For painting, the unit of rate is per
a) Sqm  
b) cum  
c) 10sqm *  
d) 10cum

1 Answer

Answer :

c) 10sqm *

Related questions

Description : While preparing a detailed estimate (A) Dimension should be measured correct to 0.01 m (B) Area should be measured correct to 0.01 sqm (C) Volume should be measured correct to 0.01 cum (D) All the above

Last Answer : (D) All the above

Description : Mostly long span rail-cum road bridges are provided with a) rocker & roller bearings b) segmental roller with oil bath* c) Sliding bearings d) centralised bearings

Last Answer : b) segmental roller with oil bath

Description : Name the paint used in A.T. Welding painting? (i) Black Paint (ii) Bituminous black IS:9862-1981.* (iii) Any type of black paint (iv) None of the above

Last Answer : (ii) Bituminous black IS:9862-1981.*

Description : Painting of weld is done up to (i) 10 CM minimum both side of weld & on welded surface .* (ii) 15 CM minimum both side of weld & on welded surface (iii) 20 CM minimum both side of weld & on welded surface (iv) None of the above

Last Answer : (i) 10 CM minimum both side of weld & on welded surface .*

Description : When was the collar painting done ? (i) After the welding * (ii) after one week of welding (iii) After 15 days of welding (iv) None of the above

Last Answer : (i) After the welding *

Description : Painting during night and early morning avoided because of

Last Answer : dew

Description : Corrosion in Steel girder bridges may be prevented by : a) Protective coatings by painting b) Metallising c) Use of epoxy based paints d) All the above*

Last Answer : d) All the above*

Description : While painting with Aluminium paint, a little quantity of ………..shall be added to the paint while doing the first coat to distinguish it from the second coat a) little blue paint* b) lamp black c) red paint d) green paint

Last Answer : a) little blue paint*

Description : While painting with red oxide paint, a little quantity of ………..shall be added to the paint while doing the first coat to distinguish it from the second coat a) little blue paint b) lamp black* c) red paint d) green paint

Last Answer : b) lamp black*

Description : When as small area of girder bridge should be painted when requiring immediate painting; known as a) patch painting* b) periodical through painting c) Any of the above d) None of the above

Last Answer : a) patch painting*

Description : Entire steel work of girder bridge should be painted at regular interval; known as a) patch painting b) periodical through painting* c) Any of the above d) None of the above

Last Answer : b) periodical through painting*

Description : The date of painting of steel work should be painted in white on the out side of the left girder a) of the 1st span only b) first span only but on all spans for Imp. Bridges* c) of the all spans d) None of the above

Last Answer : b) first span only but on all spans for Imp. Bridges*

Description : The dry density of soil is a) Always greater than the saturated density b) Weight of soil solids per unit of total volume prior to drying* c) Total weight of soil solids per unit of its total volume d) Total weight of soil mass per unit of its total volume

Last Answer : b) Weight of soil solids per unit of total volume prior to drying*

Description : Specific yield of well is a) Discharge per unit time b) Yield of well per metre of drawdown* c) Velocity of water per unit time d)None of the above

Last Answer : b) Yield of well per metre of drawdown*

Description : The expected out turn of 2.5 cm cement concrete floor per mansion per day (A) 2.5 sqm (B) 5.0 sqm (C) 7.5 sqm (D) 10 sqm

Last Answer : (C) 7.5 sqm

Description : A rural water supply serves a population of 10, 000 at the rate of 50 litres per capita per day . For the chlorine dose of 2 PPM the required amount of bleaching powder with 20% available chlorine will be a. 0.5 kg b. 5 kg * c. 10 kg d. 15 kg

Last Answer : b. 5 kg

Description : Swenson-Walker crystalliser is a __________ unit. (A) Continuous (B) Batch (C) Semi-batch (D) Cooling (adiabatic)-cum-evaporation

Last Answer : (A) Continuous

Description : The expected out turn for earth work in excavation in ordinary soil per workman per day is (A) 1.00 cum (B) 2.00 cum (C) 3.00 cum (D) 4.00 cum

Last Answer : (C) 3.00 cum

Description : If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost ... the cost of manual excavation is (A) 500 cum (B) 1000 cum (C) 1500 cum (D) 2000 cum

Last Answer : (A) 500 cum

Description : A contractor wishes to determine a suitable combination of manual labour and machine work for the excavation of a multistory construction. For every cum of excavation, 3 man-hours are needed; or 0.2 machine-hour. Costs ... total cost will be (a) 1500 cum (b) 1800 cum (c) 2250 cum (d) 2500 cum

Last Answer : (d) 2500 cum

Description : A level crossing qualifies for construction of Road Over Bridge/ Under Bridge on Cost sharing basis with State Government when the Train Vehicle Unit is more than a) 50,000 b) 1, 00,000* c) 3, 00,000 d) 5, 00,000

Last Answer : b) 1, 00,000*

Description : TVU is abbreviated for a) Track vulnerable unit b) Train vehicle unit * c) Total vehicle unit d) Traffic variation unit

Last Answer : b) Train vehicle unit *

Description : As per norms for desirable amenity as given to model station, the retiring rooms should be provided on stations classified as --- (a) A & B* (b) A,B & C (c) A,B,C & D (d) A, B,C, D & E (e) A

Last Answer : a) A & B*

Description : As per norms for desirable amenity as given to model station, the clock rooms should be provided on stations classified as --- (a) A & B * (b) A,B & C (c) A,B,C & D (d) A, B,C, D & E (e) A

Last Answer : (a) A & B *

Description : As per norms for desirable amenity as given to model station, the water coolers should be provided on stations classified as --- (a) A & B (b) A,B & C (c) A,B,C & D* (d) A, B,C, D & E (e) A

Last Answer : (c) A,B,C & D*

Description : As per norms for desirable amenity as given to model station, the parking facility/circulating area should be provided on stations classified as --- (a) A & B (b) A,B & C (c) A,B,C & D* (d) A, B,C, D & E

Last Answer : (c) A,B,C & D*

Description : As per norms for desirable amenity as given to model station, the public address system should be provided on stations classified as --- (a) A & B (b) A,B & C* (c) A,B,C & D (d) A, B,C, D & E (e) A

Last Answer : (b) A,B & C*

Description : As per norms for desirable amenity as given to model station, the book stalls should be provided on stations classified as --- (a) A & B (b) A,B & C* (c) A,B,C & D (d) A, B,C, D & E (e) A

Last Answer : (b) A,B & C*

Description : As per norms for desirable amenity as given to model station, the refreshment rooms should be provided on stations classified as --- (a) A & B* (b) A,B & C (c) A,B,C & D (d) A, B,C, D & E (e) A

Last Answer : (a) A & B*

Description : Number of taps on platform as per norms for recommended level of facilities (a) One for every coach (b) One for alternate coach* (c) One every 200 metres distance (d) At the discretion of DRM

Last Answer : (b) One for alternate coach*

Description : Number of urinals & latrines to be provided on ‘A’ category stations as per norms on main essential facilities are (a) 15 (b) 10* (c) 8 (d) 6

Last Answer : (b) 10*

Description : Number of taps to be provided on ‘A’ category stations on each platform as per norms of minimum essential facilities are (a) 20 taps (b) 15 taps (c) 12 taps* (d) One taps for each bogie

Last Answer : (c) 12 taps*

Description : Latrines & urinals must be provided on these type of stations as per minimum essential facility criteria (a) A, B, C, D, E & F type station (b) A,B,C,D & E type station* (c) A,B,C & D type station (d) A, B & C type station

Last Answer : (b) A,B,C,D & E type station*

Description : Foot over bridge must be provided on the following type of stations as per minimum essential facility criteria (a) A, B, C, & D class station (b) A,B & C class station* (c) A, & B class station (d) Only A class station

Last Answer : b) A,B & C class station*

Description : For ‘B’ category stations as per minimum essential facility it is necessary to provide (a) High level platform (b) Medium level platform* (c) Rail level platform (d) All the above

Last Answer : (b) Medium level platform*

Description : Numbers of latrines on ‘D’ category of stations as per norms for essential amenities is (a) 2 (b) 4* (c) 6 (d) 10

Last Answer : (b) 4*

Description : Numbers of latrines on ‘C’ category of stations as per norms for essential amenities is (a) 2 * (b) 4 (c) 6 (d) 10

Last Answer : (a) 2 *

Description : Numbers of latrines on ‘B’ category of stations as per norms for essential amenities is (a) 2 (b) 4 (c) 6 * (d) 10

Last Answer : (c) 6

Description : Numbers of latrines on ‘A’ category of stations as per norms for essential amenities is (a) 2 (b) 4 (c) 6 (d) 10*

Last Answer : d) 10*

Description : Numbers of taps on each platform of ‘C’ category station as per norms of minimum essential facility criteria are (a) 6* (b) 8 (c) 12 (d) 15

Last Answer : (a) 6*

Description : Numbers of taps on each platform of ‘B’ category station as per norms of minimum essential facility criteria are (a) 6 (b) 8 (c) 12* (d) 15

Last Answer : (c) 12*

Description : Numbers of taps on each platform of ‘A’ category station as per norms of minimum essential facility criteria are (a) 6 (b) 8 (c) 12 (d) 15*

Last Answer : d) 15*

Description : eFor design of sewers for sullage, minimum velocity of ---- metres per second is taken. (a) 1.0 m sec* (b) 1.5 m/sec (c) 2.0 m/sec (d) 2.5 m/sec

Last Answer : (a) 1.0 m sec*

Description : Weather traffic block is required for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.

Description : Weather protection of track is required during block for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.*

Description : he minimum compressive strength of first class brick should be a) 75 kg per centimeter square b) 90 kg per centimeter square c) 100 kg per centimeter square* d) 120 kg per centimeter square

Last Answer : c) 100 kg per centimeter square*

Description : As per GCC Engineer shall mean_____

Last Answer : DEN / XEN

Description : Initial inspection for PSC girders / Welded girder bridges as per IRBM 1998 a) Within one year of installation* b) Once in 3 years d) Once in 2 years d) Once in 5 years

Last Answer : a) Within one year of installation*

Description : Requirement of water for apron washing a. 5 litre per square metre per day b. 10 litre per square metre per day * c. 15 litre per square metre per day d. 20 litre per square metre per day

Last Answer : b. 10 litre per square metre per day *

Description : Requirement of water for platform washing is a)5 litre per square metre per day * b)10 litre per square meter per day c) 15 litre per square metre per day d)20 litre per square metre per day

Last Answer : a)5 litre per square metre per day *