The reduced levels of points, 30 metres apart along the longitudinal section of a road portion
between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the
road 120 in 1, the chainage of the point with no filling or cutting is
(A) (6 + 15) chains
(B) (6 + 12) chains
(C) (6 + 18) chains
(D) None of these
between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the
road 120 in 1, the chainage of the point with no filling or cutting is
(A) (6 + 15) chains
(B) (6 + 12) chains
(C) (6 + 18) chains
(D) None of these