In estimation of cost functions, variations in a single activity level represents the

A. related total costs

B. related fixed cost

C. related variable cost

D. related per unit cost

1 Answer

Answer :

A. related total costs

Related questions

Description : Relationship based on unrelated level of activity and past data of cost is measured with help of A. cost estimation B. price estimation C. unit estimation D. production estimation

Last Answer : A. cost estimation

Description : A company makes a single product and incurs fixed costs of Rs. 30,000 per annum. Variable cost per unit is Rs. 5 and each unit sells for Rs. 15. Annual sales demand is 7,000 units. The breakeven point is: (a) 2,000 units (b) 3,000 units (c) 4,000 units (d) 6,000 units

Last Answer : (b) 3,000 units

Description : A Unit Price (UP) contract provides: 1. a reimbursement of allowable costs plus a fixed fee which is paid proportionately as the  contract progresses  2. a reimbursement of allowable cost of services ... unit rates and the  final price is dependent on the quantities needed to carry out the work.

Last Answer : 4. a fixed price where the supplier agrees to furnish goods and services at unit rates and the  final price is dependent on the quantities needed to carry out the work

Description : To determine the breakeven point in units, one divides fixed costs by: A)total costs. B)variable costs times price. C)price minus variable costs. D)price per unit.

Last Answer : C)price minus variable costs.

Description : This activity is undertaken once the development activities start? A. Project Planning B. Project Monitoring and Control C. Project size estimation D. Project cost estimation

Last Answer : B. Project Monitoring and Control

Description : A company's break even point is 6,000 units per annum. The selling price is Rs. 90 per unit and the variable cost is Rs. 40 per unit. What are the company's annual fixed costs? (a) Rs. 120 (b) Rs. 2,40,000

Last Answer : 5,40,000

Description :  The actual output of 162,500 units and actual fixed costs of Rs. 87000 were exactly as budgeted.  However, the actual expenditure of Rs 300,000 was Rs. 18,000 over budget. What was the budget variable cost per unit?

Last Answer : (a) Rs 1.20

Description : In the stock-price beta estimation for the Coca-Cola Company, the dependent variable is the: A. return on Coca-Cola. B. price of Coca-Cola stock. C. return on the S&P 500. D. value of the S&P 500 Index.

Last Answer : A. return on Coca-Cola.

Description : Which of the following activity is not the part of project planning? A. project estimation B. project scheduling C. project monitoring D. risk management

Last Answer : C. project monitoring

Description : What effect does an increase in volume have on A UNIT FIXED COSTS B UNIT VARIABLE COSTS C Total Fixed Costs D Total Variable Costs?

Last Answer : Feel Free to Answer

Description : Which of the following costs would be considered a fixed cost? A. Raw materials. B. Depreciation. C. Bad-debt losses. D. Production labor.

Last Answer : B. Depreciation.

Description : Which of the following costs is related to marginal cost? (1) Variable Cost (2) Implicit Cost (3) Prime Cost (4) Fixed Cost

Last Answer : (1) Variable Cost Explanation: In economics, marginal cost is the change in the total cost that arises when the quantity produced is Incremented by one unit. That is, it is the cost of producing one more ... in the short run. It is only the variable costs that vary with output in the short run.

Description : Which of the following costs is related to marginal cost? (1) Variable Cost (2) Implicit Cost (3) Prime Cost (4) Fixed Cost

Last Answer : Variable Cost 

Description : If the activity level increases 10%, total variable costs will A. remain the same B. increase by more than 10% C. decrease by less than 10% D. increase by10%

Last Answer : D. increase by10%

Description : A company manufactures a single product for which cost and selling price data are as follows: Selling price per unit - Rs. 12 Variable cost per unit - Rs. 8 Fixed cost for a period - Rs. 98,000 Budgeted sales for a period - 30,000 units

Last Answer : (a) 20%

Description : If the fixed costs of a factory producing candles is Rs 20,000, selling price is Rs 30 per dozen candles and variable cost is Rs 1.5 per candle, what is the break-even quantity? (1) 20000 (2) 10000 (3) 15000 (4) 12000

Last Answer : (1) 20000 Explanation: Breakeven quantity is the number of incremental units that the firm needs to sell to cover the cost of a marketing program or other type of investment. It is given by the formula: BEQ = FC / (P-VC) Where ... per unit = 30/12 = Rs. 2.5 So 20000/ (2.5-1.5) = 20000/1= Rs. 20,000

Description : If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost ... the cost of manual excavation is (A) 500 cum (B) 1000 cum (C) 1500 cum (D) 2000 cum

Last Answer : (A) 500 cum

Description : If the fixed costs of a factory producing candles is Rs 20,000, selling price is Rs 30 per dozen candles and variable cost is Rs 1.5 per candle, what is the break-even quantity? (1) 20000 (2) 10000 (3) 15000 (4) 12000

Last Answer : 20000

Description : Costs that are not directly related to the products or services of the project, but are indirectly related to performing the project. A. Intangible Costs B. Sunk Cost C. Tangible Costs D. Indirect Costs

Last Answer : D. Indirect Costs

Description : Following information is available of XYZ Limited for quarter ended June, 2013 Fixed cost Rs. 5,00,000 Variable cost Rs. 10 per unit Selling price Rs. 15 per unit Output level 1,50,000 units

Last Answer : (a) Rs. 2,50,000

Description : )If the average total cost is Rs.54, total fixed cost is Rs.45000 and quantity produced is 2500 units, find the average variable costs (in Rs.) of the firm - (1) 24 (2) 18 (3) 36 (4) 60

Last Answer : (3) 36 Explanation: The standard method of calculating average variable cost is to divide total variable cost by the quantity, illustrated by this equation : Average Variable Cost = Total Variable Cost/ Quantity of ... , Average Total Cost = 45000/2500 = 18 So Average Variable Cost = 54 - 18= 36

Description : Marginal cost is computed as A. Prime cost + All Variable overheads B. Direct material + Direct labour + Direct Expenses + All variable overheads C. Total costs – All fixed overheads D. All of the above

Last Answer : A. Prime cost + All Variable overheads

Description : Which is appropriate description of Average Costs? a) The value of opportunities which have been lost by utilizing resources in particular service or health technology. b) The total costs (i.e. all the ... costs. d) The cost of the consumption of medicines is a good example of variable costs.

Last Answer : b) The total costs (i.e. all the costs incurred in the delivery of a service) of a health care system divided by the units of production. 

Description : If the average total cost is Rs. 54, total fixed cost is Rs. 45000 and quantity produced is 2500 units, find the average variable costs (in Rs.) of the firm : (1) 24 (2) 18 (3) 36 (4) 60

Last Answer : 36

Description : 3. S produces and sells one product, P, for which the data are as follows: Selling price Rs 28 Variable cost Rs 16 Fixed cost Rs 4 The fixed costs are based on a budgeted production and sales level of 25 ... period(a) 10.1% decrease (b) 11.2% decrease (c) 13.3% decrease (d) 16.0% decrease

Last Answer : (a) 10.1% decrease

Description : Breakeven point represents the condition, when the company runs under no profit no loss condition. In break even analysis, total cost comprises of fixed cost (A) Only (B) Plus variable cost (C) Plus overhead cost (D) Plus selling expenses

Last Answer : Option B

Description : During project estimation, project manager estimates following A. project cost B. project duration C. project effort D. all of the above

Last Answer : D. all of the above

Description : Algorithmic cost estimation in different organisations may be different for the same application development, because a) Different organisations consider complexity factors differently b) Different organisations may use ... measurement of productivity may vary e) All of the above may be true.

Last Answer : e) All of the above may be true.

Description : Which technique is applicable when other projects in the same analogy application domain have been completed? a) Algorithmic cost modelling b) Expert judgement c) Estimation by analogy d) Parkinson’s Law

Last Answer : c) Estimation by analogy

Description : A is developed using historical cost information that relates  some metric to the project cost. a) Algorithmic cost modelling b) Expert judgement c) Estimation by analogy d) Parkinson’s Law

Last Answer : a) Algorithmic cost modelling

Description : Which is the Estimation size should be known? a. Time estimation b. Effort estimation c. Cost estimation d. size estimation

Last Answer : b. Effort estimation

Description : _____ is the process of planning and controlling the development of a system within a  specified time frame at a minimum cost with the right functionality.  a. Project management  b. Symantic timeline  c. Task identification  d. Time estimation  e. Work plan

Last Answer : a. Project management

Description : Which of the following are parameters involved in  computing the total cost of a development project? a) Hardware and costs b) Effort costs c) Travel and training costs d) All of the mentioned

Last Answer : d) All of the mentioned

Description : )Quality costs include : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.  2. Only costs classified as prevention, detection and ... rework due to defects, customer returns and warranty costs.  4. The expense of upper management

Last Answer : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.

Description : Considers the total cost of ownership, or development plus support costs, for a project. A. Learning Curve Theory B. Life Cycle Costing C. Parametric Modeling D. Rate of Performance

Last Answer : B. Life Cycle Costing

Description : On a project the project manager should strive for a "Quality Level" that : 1. is the highest level possible  2. is as close to the project objectives as possible  3. represents the least cost to the project.  4. Exceeds the specified requirements of the project.

Last Answer : 2. is as close to the project objectives as possible

Description : What is the total cost in dollars for adding 1.0 million units of capacity to a production line with an automation level of 1.0 and floor space costs per unit of $6? Assume automation costs per unit of $4. a. $26 million b. $10 million c. $2.6 million d. $1 million e. none of the above

Last Answer : b. $10 million

Description : While assessing your project processes, you have identified some  uncontrolled process variations. Which of the following would be the  appropriate chart you may use for this purpose? Select one: a. Pareto diagram b. PERT chart c. Control chart d. HR personnel chart e. Critical path

Last Answer : c. Control chart

Description : the variations are...................in nature a. Random b. Consistent c. Complex d. Compound

Last Answer : a. Random

Description : Which of the following is least likely to be part of the calculation of the terminal- year incremental net cash flow for an energy-related expansion project? A. An initial working capital ... Disposal/reclamation costs C. Capitalized expenditures D. Salvage value of any sold or disposed assets

Last Answer : D. Salvage value of any sold or disposed assets

Description : Implicit costs are (a) equal to total fixed costs (b) comprised entirely of variable costs (c) payments for self-employed resources (d) always greater in the short run than in the long run

Last Answer : (c) payments for self-employed resources

Description : The crossover chart for l t for location break-even analysis shows where a. fixed costs are equal for alternative locations b. variable costs are equal for alternative variable costs are ... locations locations c. total costs are equal for alternative locations d. fixed costs equal variable

Last Answer : c. total costs are equal for alternative locations

Description : . Which of the following is empirical estimation technique? (i) expert judgement (ii) Delphi estimation (iii) COCOMO (iv) Critical path Method A. only i, ii & iii B. only i & ii C. only i, iii & iv D. All of the above

Last Answer : B. only i & ii

Description : Heuristics estimation technique depends on A. educated guess B. prior experience C. Common sense D. All of the above

Last Answer : D. All of the above

Description : Which of the following serves as project estimation technique? A. Empirical estimation B. Heuristic technique C. Analytical estimation D. All of the above

Last Answer : D. All of the above

Description : Which of the following serves as metrics for project size estimation? A. Lines of codes B. function point C. Number of persons D. Only A & B

Last Answer : D. Only A & B

Description : Science bases its estimation of the size of a product on a) Files (Fi), Flows (Fl) and Processes (Pr) b) Lines of Code (kLOC) c) Function Points (FP) d) operands and operators e) Feature Points (FeP).

Last Answer : d) operands and operators

Description : Which stage of project management life cycle requires the maximum time of  completion  A.Conceptualization  B.Planning  C.Execution  D.Estimation

Last Answer : C.Execution

Description : When using a function point estimation worksheet, there are 14 factors that impact the complexity of a project. These factors include _____.  a. data communications, time tradeoffs, and ... programming language  d. reports printed and PCA  e. x-rays, extensibility, and operational conversion

Last Answer : b. end-user efficiency, data communications, and reusability