The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The
height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the
falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by
Prismoidal formula, is
(A) 3250 m3
(B) 3225 m3
(C) 3275 m3
(D) 3300 m3
height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the
falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by
Prismoidal formula, is
(A) 3250 m3
(B) 3225 m3
(C) 3275 m3
(D) 3300 m3