The form Work including the props can be removed from beams, only after
(A) 3 day
(B) 7 days
(C) 14 days
(D) 21 days

1 Answer

Answer :

Answer: Option C

Related questions

Description : The form work from the slabs excluding props, can be removed only after (A) 1 day (B) 4 days (C) 7 days (D) 14 days

Last Answer : Option B

Description : The form work from the slabs excluding props, can be removed only after (A) 1 day (B) 4 days (C) 7 days (D) 14 days

Last Answer : Answer: Option B

Description : The form work from the sides of beams can be removed only after (A) 1 day (B) 4 days (C) 7 days (D) 14 days

Last Answer : Answer: Option A

Description : Under normal conditions using an ordinary cement, the period of removal of the form work, is: (A) 7 days for beam soffits (B) 14 days for bottom slabs of spans 4.6 m and more (C) 21 days for bottom beams over 6 m spans (D) All the above

Last Answer : Answer: Option D

Description : The form work from the underside of slabs, can be removed only after (A) 1 day (B) 4 days (C) 7 days (D) 14 day

Last Answer : Answer: Option C

Description : For walls, columns and vertical faces of all structural members, the form work is generally removed after (A) 24 to 48 hours (B) 3 days (C) 7 days (D) 14 days

Last Answer : Answer: Option A

Description : The shuttering of a hall measuring 4 m × 5 m, can be removed after (A) 5 days (B) 7 days (C) 10 days (D) 14 day

Last Answer : Answer: Option B

Description : How long will it take for the concrete to achieve 100% of its strength? (A) 7 days (B) 14 days (C) 21 days (D) 28 day

Last Answer : Answer: Option D

Description : Newly constructed pavement with ordinary Portland cement attains its working strength after (A) 7 days (B) 14 days (C) 21 days (D) 28 days

Last Answer : Answer: Option D

Description : In case of multi-storeyed buildings, the forms to be removed first are (A) Sides of beams and girders (B) Column forms (C) Bottom of beams and girders (D) All the above at the same time

Last Answer : Answer: Option A

Description : The Secretary of a Company should file copies of Special Resolution passed at Extraordinary General Meeting to the Registrar of Companies within– (A) 7 days (B) 14 days (C) 21 days (D) 30 days

Last Answer : Answer: 30 days

Description : At least how many days of prior notice is required for the impeachment to the President of India? (1) 7 days (2) 14 days (3) 21 days (4) 30 days

Last Answer : (2) 14 days Explanation: For impeachment of President of India at least fourteen days notice in writing is required.

Description : Specified compressive strength of concrete is obtained from cube tests at the end of (A) 3 days (B) 7 days (C) 21 days (D) 28 day

Last Answer : Answer: Option D

Description : According to IS specifications, the compressive strength of ordinary Portland cement after three days should not be less than (A) 7 MPa (B) 11.5 MPa (C) 16 MPa (D) 21 MPa

Last Answer : Answer: Option C

Description : Water required per bag of cement, is (A) 7 kg (B) 14 kg (C) 21 kg (D) 35 kg

Last Answer : (D) 35 kg

Description : How many natural numbers are factors of 26 including the number 1 and itself? a) 1 b) 7 c) 6 d) 21

Last Answer : b) 7

Description : An intermediate T-beam reinforced with two layers of tensile steel with clear cover 13 cm encasted with the floor of a hall 12 metres by 7 metres, is spaced at 3 metres from adjoining beams and if the width of the beam is ... breadth of the flange is (A) 300 cm (B) 233 cm (C) 176 cm (D) 236 cm

Last Answer : Answer: Option C

Description : For a continuous floor slab supported on beams, the ratio of end span length and intermediate span length, is (A) 0.6 (B) 0.7 (C) 0.8 (D) 0.9

Last Answer : Answer: Option D

Description : The floor slab of a building is supported on reinforced cement floor beams. The ratio of the end and intermediate spans is kept (A) 0.7 (B) 0.8 (C) 0.9 (D) 0.6

Last Answer : Answer: Option C

Description : The floor slab of a building is supported on reinforced cement floor beams. The ratio of the end and intermediate span is kept. (a) 0.7 (b) 0.8 (c) 0.9 (d) 0.6

Last Answer : (c) 0.9

Description : A and B working alone can finish a job in 5 days and 7 days respectively. They work at it alternately for a day. If A starts the work, find in how many days the job will be finished? a) 29/5 b) 11/5 c) 24/5 d) 21/5 e) None of these

Last Answer : Work done by A in one day = 1/5 and work done by B in one day = 1/7 They are working alternately. Therefore, Work done in first two day = (1/5 + 1/7) = 12/35 Work done in first four day = 24/35 Work done in ... = 4/35/1/7 = 4/5 of the day. Therefore Total days taken = 5 + 4/5 = 29/5 days Answer: b)

Description : A simply supported beam 6 m long and of effective depth 50 cm, carries a uniformly distributed load 2400 kg/m including its self weight. If the lever arm factor is 0.85 and permissible tensile stress of steel is 1400 kg/cm2 ... area of steel required, is (A) 14 cm (B) 15 cm2 (C) 16 cm2 (D) 17 cm

Last Answer : Answer: Option C

Description : Minutes of the annual general meeting must be prepared and signed by the chairman within– (A) 14 days of the meeting (B) 21 days of the meeting (C) 30 days of the meeting (D) 45 days of the meeting

Last Answer : Answer: 30 days of the meeting

Description : How can I give props to Comcast?

Last Answer : My experience is that Comcast does not rock – AT ALL. But then again, if they do rock from time to time this should be encouraged. This post should be enough in my opinion. In the (from my experience) unlikely event of a repeat performance maybe CNN would take it…

Description : Is there a good website for '30's,'40's, movie props for purchase?

Last Answer : ebay?

Description : Good sources to buy used movie props?

Last Answer : What a great question! I can’t believe no one answered it! try This site. Pretty cool stuff, though a little pricey.

Description : What kind of work does a prop in the theater do? Is it a difficult job?

Last Answer : The props provide props for the show and everything around them. Purchase of props, repairs, placement on the stage, etc ...

Description : Give Props To These Halloween Asscessories?

Last Answer : Whether planning a Halloween party, or simply decorating with frighteningly cool Halloween decor, finding unique props often takes creativity. With a little imagination, one can make some believable ... Halloween specialty stores for accessories for young children, unless you want to over spend.

Description : Liven Up Your Costume With Halloween Props?

Last Answer : Halloween is a time to get creative with costumes. While most costumes don't absolutely need props to make them convincing, incorporating interesting objects is a good way to make a costume stand out ... is scour your own house, costume shops and thrift stores and see what treasures you can find.

Description : Where can I buy Halloween props?

Last Answer : Find props for the haunted house should not be too difficult. The following website should give you all the information you need in order to purchase the props: www.halloweenexpress.com/decorations-props-c-5.html

Description : Which can be described as an ideal teaching technique? Options: A) Repetitive drill and rote memorization B) Using props and manipulative to help students understand abstract concept. C) Encouraging in group discussion for logical thinking. D) both (b) and (c)

Last Answer : D) both (b) and (c)  

Description : ___ amino acids are commonly found in milk proteins, including the essential amino acids. a) 7 b) 12 c) 14 d) 19

Last Answer : d) 19

Description : Muller Breslau's principle for obtaining influence lines is applicable to (i) Trusses (ii) Statically determinate beams and frames (iii) Statically indeterminate structures, the material of which is elastic and follows Hooke's law (iv ... B) (i), (ii) and (iv) (C) (i) and (ii) (D) Only (i)

Last Answer : (A) (i), (ii) and (iii)

Description : The Castigliano's second theorem can be used to compute deflections (A) In statically determinate structures only (B) For any type of structure (C) At the point under the load only (D) For beams and frames only

Last Answer : (B) For any type of structure

Description : The point of contraflexure occurs in (A) Cantilever beams only (B) Continuous beams only (C) Over hanging beams only (D) All types of beams

Last Answer : (C) Over hanging beams only

Description : Pre-stress loss due to friction occurs (A) Only in post-tensioned beams (B) Only in pre-tensioned beams (C) In both post-tensioned and pre-tensioned beams (D) None of the above

Last Answer : Answer: Option A

Description : The deep beams are designed for (a) Shear force only (b) Bending moment only (c) Both S.F & B.M (d) Bearing

Last Answer : (b) Bending moment only

Description : A and B together can complete a work in 24 days. A alone can complete it in 40 days. If B does the work only for half a day daily, then in how many days A and B together will complete the work? a) 24 days b) 15 days c) 21 days d) 19 days

Last Answer : A B’s 1 day’s work = (1/24 -1/40) =(5-3)/120 =2/120=>1/60 Now, (A + B)’s 1 day’s work = (1/40 +1/60) =(3+2)/120 =5/120 So, A and B together will complete the work in 120/5 = 24 days.

Description : The application of elastic theory to the beams is based on the assumption that (a) At any cross-section, plane sections before bending remain plane after bending (b) All tensile stresses are taken ... reinforcement is free from initial stresses when it is embedded in concrete. (d) All of the above

Last Answer : (d) All of the above

Description : The lifespan of White Blood Cells is ----- day(s)? A. 1 – 5 days B. 3 – 7 days C. 4 – 8 days D. 5 – 21 days (Answer)

Last Answer : D. 5 – 21 days (Answer)

Description : For Ordinary Portland cement concrete exposed to dry and hot weather conditions, good moist curing period is [ A ] 7 days [ B ] 10 days [ C ] 14 days [ D ] None of the above

Last Answer : [ B ] 10 days

Description : 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50'. What number is missing? -Riddles

Last Answer : 22

Description : Which of the following is greater between each of the two numbers ? (i) `3^(30), 7^(15)` (ii) `2^(25), 4^(14)` (iii) `2^(21)` and `3^(14)`

Last Answer : Which of the following is greater between each of the two numbers ? (i) `3^(30), 7^(15)` (ii) `2^(25), 4^(14)` (iii) `2^(21)` and `3^(14)`

Description : What is the pattern 4 7 8 14 12 21 16 28?

Last Answer : Starting with the 4... add 4 each time. From the 7... add 7 eachtime. The next four numbers in the series are... 20, 35, 24 &42

Description : In the hexaploid wheat, the haploid (n) and basic (x) numbers of chromosomes are (a) n = 21 and x = 21 (b) n = 21 and x = 14 (c) n = 21 and x = 7 (d) n = 7 and x = 21.

Last Answer : (c) n = 21 and x = 7

Description : For beams of uniform strength, if depth is constant,  (A) Width b M (B) Width b M (C) Width b 3 M (D) Width b 1/M

Last Answer : (A) Width b M

Description : Beams composed of more than one material, rigidly connected together so as to behave as one  piece, are known as  (A) Compound beams  (B) Indeterminate beams  (C) Determinate beams  (D) Composite beams

Last Answer : (D) Composite beams

Description : The assumption in the theory of bending of beams is:  (A) Material is homogeneous  (B) Material is isotropic  (C) Young's modulus is same in tension as well as in compression  (D) All the above 

Last Answer : (D) All the above