Requirement of water for apron washing
a. 5 litre per square metre per day  
b. 10 litre per square metre per day *
c. 15 litre per square metre per day
d. 20 litre per square metre per day

1 Answer

Answer :

b. 10 litre per square metre per day *

Related questions

Description : Requirement of water for platform washing is a)5 litre per square metre per day * b)10 litre per square meter per day c) 15 litre per square metre per day d)20 litre per square metre per day

Last Answer : a)5 litre per square metre per day *

Description : Specific yield of well is a) Discharge per unit time b) Yield of well per metre of drawdown* c) Velocity of water per unit time d)None of the above

Last Answer : b) Yield of well per metre of drawdown*

Description : While estimating the qualities for the construction of a building, the correct metric unit is (A) Metre for length (B) Cubic metre for area (C) Square metres for volume (D) Litre for capacity

Last Answer : (D) Litre for capacity

Description : Demand of water for passengers on railway station is a)10 litres per passenger b)15 litres per passenger c) 20 litres for passenger d) 25 litres per passenger*

Last Answer : d) 25 litres per passenger*

Description : The spacing of tube wells should generally be more than ----------from the circle of influence a)10 metre b)50 metre c)100 metre* d) 500 metre

Last Answer : c)100 metre*

Description : A rural water supply serves a population of 10, 000 at the rate of 50 litres per capita per day . For the chlorine dose of 2 PPM the required amount of bleaching powder with 20% available chlorine will be a. 0.5 kg b. 5 kg * c. 10 kg d. 15 kg

Last Answer : b. 5 kg

Description : The main drawback of centrifugal pump is a)necessity of priming b) discharge from pump varies with the load of water c) For high heads efficiency is low up to 50% d) the suction lift is limited to 6 metre e) all of the above*

Last Answer : e) all of the above*

Description : While taking sample of water from well, sample is collected a)About 2 metre above the bottom of wel b) About 1 metre above the bottom of well * c)About 1 metres below the bottom of well d) none of the above

Last Answer : b) About 1 metre above the bottom of well *

Description : In new Rail as well as second hand rails how much end bends of the rails in lateral direction are permitted when checked with one metre straight edge before welding? (i) ± 0.2 mm in lateral direction (ii) ± 0.3 mm in lateral direction (iii) ± 0.5 mm in latera

Last Answer : (iii) ± 0.5 mm in latera

Description : RBG loading caters for maaaaximum axle load of…….tones for locomotive with trailing loadof…… tonnes/metre of track with maximum axle load of…….tonnes for wagons a)22.9,7.67,25 b)22.5,7.67,22.9* c)25,7.67,22.9, d)None of above

Last Answer : b)22.5,7.67,22.9*

Description : GML loading caters for maaaaximum axle load of…….tonnes for locomotive with trailing load of………tonnes/metre. a)22.9,7.67* b)22.5,7.67 c)25,7.67 d)None of above

Last Answer : a)22.9,7.67*

Description : While doing final location survey, the centre line is fully marked with pegs at --- metre distance (a) 10m (b) 20m* (c) 30m (d) 50m

Last Answer : (b) 20m*

Description : Number of taps to be provided on ‘A’ category stations on each platform as per norms of minimum essential facilities are (a) 20 taps (b) 15 taps (c) 12 taps* (d) One taps for each bogie

Last Answer : (c) 12 taps*

Description : The volume of a closed square based rectangular box is 1000 cubic metre. The cost of constructing the base is 15 paise per square metre and the cost o

Last Answer : The volume of a closed square based rectangular box is 1000 cubic metre. The cost of ... dimensions of box for minimum cost of construction.

Description : Cost of fencing a circular plot at the rate of Rs.15 per metre is Rs.3, 300. What will be the cost of flooring the plot at the rate of Rs.100 per square metre? a) Rs.3, 85,000 b) Rs.4, 70,000 c) Rs.2, 25,000 d) Rs.3, 50,000 e) Rs.2, 95,000

Last Answer : Perimeter of plot = 3300/15 = 220 meter 2πr = 220 2 × 22/7 × r = 220 r = 35 m. Area of plot = πr^2 = 22/7 × 35 × 35 = 3850 mt^2 Cost of flooring = 3850 × 100=Rs. 385000 Answer: a)

Description : The concrete under water minimum grade of cement recommended by IS code a) M 10 b) M 15 c) M 20* d) M 25

Last Answer : c) M 20*

Description : The project report of the reconnaissance survey should be accompanied by Index map area at a scale of 1 cm = ---- km. (a) 2.5 km* (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km

Last Answer : (a) 2.5 km*

Description : The project report of the reconnaissance survey should be accompanied by a map of the area at a scale of 1 cm= --- km. (a) 2.5 km (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km*

Last Answer : (e) 20.0 km*

Description : Minm. deflection during transverse breaking load test is? (i) 5 mm (ii) 10 mm (iii) 15 mm* (iv) 20 mm

Last Answer : (iii) 15 mm*

Description : The danger level should be marked with a bright red band …… wide centrally over a white band …… wide for a length of……… a) 5 cm, 10 cm, 60 cms* b) 10 cm, 20 cm, 60 cm c) 15 cm, 30 mm, 60 cm d) None of the above

Last Answer : a) 5 cm, 10 cm, 60 cms*

Description : Duration of short hooter is…….. (a) 5 seconds* (b) 10 seconds (c) 15 seconds (d) 20 seconds

Last Answer : (a) 5 seconds*

Description : he minimum compressive strength of first class brick should be a) 75 kg per centimeter square b) 90 kg per centimeter square c) 100 kg per centimeter square* d) 120 kg per centimeter square

Last Answer : c) 100 kg per centimeter square*

Description : The bulk density of aggregates, is generally expressed as (A) tonnes/cubic metre (B) kg/cubic metre (C) kg/litre (D) g/cm3

Last Answer : (C) kg/litre

Description : With regard to standard of quality of drinking water as laid down by Indian Railway , the requirement (desirable) limit of total dissolved solids should not be more than---------- mg/l a)200 b) 300 c) 400

Last Answer : d) 500*

Description : Number of urinals & latrines to be provided on ‘A’ category stations as per norms on main essential facilities are (a) 15 (b) 10* (c) 8 (d) 6

Last Answer : (b) 10*

Description : Distance between the two detonators should be (i) 15 Mt. (ii) 10 Mt.* (iii) 20 Mt (iv) None of the above

Last Answer : (ii) 10 Mt.*

Description : Painting of weld is done up to (i) 10 CM minimum both side of weld & on welded surface .* (ii) 15 CM minimum both side of weld & on welded surface (iii) 20 CM minimum both side of weld & on welded surface (iv) None of the above

Last Answer : (i) 10 CM minimum both side of weld & on welded surface .*

Description : Speed breaker has to be provided on road approaches of level crossing at maximum feasible distance within Railway boundary but not exceeding a) 10 meters b) 15 meters c) 20 meters* d) 200 meters

Last Answer : c) 20 meters*

Description : From distribution main of 50 mm size, number of service pipes of 15 mm size can be taken off are ------ a) 6 b)10 c) 12 e):20*

Last Answer : e):20*

Description : Flat tyre causes maximum damage at a speed of (a) 90 to 100 kmph (b) 25 to 30 kmph* (c) 10 to 15 kmph (d) 15 to 20 kmph

Last Answer : (b) 25 to 30 kmph*

Description : Minimum speed restriction to be imposed for Track renewal is:- (a) Stop dead & 10 Kmph (b) 10 Kmph (c) 15 Kmph (d) 20 Kmph*

Last Answer : (d) 20 Kmph*

Description : Points & Crossing is laid at a cant of a. 1 in 20 b. 1 in 10 c. 1 in 15 d. NIL*

Last Answer : d. NIL*

Description : What will the concentration of `[Ca^(+2)]` in a sample of 1 litre hard water if after treatment with washing soda 10 g insoluable `CaCO_(3)` is precip

Last Answer : What will the concentration of `[Ca^(+2)]` in a sample of 1 litre hard water if after treatment with washing soda 10 g ... B. 0.1 M C. 0.3 M D. 0.4 M

Description : The commonly used lime in white washing is a) Hydraulic lime b) Slaked lime c) Plain lime d) White lime*

Last Answer : d) White lime*

Description : What is the most important requirement for the people of a flood hit area?

Last Answer : Inoculation against cholera

Description : “Composite sleeper index” is employed to determine a) sleeper density requirement b) number of fixtures required for a particular type of sleeper c) durability of sleeper d) mechanical strength of wooden sleepers and thereby gives its suitability as to be used as li sleepers.*

Last Answer : d) mechanical strength of wooden sleepers and thereby gives its suitability as to be used as li sleepers.*

Description : Speed breaker of approved design shall be provided on either side of level crossing at ------ within Railway boundary a) 5 meters b) 15 meters c) 20 meters* d0 30 meters

Last Answer : c) 20 meters

Description : Permissible speed of Turnout with 1 in 8.5 curved switches a. 40 kmph b. 25 kmph* c. 15 kmph d. 20 kmph

Last Answer : b. 25 kmph*

Description : Maximum distance covered in a day by a Patrolman should not normally exceed q. 2 km. r. 5 km. s. 10 km. t. 20 km .*

Last Answer : t. 20 km

Description : Numbers of taps on each platform of ‘C’ category station as per norms of minimum essential facility criteria are (a) 6* (b) 8 (c) 12 (d) 15

Last Answer : (a) 6*

Description : Numbers of taps on each platform of ‘B’ category station as per norms of minimum essential facility criteria are (a) 6 (b) 8 (c) 12* (d) 15

Last Answer : (c) 12*

Description : Numbers of taps on each platform of ‘A’ category station as per norms of minimum essential facility criteria are (a) 6 (b) 8 (c) 12 (d) 15*

Last Answer : d) 15*

Description : What is the time of removal the tensor from the newly executed A T Weld? (i) 15 minutes after pouring. (ii) 20 minutes after pouring* (iii) 25 minutes after pouring. (iv) 30 minutes after pouring.

Last Answer : (ii) 20 minutes after pouring*

Description : Normal Reaction time in SPW technique? (i) 17 ± 3 seconds. (ii) 15 ± 3 seconds (iii) 23 ± 3 seconds (iv) 20 ± 3 seconds*

Last Answer : (iv) 20 ± 3 seconds*

Description : To provide inverted filter to improve the hearing capacity of soil the plasticity index of blanketing material should not be greater than a) 15* b) 20 c) 27 d) 35

Last Answer : a) 15*

Description : arthwork in embankment for railway with manual compaction should be done in layers not exceeding-------------- a) 15 centimeter b) 20 centimeters c) 25 centimeters d) 30 centimeters*

Last Answer : d) 30 centimeters*

Description : Permissible speed of Turnout with 1 in 12 curved switches a. 40 kmph* b. 25 kmph c. 15 kmph d. 20 kmph

Last Answer : a. 40 kmph*

Description : Tilting of rails is done at a slope of a. 1 in 30 b. 1 in 25 c. 1 in 20* d. 1 in 15

Last Answer : c. 1 in 20*

Description : A rhombus shaped sheet with perimeter 40 and digonals are 12 cm is painted on bith sides at the rate of rs 5 per metre square. Find the cost of painting -Maths 9th

Last Answer : Let ABCD be a rhombus, then AB=BC=CD=DA=x Perimeter of rhombus =40cm ⇒4x=40cm⇒x=10cm ∴AB=BC=CD=DA=10cm In △ABC,S=2a+b+c​=210+10+12​=16cm ar△ABC=16(16−10)(16−10)(16−12)​=16×6×6×4​=48cm2ar.ABCD=2×48=96cm2 Cost of painting the sheet =Rs(5×96×2)=Rs960 [Both sides]

Description : A rhombus shaped sheet with perimeter 40 and digonals are 12 cm is painted on bith sides at the rate of rs 5 per metre square. Find the cost of painting -Maths 9th

Last Answer : Let ABCD be a rhombus, then AB=BC=CD=DA=x Perimeter of rhombus =40cm ⇒4x=40cm⇒x=10cm ∴AB=BC=CD=DA=10cm In △ABC,S=2a+b+c​=210+10+12​=16cm ar△ABC=16(16−10)(16−10)(16−12)​=16×6×6×4​=48cm2ar.ABCD=2×48=96cm2 Cost of painting the sheet =Rs(5×96×2)=Rs960 [Both sides]