The desirable camber for straight cement concrete roads, is
(A) 1 in 33 to 1 in 25
(B) 1 in 40 to 1 in 33
(C) 1 in 150 to 1 in 140
(D) 1 in 160 to 1 in 140

1 Answer

Answer :

Answer: Option D

Related questions

Description : The desirable camber for straight roads with water bound macadam or gravel surface, is (A) 1 in 33 to 1 in 25 (B) 1 in 40 to 1 in 33 (C) 1 in 150 to 1 in 140 (D) 1 in 160 to 1 in 140

Last Answer : Answer: Option B

Description : The desirable camber for straight roads with thin bituminous surfacing, is (A) 1 in 33 to 1 in 25 (B) 1 in 40 to 1 in 33 (C) 1 in 150 to 1 in 140 (D) 1 in 160 to 1 in 140

Last Answer : Answer: Option C

Description : On concrete roads, the camber generally provided, is (A) 1 in 20 to 1 in 24 (B) 1 in 30 to 1 in 48 (C) 1 in 36 to 1 in 48 (D) 1 in 60 to 1 in 72

Last Answer : Answer: Option D

Description : Normal blood pressure of man is – (1) 80/120 mm Hg (2) 90/140 mm Hg (3) 120/160 mm Hg (4) 85/150 mm Hg

Last Answer : (1) 80/120 mm Hg Explanation: Normal blood pressure is considered to be at or below 120 over 80 (120/80).

Description : One Astronomical unit is equal to how much Km in whole numbers? A. 160 million km B. 140 million km C. 150 million km (Answer) D. 130 million km

Last Answer : C. 150 million km (Answer)

Description : Nithish bought two purses which together cost him Rs.440. He sold one of the purse at a loss of 20% and the other one at a gain of 40%. The selling price of both purse are same. Then find out the cost price of both ... Rs.140 and Rs.300 c) Rs.170 and Rs.270 d) Rs.160 and Rs.280 e) None of the Above

Last Answer : 80/100 * x = 140/100 * y x = 7/4y x + y = 440 7/4 y + y = 440 y = 160 ; x = 280 Answer: d)

Description : What is the total number of students enrolled in all the three classes together ? (1) 150 (2) 125 (3) 140 (4) 160 (5) None of these

Last Answer : (5) None of these

Description : The average weight of M,N and O is 168 kg. If P joins the group, the average weight of the group becomes 160 kg. If another man Q who weighs 6kg more than P replaces M, then the average of N,O,P and Qbecomes158 kg. What is the weight of M? A) 175 B) 140 C) 145 D) 150 

Last Answer : D) M+N+O =168 * 3 =504 M+N+O+P=160*4=640……(1) P=136 kg and Q =142 kg N+O+P+Q =158*4 =632 N+O+P =632-142 =490…..(2) from 1 & 2, M=640-490 =150kg

Description : For batching 1:3:6 concrete mix by volume, the ingredients required per bag of 50 kg cement, are: (A) 70 litres of sand and 120 litres of aggregates (B) 70 kg of sand and 140 litres of ... C) 105 litres of sand and 140 litres of aggregates (D) 105 litres of sand and 210 litres of aggregates

Last Answer : Answer: Option D

Description : Before providing super-elevation on roads, the portion of the carriageway between the crown and the outer edge is made (A) To have a reduced fall (B) Horizontal (C) To have slope of the camber on the other half of the carriageway (D) None of these

Last Answer : Answer: Option C

Description : On earth roads, the camber should preferably be (A) 1 in 20 to 1 in 24 (B) 1 in 30 to 1 in 48 (C) 1 in 15 to 1 in 20 (D) 1 in 10 to 1 in 15

Last Answer : Answer: Option A

Description : The minimum value of camber provided for thin bituminous surface hill roads, is (A) 2.2 % (B) 2.5 % (C) 3.0 % (D) 3.5 %

Last Answer : Answer: Option B

Description : The camber for hill roads in case of bituminous surfacing is adopted as (A) 2 % (B) 2.5 % (C) 3 % (D) 4 %

Last Answer : Answer: Option B

Description : The camber of shoulders in water bound macadam roads is (A) Equal to the cross slope of pavement (B) Less than the cross slope of pavement (C) Greater than the cross slope of pavement (D) Zero

Last Answer : Answer: Option A

Description : Hill roads are (A) Provided camber along spur curves (B) Provided camber along valley curves (C) Seldom provided a camber (D) None of these

Last Answer : Answer: Option C

Description : Pick up the correct statement from the following: (A) The cross fall of the shoulder should be at least 0.5% steeper than camber (B) On super-elevated sections, the shoulders should be provided a ... equal to camber (C) Earthen roads in general are provided steepest cross-fall (D) All the above

Last Answer : Answer: Option D

Description : The minimum quantity of cement to be used in controlled concrete is (a) 120kg/cm2 (b) 160 kg/cm2 (c) 220 kg/cm2 (d) 280 kg/cm2

Last Answer : (c) 220 kg/cm2

Description : Q.61. CA Co manufactures a single product and has drawn up the following flexed budget for the year.  60% 70% 80%  Rs Rs Rs Direct materials 120,000 140,000 160,000 Direct labour 90,000 105,000 120,000 Production ... activity? (a) Rs 330,300 (b) Rs 370,300 (c) Rs 373,300 (d) Rs 377,300

Last Answer : (b) Rs 370,300

Description : Nesha scored 120 out of 150 in English, 120 out of 180 in mathematics and 160 out of 200 in Science. Find Nesha’s score as percentage: (i) in Mathematics (ii) in all the three subjects (on the whole). a) 66 2/3, 78 22/51 b) 71 23/5, 45 7/31 c) 54 13/33, 82 3/4 d) 60 3/4, 76 32/41 

Last Answer :  Answer: A (i) Percentage scored in Mathematics = 120/180 100  = 12000/180  =1200/18  = 66 2 /3 % (ii) Total maximum of all the three subjects = 150 + 160 + 200 = 510 and Total score in the ... percentage on the whole = (400/510 100)  = (40000/510)  = 4000/51  = 78 22/51 %

Description : The critical combination of stresses for corner region in cement concrete roads is (A) Load stress + warping stress frictional stress (B) Load stress + warping stress + frictional stress (C) Load stress + warping stress (D) Load stress + frictional stress

Last Answer : Answer: Option C

Description : If the permissible stress in steel in tension is 140 N/mm², then the depth of neutral axis for a singly reinforced rectangular balanced section will be (A) 0.35 d (B) 0.40 d (C) 0.45 d (D) Dependent on grade of concrete also

Last Answer : Answer: Option B

Description : A stratum of clay 2 m thick will get consolidated 80% in 10 years. For the 80% consolidation of 8 m thick stratum of the same clay, the time required is (A) 100 years (B) 120 years (C) 140 years (D) 160 years

Last Answer : Answer: Option D

Description : The camber on pavements, is provided by (A) Straight line method (B) Parabolic method (C) Straight line and parabolic at crown (D) Elliptical method

Last Answer : Answer: Option C

Description : Camber in pavements is provided by (A) Straight line method (B) Parabola method (C) Straight at the edges and parabolic at the crown (D) All the above

Last Answer : Answer: Option D

Description : If the various concrete ingredients i.e. cement, sand and aggregates are in the ratio of 1:3:6, the grade of concrete, is (A) M 100 (B) M 150 (C) M 200 (D) M 250

Last Answer : Answer: Option A

Description : What is the limit of MG/DL, of blood sugar in the normal person at the time of fast? (1) 40-60 (2) 120-150 (3) 70-100 (4) 160-200

Last Answer : (3) 70-100 Explanation: The mean normal blood glucose level in humans is about 4 mM (4 mmol/L, or 72 mg/dL, i.e. milligrams/deciliter); however, this level fluctuates throughout the day. Glucose ... day (termed "the fasting level"), and rise after meals for an hour or two by a few millimolar.

Description : What is the limit of MG/DL of blood sugar in the normal person at the time of fast ? (1) 40-60 (2) 120-150 (3) 70-100 (4) 160-200

Last Answer : 70-100

Description : Ordinary concrete is not used for concrete grade (A) M 100 (B) M 150 (C) M 250 (D) M 40

Last Answer : (D) M 400

Description : The maximum hourly consumption, is generally taken as  (A) 110 %  (B) 120 %  (C) 140 %  (D) 150 %

Last Answer : (D) 150 %

Description : The process of mixing, transporting, placing and compacting concrete using Ordinary Port land Cement should not take more than (A) 30 minutes (B) 40 minutes (C) 60 minutes (D) 90 minutes

Last Answer : Answer: Option A

Description : For the construction of cement concrete dams, the maximum permissible size of the aggregates, is (A) 40 mm (B) 50 mm (C) 60 mm (D) 70 mm

Last Answer : Answer: Option A

Description : Minimum required water cement ratio for a workable concrete, is (A) 0.30 (B) 0.40 (C) 0.50 (D) 0.60

Last Answer : Answer: Option B

Description : A had Rs. 160 and B had Rs 140. A spent `20%` and B spent `30%` of the money they had. Who spent more money ?

Last Answer : A had Rs. 160 and B had Rs 140. A spent `20%` and B spent `30%` of the money they had. Who spent more money ?

Description : Normal blood pressure of man is - (1) 80/120 mm (2) 90/140 mm Hg (3) 120/160 mm Hg (4) 85/120 mm Hg

Last Answer : (1) 80/120 mm Explanation: Normal blood pressure is considered to be at or below 120 over 80 (120/80). Normally, blood pressures are usually categorized into three groups: low (90/60 or*lower), high ( 140 / 90 or higher), and normal (values above 90/60 and below 130/80).

Description : For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of A. 100 cm B. 120 cm C. 140 cm D. 160 cm

Last Answer : ANS: D

Description : The subcritical steam generators operate between a pressure ranges of? (rra) 120-160 bar (rrb) 100-110 bar ( c) 130-180 bar (rrd) 140- 200 bar

Last Answer : ( c) 130-180 bar

Description : Ashwini has a certain number of Pencils she wishes to distribute in the class. when she tries to distribute 7 pencils to each student, 3 pencils are left out. if the class had 3 less students, each student would have ... How many pencils does Ashwini have? a) 90 b) 120 c) 140 d) 160 e) None of these

Last Answer : Let number of students be X. so, total Pencils = 7X + 3 7X + 3 = (7+2) (X-3) or., 7X + 3 = 9X – 27 or X = 15 total Pencils = 7X + 3 = 108 Answer: e)

Description : 24+(72 ÷ 48×8+14) × 36 ÷ (3×4) + 36 ÷ 3 ×4 a) 120 b) 140 c) 160 d) 180 e) None of these

Last Answer : 72÷48×8+14 = (72/48) × 8 + 14 = (3/2) × 8 + 14 = 12 +14 = 26 24 + (72 ÷ 48 × 8 + 14) ×36 ÷ (3 × 4) + 36 ÷ 3 × 4 = 24 + 26 × 36÷12 + 36 ÷ 3 × 4 = 24 + 26 × 3 + 12 × 4 = 24 + 78 + 48 = 150 Answer: e)

Description : Two train travel in opposite directions at 36 kmph and 45 kmph and a man sitting in slower train passes the faster train in 8 seconds. Then length of the faster train is: A.120 m B.140 m C.160 m D.180 m E.None of these

Last Answer : Answer – D (180 m) Explanation – When OPP. direction-PLUS Relative speed = (36 + 45) km/hr = [81 x 5/18] m/sec = [45/2] m/sec. Length of train = [45/2 x 8] m = 180 m.

Description : Presently how many countries have implemented GST? (A) 102 (B) 120 (C) 140 (D) 160

Last Answer : (D) 160

Description : What is the Highest speed of train in Indian Railway a. 140 KMPH b. 120 kmph c. 160 kmph* d. 130 kmph

Last Answer : c. 160 kmph*

Description : Normal blood pressure of man is (1) 80/120 mm Hg (2) 90/140 mm Hg (3) 120/160 mm Hg (4) 85/120 mm Hg

Last Answer : 80/120 mm Hg

Description : The slump recommended for mass concrete is about (A) 25 mm to 50 mm (B) 50 mm to 100 mm (C) 100 mm to 125 mm (D) 125 mm to 150 mm

Last Answer : Answer: Option A

Description : The maximum thickness of concrete floor of a cement warehouse, is (A) 10 cm (B) 15 cm (C) 20 cm (D) 25 cm

Last Answer : (D) 25 cm

Description : Specific weight of Reinforced cement concrete is [ A ] 24 N/m3 [ B ] 24 kN/m3 [ C ] 25 N/m3 [ D ] 25 kN/m3

Last Answer : [ D ] 25 kN/m3

Description : High strength of concrete requires a water cement ratio of [ A ] 0.10 to 0.15 [ B ] 0.25 to 0.30 [ C ] 0.45 to 0.60 [ D ] 0.75 to 0.90

Last Answer : [ B ] 0.25 to 0.30

Description : Is it desirable to use concrete of very high strength i.e. exceeding 60MPa? What are the potential problems associated with such high strength concrete?

Last Answer : To increase the strength of concrete, say from 40MPa to 80MPa, it definitely helps in improving the structural performance of the structure by producing a denser, more durable and higher load ... Moreover, owing to a low aggregate content of high strength concrete, creep and shrinkage increases.

Description : An excess of flaky particles in concrete aggregates (A) Decreases the workability (B) Increases the quantity of water and sand (C) More than 15% are not desirable (D) All the above

Last Answer : Answer: Option D

Description : In water bound macadam roads, binding material, is (A) Sand (B) Stone dust (C) Cement (D) Brick dust

Last Answer : Answer: Option B

Description : The percentage of voids in cement is approximately (A) 25 % (B) 40 % (C) 60 % (D) 80 %

Last Answer : (B) 40