) Two cover coats of red oxide paint to IS :123* d) One coat of zinc chrome - red oxide priming to IS : 2074

Last Answer : c) Two cover coats of red oxide paint to IS :123*

Description : Solvent used in duo-sol extraction for lube oil upgradation is a mixture of (A) Propane & phenol-cresol mixture (B) Methyl ethyl ketone & glycol (C) Phenol & furfural (D) Propane & liquid sulphur dioxide

Last Answer : (A) Propane & phenol-cresol mixture

Description : The most important constituent of an oil paint, is (A) Thinner (B) Vehicle (C) Pigment (D) All the above

Last Answer : Answer: Option D

Description : Which oxide of the following metals is often used as a pigment in white paint? w) titanium x) cobalt y) nickel z) vanadium

Last Answer : ANSWER: W -- TITANIUM

Description : What is the name the solvent in an emulsion paint?

Last Answer : a

Description : A volatile substance added to a paint to make its application easy and smooth, is known as (A) Base (B) Solvent (C) Vehicle (D) None to these

Last Answer : Answer: Option B

Description : As per norms for desirable amenity as given to model station, the retiring rooms should be provided on stations classified as --- (a) A & B* (b) A,B & C (c) A,B,C & D (d) A, B,C, D & E (e) A

Last Answer : a) A & B*

Description : As per norms for desirable amenity as given to model station, the clock rooms should be provided on stations classified as --- (a) A & B * (b) A,B & C (c) A,B,C & D (d) A, B,C, D & E (e) A

Last Answer : (a) A & B *

Description : As per norms for desirable amenity as given to model station, the water coolers should be provided on stations classified as --- (a) A & B (b) A,B & C (c) A,B,C & D* (d) A, B,C, D & E (e) A

Last Answer : (c) A,B,C & D*

Description : As per norms for desirable amenity as given to model station, the parking facility/circulating area should be provided on stations classified as --- (a) A & B (b) A,B & C (c) A,B,C & D* (d) A, B,C, D & E

Last Answer : (c) A,B,C & D*

Description : As per norms for desirable amenity as given to model station, the public address system should be provided on stations classified as --- (a) A & B (b) A,B & C* (c) A,B,C & D (d) A, B,C, D & E (e) A

Last Answer : (b) A,B & C*

Description : As per norms for desirable amenity as given to model station, the book stalls should be provided on stations classified as --- (a) A & B (b) A,B & C* (c) A,B,C & D (d) A, B,C, D & E (e) A

Last Answer : (b) A,B & C*

Description : As per norms for desirable amenity as given to model station, the refreshment rooms should be provided on stations classified as --- (a) A & B* (b) A,B & C (c) A,B,C & D (d) A, B,C, D & E (e) A

Last Answer : (a) A & B*

Description : Urinals & Latrines for A & B stations as norms for recommended level of facilities for railway station (a) Ndb/500 (b) Ndb/300 (c) Ndb/200* (d) None of the above

Last Answer : (c) Ndb/200*

Description : Number of urinals & latrines to be provided on ‘A’ category stations as per norms on main essential facilities are (a) 15 (b) 10* (c) 8 (d) 6

Last Answer : (b) 10*

Description : Latrines & urinals must be provided on these type of stations as per minimum essential facility criteria (a) A, B, C, D, E & F type station (b) A,B,C,D & E type station* (c) A,B,C & D type station (d) A, B & C type station

Last Answer : (b) A,B,C,D & E type station*

Description : Foot over bridge must be provided on the following type of stations as per minimum essential facility criteria (a) A, B, C, & D class station (b) A,B & C class station* (c) A, & B class station (d) Only A class station

Last Answer : b) A,B & C class station*

Description : Number of Elastic clips used for one K to BG single line section having 13 length & concrete sleepers of M+7 sleeper density are (a) 5280 (b) 6160* (c) 6250 (d) 6500

Last Answer : (b) 6160*

Description : In case of emergency, land can be acquired urgently by operation of special section (a) Section 4 & 6 (b) Section 9 & 17* (c) Section 8 & 10 (d) None of them

Last Answer : (b) Section 9 & 17*

Description : The survey instrument used for reconnaissance survey (a) Theodelite & Dumpty level (b) Prismatic compass & Aneriod barometer* (c) All the above (d) None of them

Last Answer : (b) Prismatic compass & Aneriod barometer*

Description : A metallic tape is made of (a) Steel (b) Invar (c) Linen (d) Cloth & wires*

Last Answer : (d) Cloth & wires

Description : In order to do fly levelling the following type of methodology is adopted (a) Rise & fall method (b) Height of instrument method (c) Both the above* (d) None of the above

Last Answer : c) Both the above*

Description : The increased gain of 10 dbs for single line & ‘D’ marks rails on double/multiple lines shall be employed for classification of defects. (i) defect in weld (ii) defects in rail. * (iii) for both defects on weld & rail. (iv) None of above.

Last Answer : ii) defects in rail. *

Description : 450 probe is used for detecting defect in; (i) FB weld (ii) AT weld (iii) FB weld, AT weld & SEJ (iv) All above*

Last Answer : (iv) All above*

Description : In AT welding process what is the role of asbestos powder & slag ? (i) To separate closing pin from portion* (ii) To hold the portion (iii) Both above are correct (iv) None of the above

Last Answer : (i) To separate closing pin from portion*

Description : In AT welding process what is the role of closing pin ? (i) To hold the portion before melt (ii) To hold the asbestos powder & slag (iii) Both above are correct* (iv) None of the above

Last Answer : (iii) Both above are correct*

Description : Painting of weld is done up to (i) 10 CM minimum both side of weld & on welded surface .* (ii) 15 CM minimum both side of weld & on welded surface (iii) 20 CM minimum both side of weld & on welded surface (iv) None of the above

Last Answer : (i) 10 CM minimum both side of weld & on welded surface .*

Description : What are the recognized systems for pre heating of rails ends for AT Welding? (i) Oxygen –LPG & Compressed air petrol both* (ii) Only Oxygen –LPG (iii) Only Compressed air petrol both (iv) both are correct

Last Answer : ) Oxygen –LPG & Compressed air petrol both*

Description : Crucible is repaired by? (i) Magnasite Powder (ii) Magnasite Powder & Sodium Silicate.* (iii) Sodium Silicate (iv) Aluminium powder

Last Answer : (ii) Magnasite Powder & Sodium Silicate.*

Description : What is the heating time in OXY & LPG in SPW? (i) 2.0 - 3.5 minutes. (ii) 2.0 - 3.0 minutes. (iii) 2.0 - 2.5 minutes.* (iv) 3.0 - 4.5 minutes.

Last Answer : iii) 2.0 - 2.5 minutes

Description : Which one of the following impurity is not desirable in the soil used for brick formation a) Alkali b) Kankar c) Iron oxide d) Alkali & Kankar*

Last Answer : d) Alkali & Kankar*

Description : Piano wire is used for measuring the a) Distortion b)Camber in PSC girder c)Both a & b* d)None of above

Last Answer : c)Both a & b*

Description : Flood level gauge to be marked in a) All important bridges* b) All major bridges c) All minor & major bridges d) All bridges

Last Answer : a) All important bridges*

Description : Definition of minor bridge e) Single span less than 12m f) Total linear water way less than 18m g) Both a) & b)* h) None of the above

Last Answer : g) Both a) & b)*

Description : Definition of major bridge a) Single span of 12m & above b) Total linear water way more than 18m c) Both a) & b)* d) None of the above

Last Answer : c) Both a) & b)*

Description : Length of bridge timber in BG a) outer to outer of girder plus 305mm b) 2440mm c) whichever is more in a) & b)* d) whichever is less in a) & b)

Last Answer : c) whichever is more in a) & b)*

Description : Mostly long span rail-cum road bridges are provided with a) rocker & roller bearings b) segmental roller with oil bath* c) Sliding bearings d) centralised bearings

Last Answer : b) segmental roller with oil bath

Description : Periodical inspection of PSC & Composite girders a) Once in 3 years b) Once in 5 years * c) Once in 2 years d) Once in 5 years

Last Answer : b) Once in 5 years *

Description : O.D.C. Stands for (a) On direct current (b) Over dimensioned consignment* (c) None of them (d) Operating & gate

Last Answer : (b) Over dimensioned consignment*