Shelf life of Paint aluminium when paste and oil are mixed  
a) Oneday*
b) 1 year
c) 6 month
d) None of the above

1 Answer

Answer :

a) Oneday*

Related questions

Description : Shelf life of Paint Red Oxide Ready mixed (IS : 123) a) 4 month b) 1 year* c) 6 month d) None of the above

Last Answer : b) 1 year*

Description : Paint Aluminium confirms to IS

Last Answer : 2339

Description : While painting with Aluminium paint, a little quantity of ………..shall be added to the paint while doing the first coat to distinguish it from the second coat a) little blue paint* b) lamp black c) red paint d) green paint

Last Answer : a) little blue paint*

Description : In areas where there is severe corrosion Finishing coat will be a) Two coats of aluminium paint to IS : 2339* b) One coat of zinc chromate priming to IS : 104 e) Two cover coats of red oxide paint to IS :123 f) One coat of zinc chrome - red oxide priming to IS : 2074

Last Answer : a) Two coats of aluminium paint to IS : 2339*

Description : In areas where there is no severe corrosion Finishing coat will be a) Two coats of aluminium paint to IS : 2339 b) One coat of zinc chromate priming to IS : 104 c) Two cover coats of red oxide paint to IS :123* d) One coat of zinc chrome - red oxide priming to IS : 2074

Last Answer : c) Two cover coats of red oxide paint to IS :123*

Description : What is the Shelf life of mould ? (i) 6 months minimum. (ii) 8 months minimum (iii) 9 months minimum* (iv) 12 months minimum

Last Answer : (iii) 9 months minimum*

Description : Second coat of paint is done after minim. of (i) 2 Hrs after first coat (ii) 4 Hrs after first coat (i) 6 Hrs after first coat (iv) 8 Hrs. after first coat

Last Answer : (iv) 8 Hrs. after first coat

Description : Who has taken maximum wickets in oneday internationals?

Last Answer : Mutthiah Muralitharan

Description : Crucible is repaired by? (i) Magnasite Powder (ii) Magnasite Powder & Sodium Silicate.* (iii) Sodium Silicate (iv) Aluminium powder

Last Answer : (ii) Magnasite Powder & Sodium Silicate.*

Description : Early tapping will cause defect of? (i) No defect (ii) Inclusion of slag* (iii) Inclusion of aluminium (iv) Inclusion of ferrou

Last Answer : (ii) Inclusion of slag*

Description : Name the material which is separated from molten steel during chemical reaction of A.T welding? (i) Aluminium oxide (slag). * (ii) Ferrous Oxide (iii) Aluminium (iv) Ferrous

Last Answer : (i) Aluminium oxide (slag). *

Description : Foundation and substructure of the bridge should be inspected by SE/P.Way/Works a) Once a year any time b) Once a year before monsoon* c) Once a year after monsoon d) Once in 3 month

Last Answer : b) Once a year before monsoon*

Description : Lubrication of ERC and inserts in corrosion prone areas and platform line is done:- (a) Once in a month. (b) Once in a fortnight. (c) Once in a week. (d) Once in a year.*

Last Answer : (d) Once in a year.*

Description : Name the paint used in A.T. Welding painting? (i) Black Paint (ii) Bituminous black IS:9862-1981.* (iii) Any type of black paint (iv) None of the above

Last Answer : (ii) Bituminous black IS:9862-1981.*

Description : Paint Zinc chromate Red oxide primer confirms to IS

Last Answer : 2074

Description : Paint Zinc chromate primer confirms to IS

Last Answer : 104

Description : While painting with red oxide paint, a little quantity of ………..shall be added to the paint while doing the first coat to distinguish it from the second coat a) little blue paint b) lamp black* c) red paint d) green paint

Last Answer : b) lamp black*

Description : Paint is the mixture of ……. a) Binder, Pigment & Solvent* b) Binder & Pigment c) Binder & Solvent d) None of the above

Last Answer : a) Binder, Pigment & Solvent*

Description : Elcometer is used to measure the ……….. a) cross level b) Gauge c) Thickness of paint* d) All the above

Last Answer : c) Thickness of paint*

Description : Sand is mixed with lime to a) Reduced cost b) Reduced setting time c) Prevent shrinkage and cracking* d) Improve visual appearance

Last Answer : c) Prevent shrinkage and cracking

Description : Sensitivity calibration against temp. variation shall be carried out. (i) At least once in month* (ii) quarterly. (iii) at least once in six months (iv) Any of above.

Last Answer : i) At least once in month*

Description : What is the testing frequency of new AT weld ? (i) Just after the welding (ii) After 7 days of welding (iii) With in the one month of welding* (iv) None of the above

Last Answer : iii) With in the one month of welding*

Description : Special inspection of distressed bridges Group II shall be carried out by Inspector (Concerned) is a) Once in three months* b) Once in two months c) Once in a month d) Once in six months

Last Answer : a) Once in three months*

Description : Special inspection of distressed bridges shall be carried out by Asst. Engineer is a) Once in three months b) Once in two months* c) Once in a month d) Once in six months

Last Answer : b) Once in two months*

Description : What is the life of portion? (i) 2 years (ii) No specific life.* (ii) 6 months (iv) 1 year

Last Answer : (ii) No specific life.*

Description : How much rail ends are cleaned with Kerosene Oil and steel wire brush? (i) Minimum 100 mm both side (ii) Minimum 50 mm both side.* (iii) No need (iv) As decided by site supervisor

Last Answer : (ii) Minimum 50 mm both side.*

Description : Putty is made up of a) White lead and turpentine b) Powdered chalk and raw linseed oil* c) Red lead and linseed oil d) Zinc oxide and boiled linseed oil

Last Answer : b) Powdered chalk and raw linseed oil*

Description : Linseed oil is used in Paints as a a) Vehicle b) Base c) Drier* d) Thinner

Last Answer : c) Drier*

Description : Mostly long span rail-cum road bridges are provided with a) rocker & roller bearings b) segmental roller with oil bath* c) Sliding bearings d) centralised bearings

Last Answer : b) segmental roller with oil bath

Description : What is the Life of luting sand ? (i) No defined * (ii) 6 months (iii) 9 months

Last Answer : (i) No defined *

Description : Normal life of detonators is e. 5 years f. 10 years g. 7 years * h. 6 years.

Last Answer : g. 7 years *

Description : Periodical Census of traffic at unmanned level Crossings should be done once in a) Once in 6 years b) Every year c) Once in 3 years* d) Once in 5 years

Last Answer : c) Once in 3 years*

Description : 'Hinterland' refers to: (a) continental shelf in the sea from which oil can be extracted (b) natural harbour used for international trade (c) land region extending from a sea port (d) abandoned sea port where trade was carried out initially

Last Answer : Ans: (c)

Description : Mumbai High Oil Fields are located on the – (1) Continental Shelf of the Arabian Sea (2) West coastal plain (3) Western Ghats (4) Interior part of the Deccan

Last Answer : (1) Continental Shelf of the Arabian Sea Explanation: Mumbai High Oil Fields are located on the Continental Shelf of the Arabian Sea.

Description : Power tillers are popularly available in hp range of q. 6-12 hp r. 12-20 hp s. 1-6 hp t. 20-50 hp

Last Answer : q. 6-12 hp

Description : Number of urinals & latrines to be provided on ‘A’ category stations as per norms on main essential facilities are (a) 15 (b) 10* (c) 8 (d) 6

Last Answer : (b) 10*

Description : Numbers of latrines on ‘D’ category of stations as per norms for essential amenities is (a) 2 (b) 4* (c) 6 (d) 10

Last Answer : (b) 4*

Description : Numbers of latrines on ‘C’ category of stations as per norms for essential amenities is (a) 2 * (b) 4 (c) 6 (d) 10

Last Answer : (a) 2 *

Description : Numbers of latrines on ‘B’ category of stations as per norms for essential amenities is (a) 2 (b) 4 (c) 6 * (d) 10

Last Answer : (c) 6

Description : Numbers of latrines on ‘A’ category of stations as per norms for essential amenities is (a) 2 (b) 4 (c) 6 (d) 10*

Last Answer : d) 10*

Description : Numbers of taps on each platform of ‘C’ category station as per norms of minimum essential facility criteria are (a) 6* (b) 8 (c) 12 (d) 15

Last Answer : (a) 6*

Description : Numbers of taps on each platform of ‘B’ category station as per norms of minimum essential facility criteria are (a) 6 (b) 8 (c) 12* (d) 15

Last Answer : (c) 12*

Description : Numbers of taps on each platform of ‘A’ category station as per norms of minimum essential facility criteria are (a) 6 (b) 8 (c) 12 (d) 15*

Last Answer : d) 15*

Description : Category “B” station are those, where annual passenger earnings are (a) Rs. 6 to 10 crores (b) Rs. 3 to 6 crores* (c) Rs. 1 to 3 crores (d) Less than Rs. 1 crore

Last Answer : (b) Rs. 3 to 6 crores*

Description : For Category “A” stations, the annual passenger earning should be (a) Rs. 10 crores of more (b) Rs. 6 crores or more* (c) Rs. 3 crores or more (d) Less than Rs. 3 crores

Last Answer : b) Rs. 6 crores or more*

Description : For new lines, width of formation in bank for M.G. single line is (a) 5.25 m (b) 5.85 m* (c ) 6.25 m (e) 6.85 m

Last Answer : (b) 5.85 m*

Description : For new lines, width of formation in cutting for M.G. single line is (a) 5.25 m* (b) 5.85 m (c) 6.25 m (d) 6.85 m

Last Answer : (a) 5.25 m*

Description : Formation width for cuttings for B.G. single line section is (a) 5.40 m (b) 6.20 m (c) 6.25 m* (d) 6.50 m

Last Answer : (c) 6.25 m*

Description : Formation width for banks for B.G. single line section is (a) 6.10 m (b) 6.50 m (c) 6.85 m* (d) 7.0 m

Last Answer : (c) 6.85 m*

Description : In case of emergency, land can be acquired urgently by operation of special section (a) Section 4 & 6 (b) Section 9 & 17* (c) Section 8 & 10 (d) None of them

Last Answer : (b) Section 9 & 17*